Burberryswine
Member
Def some new stuff at the back as u can see it has changed a lot.
Def some new stuff at the back as u can see it has changed a lot.
Same aircraft. That rearfacing boom is really out there. I believe that place usually stores the APU but behind it now is a huge housing.Def some new stuff at the back as u can see it has changed a lot.
I kinda dig the green primer paintIt hopefully hasn't gotten its final paintjob.
Same aircraft. That rearfacing boom is really out there. I believe that place usually stores the APU but behind it now is a huge housing.
View attachment 83359
View attachment 83360
Maybe we should divert all resources to sensor programs, we're good at thoseTAI GM: "Qualification flights for two aircraft in the SOJ project are ongoing. Testing is proceeding at a brisk pace on the two aircraft—one equipped with mission systems and the other with exterior modifications completed.
In collaboration with ASELSAN and the SSB, we aim to deliver the two aircraft next year."
TAI GM says only two aircraft are being near ready at this stage. There is a huge delay, but in contrast to the last image we saw of TC-SJB, program is being changed considerably with more capabilities being added. It remains to be seen how great of an idea is it that a program delayed this much is being changed at this stage, but we will see.
Whats Ritalin,some sort of English food we normal people cant digest?We need to start out entire defence industry leaders and military decision makers on Ritalin, because at this point I am almost absolutely sure they all have attention deficit disorder. No focus, jumping from project to project, changing requirements or adding stuff constantly instead of just finishing one and going about with serial production, even just LRIP.
Ritalin is a prescription psychostimulant medication that acts on the central nervous system; its active ingredient is methylphenidate.We need to start out entire defence industry leaders and military decision makers on Ritalin, because at this point I am almost absolutely sure they all have attention deficit disorder. No focus, jumping from project to project, changing requirements or adding stuff constantly instead of just finishing one and going about with serial production, even just LRIP.