Just what i have told months or years ago: DzKK do not want any further modifications -permanent - on Anadolu. Sad to hear it is verified by Navantia but not SSB. DzKK wants to get Anadolu ASAP, use it, experience it, master it and train the units - flotilla.
And once again, the preparations are for Trakya. It will be a decent Light-AC specifically designed for this mission able to launch recover Hurjet, MIUS, TB3 and one another. The visual from SSB are only an early concept.
A third one is on the table for beyond 2035-40. Even second can be thought of after second batch of TF-2000 is ordered. For now we are bound to be satisfied with Anadolu. Second unit's construction will commence before 2030 but may conclude in past 2035. Meanwhile 4 of TF-2000 will be delivered and 5th one will join the team along with Trakya.
Told it when MIUS visuals are given on Anadolu and claimed those are not feasible moreover is not real, here are the news: They use Anadolu just because they have got no permission to post Trakya's concepts, moreover they don't have it in their hands.
Anadolu will launch UAV, nonetheless, just not as a primary role again as i have told, merely as a recon/first strike unit.
IMO third one should be named "Vatan" without any TCG call code.