2 maestrale + 6 bergamini, 2 ah 140, 6/8 mogami?Italian Frigates, English (Danish) Frigates and hopefully Japanese Frigates deal soon
2 maestrale + 6 bergamini, 2 ah 140, 6/8 mogami?Italian Frigates, English (Danish) Frigates and hopefully Japanese Frigates deal soon
Well, they better give us good Scorpene and Rafale deal now.Frenchi lately got bitter and histerical, after they lost opportunity in Indonesia (Italian FREMM debut worth five Billion US Dollar) , now they are looking their old good rival the UK with their cousin country US grab the Australian Submarine Mega deal (well Australian is UK and US protege in the first place) now the Indonesian again put salt on the wound with latest contract of Babcock arrowhead 140 design.
For better or worse, Expect more nuke subs (especially Aus and US) in our water in the future.
Riachuelo class like sub (maybe with AIP) or Soryu class is enough for now. I'm still waiting for that USD$ 600 million used Sub.To be honest, the French Scorpene is not giving much edge toward our competitor in the region (well our aim should be Australian and China) , if we can get something like Soryu class then it would be better. Or else going up toward Baracuda SSN is more better. (Though i don't think we are ready for SSN considered our maintenance culture)
ahh, about this one. I really forget it. I hope this is the ship build for IDNavy.They can build it if you want to
The signals were strong, but until today no official leaks released.Japanese Frigates deal soon
Well, err, nganu, duhh......Soryu class then it would be better. Or else going up toward Baracuda
Construction for AH140? they said it will be built in Indonesia under license, that means we will be constructing it from ground zero because it's a new design, it will took much longer time for us, considering Italian and French Fremm built by their own shipbuilder took about 3 years for each ship, i don't think we will handle AH140 that fast, even our first KRI R.E.M took about 3,5 years to completeDoes 4 years is enough to build 2 of these ship (excluding fitting out), so the dock can be used to build FREMM.
Busy busy busy
yeah, more over if our AH 140 not really same with Royal Navy versionConstruction for AH140? they said it will be built in Indonesia under license, that means we will be constructing it from ground zero because it's a new design, it will took much longer time for us, considering Italian and French Fremm built by their own shipbuilder took about 3 years for each ship, i don't think we will handle AH140 that fast, even our first KRI R.E.M took about 3,5 years to complete
*i just noticed the layout of def hub has updated
Remember my messages back then ? Those consultants couldn't redesign a ship but only provide engineering and integration assistance.And the hired Turkish-German consultants?
Iver huitfeldt is also a proven design, that is also claim of team31 / babcock while they present arrowhead designI think they canceled it. Proven design win.
Stretch version from PAL isn't.Iver huitfeldt is also a proven design, that is also claim of team31 / babcock while they present arrowhead design
'based on a proven design'.
Neither Arrowhead design is proven in these terms, nor sailing yet and it is not Type31.Stretch version from PAL isn't.
the sad thing is, when the budget did materialize we all know what happen to the budget right? majority went to the personal pocket of those in charge and the acquisition is based not on the required capability to deter potential foes, but which makelar have better connection and provide better dakom.Yes a certain group of people here (in Indo) did not believe that any high intensity/conventional conflict would occur in the future~
Thus we don't need to modernise our military~
Well, err, nganu, duhh......
EVEN WITH CURRENT SUBMARINE FLEET, INDONESIAN CAPABILITY TO MAINTENANCE SUBMARINE STILL A BIG RED QUESTION MARK.
or even worst, we couldn't afford to pay operational cost. *flies away