BMC should first deliver the promised tanks before even dreaming about jet engines...BMC will go all out with engine development. Jet fighter engine followed by turbine aircraft carrier engine. Go tiger!
Then those engines should be delivered to BMC for altay to be delivered.BMC should first deliver the promised tanks before even dreaming about jet engines...
I have no doubt they will. BMC is the major partner of TR Motor, I have no doubt they will deliver either. I have no doubt they will go beyond that. You don't have faith in Turkey's ability to achieve? Wait and see.BMC should first deliver the promised tanks before even dreaming about jet engines...
Engine could be found if needed Germany isnt the only producer of engines. So what do you expect then for BMC to wait another 10 maybe 15 years until a engine is developed let alone produced in adequate numbers?Then those engines should be delivered to BMC for altay to be delivered.
I am tired of people bashing a company BMC for things out of their control, no matter who got the Altay deal they wouldn't be able to deliver it because germany is refusing to export the engine/transmission.
We will see...I have no doubt they will. BMC is the major partner of TR Motor, I have no doubt they will deliver either. I have no doubt they will go beyond that. You don't have faith in Turkey's ability to achieve? Wait and see.
Engine could be found if needed Germany isnt the only producer of engines. So what do you expect then for BMC to wait another 10 maybe 15 years until a engine is developed let alone produced in adequate numbers?
You know what i am tired of? People who defend this obvious corruption for their political idology, fact remains that we dont have modern tank to deploy in battlefield because of the mismanagements of the polical elite while our soldiers get sent to Syria with 60+ year old tanks and no speech of ''NATO's second biggest army hurr durr'' is gonna change those facts.
We will see...
Whats agressive about what i wrote?Dude you are so aggressive and write stupid things, do you think people aren't looking for other engines?
Do you think the people in the government and the BMC are that stupid.
Bro, you dont know the hole story of Erdogan buddy Ehtem Sancak, owner of BMC. They got every kind of different project, without any knowledge, experience capacity or capability, just because of nepotism.Dude you are so aggressive and write stupid things, do you think people aren't looking for other engines?
Do you think the people in the government and the BMC are that stupid.
Bro, you dont know the hole story of Erdogan buddy Ehtem Sancak, owner of BMC. They got every kind of different project, without any knowledge, experience capacity or capability, just because of nepotism.
Knowledge, capacity and capability can be built but you can't work with someone who does not intend to give you power but only want to take your money. Ekrem Sancak is striving to establish an industrial base to foster Turkey's military machine. There is no match for this kind of commitment.
If a state give a contract to a company to build 4.Generation tank, it doesnt hope that the company will reach all the necessary capability anytime to build the tank. It must HAVE all the capability right NOW. Not anytime soon. BMC employee reached nothing by hard work. Just buying some ToT from Hatehov or elsewhere.Knowledge, capacity and capability can be built but you can't work with someone who does not intend to give you power but only want to take your money. Ekrem Sancak is striving to establish an industrial base to foster Turkey's military machine. There is no match for this kind of commitment.
You can't wait a couple more years to see the result of the efforts made now although you have waited a lifetime to see the nothing offered by the predecessors.Do you really believe that He does all that just because of his pure patriotic heart and not because a looooot of state money will be made and put in the right pockets even if not 10 tanks get delivered in the end?
Come on bro, if you tell me that this whole Altay fiasco doesn’t reek of corruption and mismanagement you are probably lying to yourself.
This is so naive, where the hell have you found everything ready that you want it now? The tank project started without an indigenous engine requirement and evolved into one that is fully indigenous. It is because Erdoğan insisted on a fully indigenous tank. It is both about building a tank arsenal and about building a tank making industrial base. Who cares if it is acquired through the work of certain engineers and not certain others? BMC have brought together the engineers that can make it happen, period.If a state give a contract to a company to build 4.Generation tank, it doesnt hope that the company will reach all the necessary capability anytime to build the tank. It must HAVE all the capability right NOW. Not anytime soon. BMC employee reached nothing by hard work. Just buying some ToT from Hatehov or elsewhere.
Make a project, evolve it with requirements into something that none can fulfill, give the Tank and the Engine project to your friend who has zero expertize in either of them, only a genious/corrupt goverment could come up with such a plan...This is so naive, where the hell have you found everything ready that you want it now? The tank project started without an indigenous engine requirement and evolved into one that is fully indigenous. It is because Erdoğan insisted on a fully indigenous tank. It is both about building a tank arsenal and about building a tank making industrial base. Who cares if it is acquired through the work of certain engineers and not certain others? BMC have brought together the engineers that can make it happen, period.
Make a project, evolve it with requirements into something that none can fulfill, give the Tank and the Engine project to your friend who has zero expertize in either of them, only a genious/corrupt goverment could come up with such a plan...
Fact is: there is no tank after 4 years of schedule for mass production, nor is there a engine prototype, hell not even the factory exists, all Ethem Sancak has done so far was to get BMC for a bargain from TMSF.
And you guys come here and tell us to ''believe'' and ''have faith'', well i guess thats why so many things go the wrong way in Turkey because you guys only believe instead of looking at facts and calling wrong things out.
We should have gotten our 1000th tank delivered at the end of this year but you guys prefer to believe in some miracles...
Now thats a agressive post because it p*sses me off how you guys defend people who only fill their pockets at the expense of our soldiers and people just because of partizan point of view...
Spot on for the most part. But I would bet on the national industry to come up with production solutions to hard to make parts than rely on foreign parties.TFX prototype engines will be f110GE129E. These are the “twin engine optimised“ f15 engines. They develop ~29500lbf thrust. The engine that is going to go on the TFX , hence need to be similar in size to f110 family.
The engine drawing that TRMotor has shown in it’s site is more like the f110GE132. Especially the blisk structure and the high bypass configuration of the engine has similarities with the 32500lbf thrust developing , GE132 engine.
So unless RR comes up with an engine that is of the same ilk, there is no chance for RR to be included in the TFX engine program. I would still look favourably to a Kale/RR cooperation engine in 29000+ lbf thrust area with TVC like the ej200 tvc they have.
At the moment TEI is the only company in Turkey that has the necessary credentials to produce a jet engine that can furnish TFX. But producing a radial flow turboshaft engine is not enough reason to expect from TEI , a turbofan engine like F110 , in short term. If they had GE cooperation , may be! Even though they have been able to produce all the critical single crystal parts that operate at high temperatures for both t700 and the ts1400 engines, producing the more complex and larger parts of the turbofan engine is a different ball game.
Quickest and most logical route would be to allow RR to produce the engine with Kale and sell it to TAI with all third party sales restrictions waived. It is naive to think that any company will relinquish their IP right over to a third party when it is jet engine technology in question.