well should we make a bet on it? and my bet 1-1
well should we make a bet on it? and my bet 1-1
Hoaaa, fixed array radar?surely everyone like Italian FREMM, France makes bad choice when they replacing FREMM with FDi for export market. And about the radar i hope we could get like that too.Fincantieri FREMM air defense frigate
looks like they are using the french FREMM design for reference picture , that hull and deck sure looks like more aquitaine compared to italian fremm .Fincantieri FREMM air defense frigate for the Moroccan Navy.
Could be. Looks like for the main gun they chose the Volcano.looks like they are using the french FREMM design for reference picture , that hull and deck sure looks like more aquitaine compared to italian fremm .
Its possible for Japan but for Indonesia it will take longer time, maybe Prabowo will like it bisa jadi bahan kampanye.Under a provisional plan, Japan would deliver four of the 3,900-ton frigates beginning in late 2023 or early 2024
Is that RIM-116 RAM?Fincantieri FREMM air defense frigate for the Moroccan Navy.
Otomat EVO ?Brahmos, Neptune, Atmaca, Marte ER ?
Excerpts.
"On its face, the deal, signed during a visit to Tokyo by the Indonesian foreign and defense ministers for “2+2” talks with their Japanese counterparts, is certainly noteworthy. It could reportedly lead to the transfer of eight Japanese Mogami-class multimission frigates to the Indonesian navy, a deal worth up to $3.6 billion. Under a provisional plan, Japan would deliver four of the 3,900-ton frigates beginning in late 2023 or early 2024, with the other four slated to be built at the Indonesian state-run firm PT PAL’s shipyard in the port city of Surabaya."
Indonesia’s Military Modernization Must Go Beyond New Hardware
When Japan signed a deal with Indonesia in March enabling it to export defense equipment to the Southeast Asian country, some media outlets highlighted the supposed shared interests between Japan and Indonesia in countering China. According to the Associated Press, for example, the agreement...www.worldpoliticsreview.com
Maybe thats why there isn't any scheduled delivery from PT PAL part.Its possible for Japan but for Indonesia it will take longer time, maybe Prabowo will like it bisa jadi bahan kampanye.
NSM ?Brahmos, Neptune, Atmaca, Marte ER ?
I'd even say we could match or slightly pass RAN if the projects are able to be executed in time and on budget. As things stand, several RAN major project is at risk of overtime and over budget (last I heard the CEAFAR is still too heavy for Type 26, and the Attack class sub still haven't left the drawing board)This one of the most massive Naval building in the region (ASEAN and OCEANIA) if materialized properly and on time, we would only slightly behind the Australian Navy Naval build up
Mayybeee? In terms of hulls and tonnage(including the other project that is still unconfirmed), but how about cost/budget?I'd even say we could match or slightly pass RAN if the projects are able to be executed in time and on budget. As things stand, several RAN major project is at risk of overtime and over budget (last I heard the CEAFAR is still too heavy for Type 26, and the Attack class sub still haven't left the drawing board)
I'd even say we could match or slightly pass RAN if the projects are able to be executed in time and on budget. As things stand, several RAN major project is at risk of overtime and over budget (last I heard the CEAFAR is still too heavy for Type 26, and the Attack class sub still haven't left the drawing board)