When do these engines suppose to finish?
Latest Thread
When do these engines suppose to finish?
The engines themselves are ready but the problem is in the transmission system to be coupled with these systems. BMC Power had difficulty with such transmissions but recent TheInsider post indicates that the transmission itself is near completion. Probably the powerpack (engine + transmission) will be integrated into the Altay by 2024When do these engines suppose to finish?
BMC Power has been doing a lot of good stuff latelyThere is good news about the BATU powerpack. The engine satisfied all of the requirements on the bench runs. Bench tests of the transmission progressed a lot and coupled tests are expected to start. This is the last step before integrating the powerpack prototype into the tank. It seems that the target date of 2024 will be realized.
aha the answer was just one post aboveThe engines themselves are ready but the problem is in the transmission system to be coupled with these systems. BMC Power had difficulty with such transmissions but recent TheInsider post indicates that the transmission itself is near completion. Probably the powerpack (engine + transmission) will be integrated into the Altay by 2024
BMC Power has been doing a lot of good stuff lately
Hopefully Turkey will finally gain independence from Western embargoes on land platforms; particularly, filthy Germany
I was wondering the same thing but also can’t help but think about the German embargo. So, I’m wondering if we should even do it.Btw, can Batu engine be coupled with renk transmission?
Were you on Ankara or Adapazarı event of BMC today, By any chance?There is good news about the BATU powerpack. The engine satisfied all of the requirements on the bench runs. Bench tests of the transmission progressed a lot and coupled tests are expected to start. This is the last step before integrating the powerpack prototype into the tank. It seems that the target date of 2024 will be realized.
Like if we it can be do we can start the engine test earlier, until the local transmission is ready. I suppose we should have some MTU engines and Renk transmissions.I was wondering the same thing but also can’t help but think about the German embargo. So, I’m wondering if we should even do it.
If Engines weren't up to spec Army wouldn't accept them. TSK is rigorous testing new products, I remind everyone how long it took Anka to get accepted by our armed forces. If they say OK then it is good in my book.I don't think bmc's engine can meet the requirements. We do not make water engines, how many countries in the world can do it? Does Bmc have such an infrastructure and experience? We should increase investments and support Tümosan.
didnt we had an already in progress engine for ATAK-2?For ATAK 2, the turboshaft engine will be developed over the TF6000 core.
didnt we had an already in progress engine for ATAK-2?
No. We will use Ukraine engine for Atak-2.didnt we had an already in progress engine for ATAK-2?
Good news but is there any progress on "fuel pump, oil pump, gearboxes and so on", I wish they would have asked that as well.Explanations on the TF6000 engine from Mahmut Faruk Akşit
TF10000AB afterburner turbofan engine will be developed
For ATAK 2, the turboshaft engine will be developed over the TF6000 core.
I don't think TEI should waste time with those accessories. TEI should outsource those accessories from companies like Alp Havacılık etc.Good news but is there any progress on "fuel pump, oil pump, gearboxes and so on", I wish they would have asked that as well.
What really surprised me was that TEI company has not done this until now. Has TEI encountered the same problems in the TS-1400 project? Or did the accessories issue occur with the TF6000 engine?I don't think TEI should waste time with those accessories. TEI should outsource those accessories from companies like Alp Havacılık etc.