Latest Thread
So S5 construction also has started according to this report.It's commissioning today!
The 3rd Arihant-class nuclear-powered ballistic missile submarine (hull S4, pennant SSBN-82).
The S4 marks the advent of the "Arihant-Stretch" sub-class. Biggest outwardly visible change being the expansion of missile launch cells from 4 to 8.
View attachment 79812
So S5 construction also has started according to this report.
defencehub.live
So apparently, NSTL is testing this design, lack of a missile hump implies this is an SSN:
View attachment 58976
It does not necessarily mean that the upcoming Project-75A/76 SSN will have a pumpjet, or that this is indeed the indigenous SSN design (could just be a case-study of a generic modern SSN boat). But it's definitely interesting.
Based on the most recent reliable information, the size & shape of the Project-77 SSN program becomes clearer:
What is confirmed by reliable sources so far:
- It will indeed displace around 10,000T (one figure quoted by an older source states a very specific 9,800T figure). So very much in the league of Russia's Yasen, China's future Type-095 & upcoming AUKUS boats, and significantly bigger than UK's Astute, France's Suffren or the earlier blocks of US' Virginia-class boats.
- It will be powered by a 190-200 megawatt PWR known as CLWR-B2. A shore-based prototype of which is known to have been in existence at least as of 2018.
- It will have VLS capability. Described as having "close to a dozen" VLS cells of the 'large' variety, so would be capable of launching likes of BrahMos/future Scramjet-based Hypersonics & possible ASBMs.
What has not been confirmed so far:
- Whether it will be a single-hulled or double-hulled design.
- Whether it will have an X-form rudder or conventional rudder/tail planes.
- Whether Nuclear-Electric Propulsion (NEP), aka Turbo-Electric Drive will be implemented or not.
- Whether the boat will have a Pump-Jet Propulsor (PJP) or not. The PJP & NEP might be tied to each other, and will have implications on whether we follow the Russian doctrine of speed over stealth or if we choose to go with Western doctrine. This is the most interesting part to look forward to as Pumpjet & NEP is pretty much guaranteed to find application on the S-5 SSBN program, which is in a much more advanced stage than the SSN (first 2 boats already in construction). So we know that whether we put it on the SSN or not will come down to doctrinal choices.
What has not been confirmed, but is extremely likely nevertheless:
- It will make use of conformal sonars. Especially a Conformal Bow Array (CBA) along with flank arrays integrated into the hull. Provision of towed array will anyway be there.
Fourth and Final Arihant class SSBN S5 Arisudan expected to be commissioned this year or early next year.
24 K4/K5 or 72 K15 missile capacity
2028 is more likely. The fourth boat started sea trials only in December 2025, a minimum of 2 years is a given. So late 2027/early 2028 completion of trials. Commissioning a few months afterward so mid-2028.
Lol, no.
It'll be a Stretched boat, same as the 3rd one (Aridhaman), so either 8 K4 or 24 K15 maximum.
K5 physically cannot fit any Arihant-class boat, it's diameter is too huge (at 2.4m, it's almost twice as big as K4's 1.3m).
Only the future S5-class SSBNs can carry the K5/K6.
I mentioned the capacity of all 4 SSBN or INs strategic weapons capability. Not for Arisudan.
I am not sure regarding commissioning cos after INS Arihant & Aridhaman other subs commissioning went quite faster.
Again, dates arent being shared when they started sea trials generally. But even by Indian standards, SSBN induction has been quite faster.Ah, ok.
But all 4 subs will not be available at the same time though, only 1 or at best 2 will be in a ready-to-launch state at any given time.
The build rate does get faster as you make more boats, but there's no shortcuts in Sea Acceptance Trials (SATs).
The Arihant-class is pretty unique in a way because so far, every boat was significantly different from the last*. This does not usually happen on other SSBN classes but we have to use these boats to prove a lot of techs & implement constant, iterative improvements if we want to catch up with China by the time we commission S-5 class & P-77 SSNs.
*Arihant was the first-ever nuclear submarine we ever built so a lot of unknowns all around, not just with the construction itself but with all the component suppliers for the boat + the reactor. Arighat took a lot more time than a typical 2nd-of-class should because it brought an improved reactor configuration online and that was essentially like building an all-new class cuz N-subs are pretty much "built around the reactor"...you change the reactor, you have a change a whole lot of things (they say the new reactor came online with 3rd boat but I don't buy it. The timeline only makes sense if it came with 2nd boat). Aridhaman was the first 'stretched' variant with an additional 4-missile plug compartment and we had to go back to the drawing board to recertify the hull for a different CoG/CoM. Arisudan is supposed to be a simple repeat of Aridhaman but that's to be seen. I won't be surprised if it turns out we've plonked a pumpjet on the 4th boat to de-risk future developments.
That said, all boats have taken 2-3 years in SATs, regardless of new reactor or not, so indeed there are no shortcuts there. Minimum 2 years would be my guess.
We'll see.