Out of interest what are the major factors that govern/preclude (small-class) STOL-retrofit on a LHD, assuming cost/down-time is no issue? (Or is cost/down-time the major issue?)
Deck strength (for landing impulse loads), deck layout (and width), elevator layout, arresting wires, arresting...