I hope Firtina wins but I have feeling Korean Banks are gonna jump in with favorable offers. (Romnia have been shopping quite a lot lately, I doubt they have the ready cash to pay for it)
Latest Thread
I hope Firtina wins but I have feeling Korean Banks are gonna jump in with favorable offers. (Romnia have been shopping quite a lot lately, I doubt they have the ready cash to pay for it)
www.savunmasanayist.com
seems like a very important tender since this is Phase I
Maybe Qatar or UAE can provide financing?
Romanian source mentions it being a phase 1.Phase I? Looks like it is the full tender for three Regiment.
Other than financing, as we've seen in Poland, Korea can also complete the contract in a much shorter timeframe. Doubt we can be competitive in that unless MSB allows Romanian order to take precedence.
Yup. Unless I'm mixing it with K2, first batch of K9s delivered were also from Korean Army orders. They can be flexible like this because unlike us they don't have embargos and no delays. Even without all that, doubt we will ever match that speed of delivery.Yes, Hanwa's industrial capacity is unmatched. They supplied the first 24 hwotizers withing 3 month of signing contract or something like that.
Yup. Unless I'm mixing it with K2, first batch of K9s delivered were also from Korean Army orders. They can be flexible like this because unlike us they don't have embargos and no delays. Even without all that, doubt we will ever match that speed of delivery.
Phase I? Looks like it is the full tender for three Regiment.
Found it, first batch of K9 were brand new. They Singed the contract in August and were delivered in December.
To match the delivery time, the first 48 howitzers–12 upgraded vehicles and 36 to be refurbished to K9PL(A1)s–will be transferred from the Republic of Korea Army inventory.
Very impressive speed.Under the contract, Hanwha is responsible for delivery of all 212 vehicles by 30 September 2026.
![]()
K9 Thunder - Wikipedia
en.wikipedia.org
I read the tweet as the 54 howitzers being phase I.
If it was, we would have more Firtina II delivered by now . so it's safe to say not yet . i guess 2026 is gonna be the most important year for land forces. engines should be available at that time.Had the T-155 engine problem overcame?
İf so ,any f-155 is impossible,just like Altay.If it was, we would have more Firtina II delivered by now . so it's safe to say not yet . i guess 2026 is gonna be the most important year for land forces. engines should be available at that time.
I believe the few Firtina II delivered to army used spare engines, don't know how much spare engines we have but let's assume we have some 30 engines (i speculate here), don't expect more Firtina II deliveries till late 2026. i believe there was 8-or 10 delivered. so i expect 6 per year till 2026. but if what we read here and there is true, BMC seems likely to pull this off. i'm praying for thatİf so ,any f-155 is impossible,just like Altay.
We use so much still unfinished project to foreign bid just like Hurjet and firtina.İ think our company knew that can't win but to promote.
That‘s correct. 12 factory new K9 and 36 refurbished vehicles from ROK army inventory. Annual production capacity in Korea estimated ~200 K9.Very impressive speed.
TSK and MSB did forego its delivery time in the past for some customers. I think Boran and Omtas for Kosovo was one. New 155mm howitzers tho, we need them.
I think the Fırtına engines can be ready earlier, there is no official date I know of for the engine, but it has been at advanced stages already. So there must be a point why BMC is in the tender. Besides that, perhaps a hybrid solution can be offered too.İf so ,any f-155 is impossible,just like Altay.
We use so much still unfinished project to foreign bid just like Hurjet and firtina.İ think our company knew that can't win but to promote.
Photo used by the Romanian source is that of Fırtına II(see the RCWS) and doubt BMC would offer Fırtına I.That‘s correct. 12 factory new K9 and 36 refurbished vehicles from ROK army inventory. Annual production capacity in Korea estimated ~200 K9.
Is Firtina I or II in the tender? If it is first T-155 model than the assembly kits have to be obtained from Hanwha (350 total in license contract, 280 produced in Türkiye, next 70 to be built with assembly kits from Korea). German embargo: STX isn’t allowed to deliver licensed MTU engines to Türkiye.
Afaik Firtina II is almost free of license agreement with Korean companies.
Twitter post of military hobby bloggersPhoto used by the Romanian source is that of Fırtına II(see the RCWS) and doubt BMC would offer Fırtına I.
Tbh and in the odd chance Fırtına wins this tender, I doubt we'll see it with the local engine.