Latest Thread
Is it just me or does this look ugly? Don't even start with RCS...PT PAL new KCR-60 Fast Attack Missile Craft.
View attachment 49935
View attachment 49936
View attachment 49937
This is the answer i got from my questions to one of PT PAL official:Did you asked about the radar?
Did you asked about the radar?
Idk what to say ? I mean what the hell is our obsession with Brahmos, are they going to cook up some Frankenstein hereThis is the answer i got from my questions to one of PT PAL official:
- This is not the final design. The length would be 140 meter.
- All VLS module at the bow will be moved to the center of the super structure just like the original Iver Huitfeldt
- CMS will be from Havelsan
- AShM will be Brahmos
- SAM will be Aster (but still need the greenlight from MBDA)
- Radars still to be determine
Idk what to say ? I mean what the hell is our obsession with Brahmos, are they going to cook up some Frankenstein here
Goodluck,Franco Aster with Turkish made CMS. Why not navalized hisar?This is the answer i got from my questions to one of PT PAL official:
- This is not the final design. The length would be 140 meter.
- All VLS module at the bow will be moved to the center of the super structure just like the original Iver Huitfeldt
- CMS will be from Havelsan
- AShM will be Brahmos
- SAM will be Aster (but still need the greenlight from MBDA)
- Radars still to be determine
I think its acceptable, I like the idea to implement 360° bridge.Is it just me or does this look ugly? Don't even start with RCS...
I am still hoping for NSM.Idk what to say ? I mean what the hell is our obsession with Brahmos, are they going to cook up some Frankenstein here
Mini Damen EnforcerPT PAL 143 meter LPD. Got confirmation that this the LPD design for UAE.
View attachment 49939
View attachment 49940
for the radars, maybe they eyeing for Cafrad?This is the answer i got from my questions to one of PT PAL official:
- This is not the final design. The length would be 140 meter.
- All VLS module at the bow will be moved to the center of the super structure just like the original Iver Huitfeldt
- CMS will be from Havelsan
- AShM will be Brahmos
- SAM will be Aster (but still need the greenlight from MBDA)
- Radars still to be determine
Did they realized Thales stuff are too expensive but still trying tonput franco stuff in there?This is the answer i got from my questions to one of PT PAL official:
- This is not the final design. The length would be 140 meter.
- All VLS module at the bow will be moved to the center of the super structure just like the original Iver Huitfeldt
- CMS will be from Havelsan
- AShM will be Brahmos
- SAM will be Aster (but still need the greenlight from MBDA)
- Radars still to be determine
they still testing NSM for VLS right? or not?I think its acceptable, I like the idea to implement 360° bridge.
I am still hoping for NSM.
Anything can be integrated as long the manufacturer of that item is providing necessary tools, libraries, equipments etc. MICA NG will be integrated for Ukranian Ada class that runs on Advent, Albatros - NG (CAMM-ER) will be integrated on Pakistan's corvette project.Did they realized Thales stuff are too expensive but still trying tonput franco stuff in there?
At this point just take atmaca and Naval Hisar or something.
@Anmdt , does Havelsan able to integrate Aster and Brahmos into their CMS ?
They can't forget Yakhont.Idk what to say ? I mean what the hell is our obsession with Brahmos, are they going to cook up some Frankenstein here
This doesn't make sense in many ways, but anyway. At least design a proper FAC or OPV - Corvette before a heavy frigate, can't they?This is the answer i got from my questions to one of PT PAL official:
- This is not the final design. The length would be 140 meter.
- All VLS module at the bow will be moved to the center of the super structure just like the original Iver Huitfeldt
- CMS will be from Havelsan
- AShM will be Brahmos
- SAM will be Aster (but still need the greenlight from MBDA)
- Radars still to be determine