Ah bwk. I've forgotten how long it was since the last time I read that warning...
By the way, is that ILSV?
Ah bwk. I've forgotten how long it was since the last time I read that warning...
The difference is that while the current form of KF21 is on par with F/A-18E/F block 3, the latter is 1970's design much like F-15 and F-16. They still can be upgraded but their basic designs will remain 4th gen.I believe it just only a par with F/A 18 E/F block 3
I Wonder how much the axe cost.
I believe it just only a par with F/A 18 E/F block 3.
Its been a while since we heard if already resend their engineer to .
Until today we hear no news, and yet the plane had conduct it's maiden flight.
Think of cheaper F-18 E/F Super Hornet with a bit of reduced RCS. Nothing special.
Err, if such component in KF-21 is still sourced from US, the same restriction will still be there, no?US once got really pissed because they "suspected" that the Koreans tried to repair Tiger Eye IRSTs on F-15Ks by themselves. Remember, not found out but suspected. In the end they've found no evidence but put more restrictions regarding the maintenance of US made parts. No need to worry about those stuff concerning KF-21.
Err, if such component in KF-21 is still sourced from US, the same restriction will still be there, no?
The payment, stock share, knowledge transfer, 5 key techs, etc. etc.There is indeed a secured link between DI and KAI,
The payment, stock share, knowledge transfer, 5 key techs, etc. etc.
Is it done deal or any ? Since it's never surfaced again.
Eventhough SOE that work with KFX has many potential parnership & so on, I have big doubt DI capable to fully produce the fighter before 2030.
If any, the thing I consider so much is towards DI company structure, and DI consistency in this program (i know not everyone satisfied with KF 21 spec) if they would spread their wing wider.
Not an EZ task at all
It can.The KFX/IFX' s fighter's abilities are designed to be more advanced than the U.S.-built Lockheed Martin F-16 Fighting Falcon jet aircraft.
I believe so.The block 3 projected to be full fledged 5th gen fighter right?
Lha piye to boeing? F15EX is a go or no for Indonesia?happy TNI anniversary.
View attachment 32930Log into Facebook
Log into Facebook to start sharing and connecting with your friends, family, and people you know.web.facebook.com
Wat?and yet the plane had conduct it's maiden flight.
Really? I guess when my place got blackout it caused by the transmission lines or maintenance.we have surplus electricity production in Java
Renegotiation is in pending currently where Pandemic is stated as a reason. No revelation will likely to happen until renegotiation is finally completed inshaAllah.
Financially, Indonesia Today has been in much better situation compared to the period of 2018-2020. The fear of currency crush that can sake financial stability look like become the reason in this economic focused administration to renegotiate and stop the funding since 2018. Any way, 2018 is also just 1 and half year before Presidential Election, Jokowi doesnt want to see Rupiah huge depreciation and exceeding 15.000 per USD in 2019, this can damage his image during the campaign and election time. This is my analysist over the reason of that renegotiation.
Despite only suffer around 8 billion USD trade deficit in 2018, Rupiah has crossed 15.000 per USD at one month. As we know Indonesian economic team has traumatic memory on Asian Financial Crisis moment.
Current situation is in reverse despite we are still struggling with Covid 19 pandemic. We have trade surplus since 2020 and this year the surplus is getting bigger YoY, the situation look like coming back into SBY period where commodities price are high and will likely create another economic boom for Indonesia.
As I stated in my previous post, energy crisis in Europe and China and the opposite situation in Indonesia where we have surplus electricity production in Java with coal price set at maximum 70 USD per ton (compared with 200 USD per ton in international market) shows huge opportunity for Indonesia economy to have strong growth for the next 1-3 years and beyond. Even WB has stated the potency for Indonesia economy to reach growth until 8-9 percent is exist for Indonesia beyond 2023 if government sets correct policy.
The bird, isn't flying yet my deares @NEKO , puss pussWat?
Really? I guess when my place got blackout it caused by the transmission lines or maintenance.
The bird, isn't flying yet my deares @NEKO , puss puss
sure, we have plenty dumb bomb from PT. DANAWe should also have a plan to make aircraft ordnance to be used on KFX, do it alone or with SK.
Pussycat must prevail against those twocanteen guard and students
Student already "dead"sure, we have plenty dumb bomb from PT. DANA
oh, and again. I condemnd that pict.
I DEMAND A NEKO PICT INSTEAD !!
Or perhaps you should make an Instagram account to counter canteen guard and students
Dumb bomb, and maybe smart bomb for now.sure, we have plenty dumb bomb from PT. DANA
Pussycat must prevail against those two
I request other Indonesian member here to be selective about reposting content from those kind of "information provider", like the last time during Nanggala incident there are irresponsible people claiming that Nanggala is fine and communication have been established but can't resurface for a while because of some technical problem, or something like that.Student already "dead"
JV between GE and NTP? you mean PT. GENTS? as i remember correctly, since first time I joined as gas turbine overhaul engineer apprentice in 1999 at NTP, GENTS only did GE industrial gas turbines, not for aero engines.The avionics have been made by Korean. Engine will be F 414 from GE, but GE and DI have long and deep relationship to one another. CN 235 engine is made by GE and DI through PT Nusantara Turbin can do maintenance on the engine. DI and GE also has made a JV company.
From what is stated in media, it is very clear that Indonesia will have much freedom in the system integration with capability to do upgrade by ourselves and this is also why we get 1 prototype to be own by PTDI. The testing is also conducted by DI for that prototype so it shows DI has access to the avionics system of the plane.
I believe it's still within our immediate reach if we start by licensing Cirit or similar add on guidance kits for our FFAR.Dumb bomb, and maybe smart bomb for now.
Btw am I asking too much if we develop AGM?