more like Duterte thinkingYour statement remind me about our previous MoD : "... mau perang sama siapa?"
"Who do you want to go war ?"
Latest Thread
more like Duterte thinkingYour statement remind me about our previous MoD : "... mau perang sama siapa?"
"Who do you want to go war ?"
Speaking of stop gap solution, have US ever transferred their naval assets to other countries through EDA program? Reckon we could use some
With a good strategy we still can put up a good fight, Even Kriegsmarine still able to terrorise the allies on the high seas even though only using their U-boat.Indonesian Navy need not compete ship per ship basis with China. We can't anyway.
A fleet 1/4th or even 1/6th of China's SS fleet is enough.
And I agree with stop gap solution. Any stop gap solution is still better than most Indonesian navy vessel afloat these days.
just remember, the task to sink the whole PLAN is not ours.With a good strategy we still can put up a good fight, Even Kriegsmarine still able to terrorise the allies on the high seas even though only using their U-boat.
And with today's technology a single submarine (in a berserk mode) able to face of against a carrier battle group. IMHO
Maybe, but it is better to have that capability.just remember, the task to sink the whole PLAN is not ours.
we're merely spoilers here.
Not surprising tho. Both of opv and opv90 from DRU?
another jokes, no wonder
Well if you surf his tweet tou will find if at the first place He against AH 140 to installed with Sylver VLS.another jokes, no wonder
Will it be named as KRI Suryo if we got that sub wkwkjust realize that soryu is far bigger than U214
I am not waiting someone tweet, but effective contract itselfWell if you surf his tweet tou will find if at the first place He against AH 140 to installed with Sylver VLS.
Later statement He push so hard with AH140 and against Italian FREMM
What a nice show to watch in this dry season of purchasing Alutsista
This days acquisition usually comes with a surprise.Hi, can anyone tell me about the status of Indonesia's submarine acquisition program?
A while ago I heard that Indonesia was looking to acquire 4 Scorpene-class boats (alongside Rafale aircraft), what is the status of this deal?
Why the second batch of these boats will be build / assembled in SK?I also think it's unwise to left the Changbogo program considering we're on our way to build the 4th, 5th and 6th hull gradually on our own.
The 4th-6th hull are planned to be assembled here, each with varying degree of local assembly.Why the second batch of these boats will be build / assembled in SK?
Why I always thinking that the second batch will be build in SK, just what and where did I read about that.The 4th-6th hull are planned to be assembled here, each with varying degree of local assembly.
This days acquisition usually comes with a surprise.
Look at the FREMM and Arrowhead acquisition,while it's anticipated, no one had any idea it will be purchased right until Janes or Babcock announced it.
Same with Rafale and the submarine acquisition, we might only know what's what when the announcement came.
Personally I'm betting on the Scorpene instead of the 214's, but who knows.
I also think it's unwise to left the Changbogo program considering we're on our way to build the 4th, 5th and 6th hull gradually on our own.
Yes, we have been their largest arms consumer yet, like makassar LPD, t50, and these changbogosCancelling the contract will also jeopardize our defense relationship with SK.
are they, changbogo and u209 (mod1400) completely different sub? by any chance we decided to buy tkms u family sub. Will we losing the learning curves that we got from the batch i nagapasa?If we decide not to continue with the C'Bogos, we'll have to start the learning curves back to square one for a new type of submarine.
Arrowhead, or iver came from MEF 2 as the 3rd and 4th PKR. And hopefully FREMM could get the deal done in MEF 3.FREMM contract is still not effective as Arrowhead is related to Iver contract that has been signed years before
Btw Indos, will PAL do the batch ii sequential or in parallel?that first submarine ( 1 section built in PT PAL), second submarine (2 section built in PT PAL), and third submarine will be wholly built in PT PAL facility.