Indonesia Indonesian Strategic Industries

Lordimperator

Experienced member
Moderator
Indonesia Correspondent
Indonesia Moderator
Messages
5,046
Reactions
3 2,886
Nation of residence
Indonesia
Nation of origin
Indonesia
Is this previous batch FNSS just send or new batch?
I assume its the 18 units from the 1st batch, which 8 units readied from FNSS, and 10 being assembled (hull made by FNSS) in Pindad
 

chiphocks

Committed member
Messages
218
Reactions
70
Nation of residence
Indonesia
Nation of origin
Indonesia
Have you seen video or photo of their facilities? It's on workshop aka bengkel level. Not really on the level of proper modern facilities like Honda, Toyota and other automotive companies have. They need to upgrade the whole facilities, more or less. The same with their ammunition factory.
No, never, well maybe just is a facebook or something
but something that make me actually see what they capable of, no

but based on your previous comment, at least they still making progresses right???
maybe just not big enough
 

Var Dracon

Contributor
Messages
465
Reactions
2 502
Nation of residence
Indonesia
what kind of facility that Pindad doesn't have yet to make it happen??
FNSS Facility
fe9d222ac79a50c420e925bec47b3790.jpg



Pindad facility
3d750211-8733-4d3a-b2b2-01955f2f53d8.jpg

6c2bed3a-1555-4153-abc9-f8d05e01cbcc-1.jpg


I don't get why we renamed Pandur 2 as Pindad Cobra. No major difference can be seen (at least outside). We don't seem to manufacture any parts for it (only assembling).
 

chiphocks

Committed member
Messages
218
Reactions
70
Nation of residence
Indonesia
Nation of origin
Indonesia

Var Dracon

Contributor
Messages
465
Reactions
2 502
Nation of residence
Indonesia
still dont get it, from your post i only see that FNSS is more "exclusive"
i dont see the difference in term of capability and other

Tools and hardware which FNSS has but Pindad doesnt have.
And keep in mind this is only scratching the tangible capability. Pindad certainly does not have manpower / SDM that would qualify to operate that facility, tools, hardware, and machinery. To train the SDM it will need more time.
 

Madokafc

Experienced member
Think Tank Analyst
DefenceHub Diplomat
Messages
5,915
Reactions
4 10,056
Nation of residence
Indonesia
Nation of origin
Indonesia

Madokafc

Experienced member
Think Tank Analyst
DefenceHub Diplomat
Messages
5,915
Reactions
4 10,056
Nation of residence
Indonesia
Nation of origin
Indonesia
Contract for joint production Indonesian MALE UCAV mission system

PENANDATANGANAN KONTRAK JOINT PRODUCTION PTTA MISSION SYSTEM KLAS MALE TA. 2022​

Rabu, 1 Juni 2022

IMG-20220601-WA0001-1024x735.jpg
Jakarta, 31/05 Pesawat Terbang Tanpa Awak (PTTA) jenis Medium Altitude Long Endurance (MALE) yang mampu terbang terus menerus 24 jam merupakan wahana yang diperlukan untuk menjaga kedaulatan NKRI dari udara. Pada tahun 2017 telah terbentuk perjanjian bersama berupa Konsorsium Pesawat Terbang Tanpa Awak (PTTA) Klas MALE dengan anggota yang terdiri dari Kementerian Pertahanan RI yaitu Ditjen Pothan Kemhan dan Balitbang Kemhan, Badan Pengkajian dan Penerapan Teknologi (BPPT), TNI AU (Dislitbangau), Institut Teknologi Bandung/ITB (FTMD), LAPAN, BUMN yaitu PT Dirgantara Indonesia dan PT Len Industri.

Pada hari Selasa (31/5/2022), Ditjen Pothan Kemhan yang diwakili Sesditjen Pothan Kemhan Laksma TNI Sri Yanto, S.T., dan PT. Len Industri (Persero) yang diwakili oleh Direktur Bisnis dan Kerjasama PT. Len Industri (Persero) Wahyu Sofiadi menandatangani Kontrak Program Joint Production PTTA Mission System Klas MALE TA. 2022. Program ini merupakan tahun ke-4 penguasaan teknologi Mission System PTTA Klas MALE sebagai bagian dari pengembangan PTTA MALE Elang Hitam dengan Scope of Work EH1-B Data Alignment, GCS Upgrade Design System dan On Board Test Bench for Proof of Concept (PTTA).

Dalam sambutannya Sesditjen Pothan Kemhan menyampaikan kepada PT. Len Industri (Persero) yang mendapatkan penugasan melalui program ini agar melaksanakan tugas tersebut sesuai dengan kesepakatan dalam Kontrak. Diharapkan dengan penguasaan teknologi Mission System PTTA MALE tersebut dapat mewujudkan kemandirian Industri Pertahanan dalam memproduksi PTTA MALE guna mengisi kebutuhan TNI AU dalam menjaga kedaulatan NKRI melalui udara. (Red Bagdatin-Dittekindhan)

 

FPXAllen

Contributor
Indonesia Correspondent
Messages
1,126
Reactions
4 1,702
Nation of residence
Indonesia
Nation of origin
Indonesia
Contract for joint production Indonesian MALE UCAV mission system

PENANDATANGANAN KONTRAK JOINT PRODUCTION PTTA MISSION SYSTEM KLAS MALE TA. 2022​

Rabu, 1 Juni 2022

IMG-20220601-WA0001-1024x735.jpg
Jakarta, 31/05 Pesawat Terbang Tanpa Awak (PTTA) jenis Medium Altitude Long Endurance (MALE) yang mampu terbang terus menerus 24 jam merupakan wahana yang diperlukan untuk menjaga kedaulatan NKRI dari udara. Pada tahun 2017 telah terbentuk perjanjian bersama berupa Konsorsium Pesawat Terbang Tanpa Awak (PTTA) Klas MALE dengan anggota yang terdiri dari Kementerian Pertahanan RI yaitu Ditjen Pothan Kemhan dan Balitbang Kemhan, Badan Pengkajian dan Penerapan Teknologi (BPPT), TNI AU (Dislitbangau), Institut Teknologi Bandung/ITB (FTMD), LAPAN, BUMN yaitu PT Dirgantara Indonesia dan PT Len Industri.

Pada hari Selasa (31/5/2022), Ditjen Pothan Kemhan yang diwakili Sesditjen Pothan Kemhan Laksma TNI Sri Yanto, S.T., dan PT. Len Industri (Persero) yang diwakili oleh Direktur Bisnis dan Kerjasama PT. Len Industri (Persero) Wahyu Sofiadi menandatangani Kontrak Program Joint Production PTTA Mission System Klas MALE TA. 2022. Program ini merupakan tahun ke-4 penguasaan teknologi Mission System PTTA Klas MALE sebagai bagian dari pengembangan PTTA MALE Elang Hitam dengan Scope of Work EH1-B Data Alignment, GCS Upgrade Design System dan On Board Test Bench for Proof of Concept (PTTA).

Dalam sambutannya Sesditjen Pothan Kemhan menyampaikan kepada PT. Len Industri (Persero) yang mendapatkan penugasan melalui program ini agar melaksanakan tugas tersebut sesuai dengan kesepakatan dalam Kontrak. Diharapkan dengan penguasaan teknologi Mission System PTTA MALE tersebut dapat mewujudkan kemandirian Industri Pertahanan dalam memproduksi PTTA MALE guna mengisi kebutuhan TNI AU dalam menjaga kedaulatan NKRI melalui udara. (Red Bagdatin-Dittekindhan)


No words yet regarding its first flight? *Sigh*
 

Madokafc

Experienced member
Think Tank Analyst
DefenceHub Diplomat
Messages
5,915
Reactions
4 10,056
Nation of residence
Indonesia
Nation of origin
Indonesia
Certification agency of Ministry of Defense taking inspection check toward Merpati maintenance facilities

KAPUSLAIK KEMHAN MENGADAKAN PEMERIKSAAN KELAIKAN PUSAT PERAWATAN PESAWAT PT. MERPATI MAINTENANCE FACILITY​

Tuesday, 7 June 2022


2-1024x466.jpeg



Jakarta(07/6), Pada hari Senin Tanggal 06 Juni 2022 bertempat di Jalan Raya Bandara Juanda Surabaya, Marsekal Pertama TNI Mohammad Yani Rudiansyah, S.T., S.I.P. selaku Kapuslaik Kemhan melaksanakan Kunjungan dan pemeriksaan kelaikan pusat perawatan pesawat PT. Merpati Maintenance Facility (MMF) dan diterima oleh Bapak Rowin H. Mangkoesoebroto, M. SAE selaku Direktur Utama PT. MMF.


1-1024x466.jpeg



Kunjungan tersebut dalam rangka penambahan Kapabilitas pesawat C-295 sebelum pelaksanaan verifikasi yang akan ditandatangani oleh Kapuslaik bila proses pemeriksaan telah selesai dan dinyatakan lengkap oleh Tim IDAA.


5-1024x466.jpeg



Dalam kunjungan kali ini Kapuslaik Kemhan didampingi oleh Kabid Laik Udara Kolonel Tek Andi Solihin selaku Ketua IDAA (Indonesian Defence Airworthiness Authority) dan beberapa Inspektur Kelaikan dari Puslaik Kemhan. Kegiatan berjalan lancar dengan selalu memperhatikan Protokol Kesehatan dan Pencegahan Covid-19.


8-1024x576.jpeg
 

Madokafc

Experienced member
Think Tank Analyst
DefenceHub Diplomat
Messages
5,915
Reactions
4 10,056
Nation of residence
Indonesia
Nation of origin
Indonesia

DAHANA – PKT Ammonium Nitrate Plant to Be Completed this Year​







News Image




Bontang, May 24, 2022. The Ammonium Nitrate Plant owned by DAHANA – Pupuk Kaltim is currently in the construction stage. The plant, which has a production capacity of up to 75,000 tons of ammonium nitrate per year, is managed by PT Kaltim Ammonium Nitrate (KAN), a joint venture between PT DAHANA (Persero) and PT Pupuk Kalimantan Timur. The factory, located in Bontang, is targeted to be completed and will start production at the end of 2022.
This was informed during a working visit by the Board of Directors and Commissioners of PT DAHANA to the Bontang Ammonium Nitrate Plant. The group was led directly by President Director Wildan Widarman accompanied by Director of Technology & Development Suhendra Yusuf RPN along with members of the Board of Commissioners Wahyudi Hidayat, Rina Moreta and Rizky Olivia Nasution.
"We are optimistic that the Ammonium Nitrate Plant will be completed by the end of 2022," said Mr Widarman, President Director of PT DAHANA.
The presence of the Ammonium Nitrate Factory located in the PT KIE Bontang Industrial Estate, East Kalimantan will bring an impact on reducing imports of explosive raw materials and a cut on the country's foreign exchange allocated for import activities. Apart from that, the independent construction of the Ammonium Nitrate plant can develop and strengthen further efforts for the independent procurement of the Indonesian Main Weapon System Equipment (Alutsista).

Mr Widarman also stated that PT DAHANA and PT Pupuk Kaltim, with involvement of involving internationally reputable consultants had conducted comparative studies and made researches on various aspects such as technology selection, availability of raw materials, laws and regulations, and the market before prior to construction of the said plant.
"Based on the results of our study, this ammonium nitrate plant can save foreign exchange from AN imports, create added value for domestic products, and of course create jobs for the Indonesian people, especially the Bontang people," said Mr Widarman.
Meanwhile, DAHANA Commissioner Wahyudi Hidayat hoped that all parties would support this strategic defense industry project.
"We must support this project together to make sure it can be completed according to the set target. This is important for the national interest, both for the fulfillment of ammonium nitrate for commercial purposes and for defense purposes," explained Mr Hidayat.
Based on the results of the auction, the entire process of construction of the AN plant was carried out by a consortium of PT Wijaya Karya (Persero) - SEDIN Engineering on an area of ± 6 (six) hectares. The total investment for the construction of the AN plant amounted to ±1.1 trillion rupiahs, which was obtained from investment loans of state-owned banks and equity from each shareholder.

After going through various dynamics since the signing of the Memorandum of Understanding and the signing of the Master Agreement witnessed by the President of the Republic of Indonesia Joko Widodo in November 2015, the collaboration between PT DAHANA and PT Pupuk Kalimantan Timur has progressed further as marked by the signing of a Joint Venture Agreement (JVA) in 2019. After some interruption due to the Covid-19 outbreak, this project is running again with the Pile Load Test stage in September 2020 and is currently advancing to the construction stage.

http://www.dahana.id/news/dahana-pkt-ammonium-nitrate-plant-to-be-completed-this-year/
 

Madokafc

Experienced member
Think Tank Analyst
DefenceHub Diplomat
Messages
5,915
Reactions
4 10,056
Nation of residence
Indonesia
Nation of origin
Indonesia

Follow us on social media

Top Bottom