TR Industry, Science and Technology

Balamir

Well-known member
Messages
351
Reactions
1,370
Nation of residence
Turkey
Nation of origin
Turkey
Turkish Maglev Train Project
Yüksek hızlı manyetik kargo ve yolcu taşıma projesi.jpg

yüksek hızlı manyetik kargo ve yolcu taşıma projesi 3.jpg

yüksek hızlı manyetik kargo ve yolcu taşıma projesi 2.jpg
 

Zafer

Experienced member
Messages
4,683
Reactions
7 7,389
Nation of residence
Turkey
Nation of origin
Turkey
If this project is finalized and finished, the next step would be Hyperloop
I see a tube in the picture. Hyperloop patent is already expiring. Perhaps it is already a similar one.
I always imagined tubes between the two far sides of Istanbul, many two point connections.
 

Balamir

Well-known member
Messages
351
Reactions
1,370
Nation of residence
Turkey
Nation of origin
Turkey
But before Turkey 2023 National High Speed Rail project aims to start producing finished the design of the prototype. This train will speed 225 km/h.

Currently in Turkey CAF Cepia Renfe Class 120 (250 kh/h max. speed) and Siemens Velaro TR (300 km/h max. speed) trains are used.

In addition, national metro, tramway, suburban train, electric locomotive, electric train projects continue. These are made by the state company TÜRASAŞ.

In addition, private companies such as Durmaray and Bozankaya have tramway, trambus, light metro, heavy metro projects.
 

Blood raven

Active member
Messages
108
Reactions
294
Nation of residence
Germany
Nation of origin
Turkey
I see a tube in the picture. Hyperloop patent is already expiring. Perhaps it is already a similar one.
I always imagined tubes between the two far sides of Istanbul, many two point connections.
Hmm I dont think there is a patent for it. Elon Musk basiaclly brainstromed it. Moreover there are many companies in Europe, India and China who are working on it right know creating even norms and standards for it.

Since it friction is basiaclly down to 0. Those trains can drive speeds up to that of an rocket engine taking off.

Downside to it would be that, since it is an vacuum tube, that one leak could destroy an entire system. Therefore the best usage of it would be to use Hyperloops as sort of cargotrain.

Joe scott made a good video about, check it out if you have time.

 

Zafer

Experienced member
Messages
4,683
Reactions
7 7,389
Nation of residence
Turkey
Nation of origin
Turkey
Hmm I dont think there is a patent for it. Elon Musk basiaclly brainstromed it. Moreover there are many companies in Europe, India and China who are working on it right know creating even norms and standards for it.

Since it friction is basiaclly down to 0. Those trains can drive speeds up to that of an rocket engine taking off.

Downside to it would be that, since it is an vacuum tube, that one leak could destroy an entire system. Therefore the best usage of it would be to use Hyperloops as sort of cargotrain.

Joe scott made a good video about, check it out if you have time.

There is a patent and Elon Musk opened it up to competition possibly ruining the lives of many me-toos as it is a high risk endeavor.
 

Huelague

Experienced member
Messages
3,931
Reactions
5 4,136
Nation of residence
Germany
Nation of origin
Turkey

Bogeyman 

Experienced member
Professional
Messages
9,192
Reactions
67 31,255
Website
twitter.com
Nation of residence
Turkey
Nation of origin
Turkey
In Afyonkarahisar, Artuk AVIATION was producing 30 micron-thick titanium parts with additive manufacturing from a 3D printer. They made 4 years of R&D for this job.
The company became a member of SAHA Istanbul
 

Balamir

Well-known member
Messages
351
Reactions
1,370
Nation of residence
Turkey
Nation of origin
Turkey
Tübitak Sage also localizes the connectors. It occurred to me a long time ago. The project I expected from Aselsan came from Tübitak Sage.
EspSj8JXAAAb2iX.jpg
 

Test7

Experienced member
Staff member
Administrator
Messages
4,785
Reactions
19 19,937
Nation of residence
United States of America
Nation of origin
Turkey
It is stated that other companies will start production soon

 

Test7

Experienced member
Staff member
Administrator
Messages
4,785
Reactions
19 19,937
Nation of residence
United States of America
Nation of origin
Turkey

The acceptance of Durmazlar's has started, settlement with the FCC​


20210115080026581a1fd9a4c942859e8a03793d1c215f.JPG_678-443.jpg


Despite the official selection of the most advantageous offer for the second time in the tender for the extension of the tram network, Olsztyn cannot yet sign a contract with the contractor. Two bidders appealed against this decision to the National Appeals Chamber. Meanwhile, the acceptance of the first two Durmazlar Panorama trams has officially begun, and in the meantime, Olsztyn has reached an agreement with the would-be contractor of the first stage of construction of the tram network - the Spanish company FCC Construcción.

durmazlar-panorama-3016-jazdy-testowe-kortowo-um-olsztyn.jpg

Durmazlar Panorama Olsztyn DRP5H05 # 3016 during test drives at the end of the border crossing University-Prawocheński (December 2020) © Olsztyn City Hall

After the KIO ruled out the Krakow-based company ZUE and upheld this decision by the court, the city could finally officially announce that, after re-evaluating the bids, it decided on a consortium of Polimex Infrastruktura, Polimex Mostostal and Trakcja. It declared that it would execute the order for PLN 403,164,353.11. In the repeated tender, five bids were finally assessed (two - Torpol and the aforementioned ZUE were excluded). The others were already for higher amounts: the consortium of Mirbudu and Kobylarnia requested PLN 437 870 454.89, Budimex Budownictwo - PLN 444 446 175.56, the consortium of Roverpol and the Spanish company Rover Infraestructuras - PLN 467 276 985.61, and the consortium of Gülermak and its the Turkish parent company GülermakAğır Sanayi İnşaat ve Taahhüt - PLN 467 350 286.79. This time Mirbud and Kobylarnia decided to protest, and Budimex Budownictwo joined them. The main objection is the winners' failure to meet the conditions for participation in the procedure. The losers claim, among other things, that Olsztyn should have taken advantage of the possibilities offered by the public procurement law and excluded the Polimex-Trakcja consortium due to previous problems of its companies with the implementation of the investment. If a given company was terminated for this reason, it gives the possibility (but not an obligation) to exclude it from the tender procedure. Olsztyn did not use this right and the National Appeal Chamber at the session at the end of December 2020 or at the beginning of January 2021 will assess whether it acted correctly.

2021011510095720210115080104.jpg_678-443.jpg


December 18, 2020 passed - after the changes caused by the pandemic - the deadline for the delivery of the first two cars by the Turkish Durmazlar to Olsztyn. Panoramas # 3015 and # 3016 have been in the MPK depot for some time - the first one arrived before the outbreak of the coronavirus pandemic, on the night of February 12-13, 2020 , to undergo approval tests on Olsztyn tracks, the second one arrived on the night of November 26-27 2020 . The manufacturer announced the readiness of both vehicles to be picked up on the aforementioned December 18, and on that day a committee met in the town hall to officially start this process. The process of taking over the trams to the city will take several weeks, during which the compliance of the vehicle characteristics with the tender specifications will be checked during tests. It's all about those elements thatwere scored in the tender , i.e. reduced axle load, swivel bogies in the extreme sections, width of the tram body, number of seats and width of the passage between them, noise level and appropriate hydraulic or pneumatic devices. Turkish cars can already be seen on the streets - test and training drives are underway, of course without passengers.

Construction of a tram line at Płoskiego Street (October 29, 2012)

Construction of a tram line at Płoskiego Street (October 29, 2012) © OlsztyńskieTramwaje.pl

On December 8, 2020, the court approved the agreement concluded four days earlier by Olsztyn with the Barcelona-based construction concern FCC Construcción, which was thrown out in August 2013 by the city from the construction of the first stage of the tram network for lack of progress. For over two years from signing the contract ( June 27, 2011 ) and nearly a year from the commencement of construction works ( September 12, 2012) The Spaniards made only 6.14 percent. works, and all this after 3/4 of the period allocated to the contract. FCC decided to claim compensation and demanded ... 321,974,063.16 PLN! Even more fun was the fact that the company from Catalonia stated in its lawsuit that if the court did not recognize its claims, it still wants money from Olsztyn - "only" PLN 47 711 469.13.

After inventorying the works performed by FCC and settling tenders for new contractors, Olsztyn calculated its costs and filed a counter-suit demanding PLN 37.7 million. The trial dragged on for many years, mainly due to problems with finding experts and obtaining their opinions, the Spaniards also tried to win the transfer of the hearings to another city, but eventually the District Court in Olsztyn dealt with the case. During the trial, Olsztyn managed to obtain the court's approval to take over a PLN 25 million bank guarantee submitted by the FCC. The dispute did not end in sight and the Spaniards offered a settlement. The court referred the case to mediation and an agreement was finally reached. Under this agreement, FCC Construcción admitted that Olsztyn had the right to terminate the contract, and the actions of the city and its employees were appropriate. The city also kept the PLN 25 million guarantee, and the Spaniards agreed to pay out an additional PLN 2.5 million by December 13, 2020.

z25772811V,Tramwaj-Panorama-na-ul--Towarowej-w-Olsztynie.jpg

 

neosinan

Committed member
Messages
234
Reactions
7 1,066
Nation of residence
Turkey
Nation of origin
Turkey

neosinan

Committed member
Messages
234
Reactions
7 1,066
Nation of residence
Turkey
Nation of origin
Turkey
Turkish Space Agency's targets:

Turkish is gonna send Astronaut to ISS Before the end of 2023
Turkey is going Moon before 2023
Turkey/TUA is gonna Soft land to Moon before 2028 with Local Rocket
Turkish Space port is gonna build in friendly country (Somalia)
Multiple Radio Telescope is be build in Turkey.
 
Last edited:

Yasar_TR

Experienced member
Staff member
Administrator
Messages
3,248
Reactions
141 16,272
Nation of residence
United Kingdom
Nation of origin
Turkey
Turkish Space Agency's targets:

Turkish is gonna send Astronaut to ISS Before the end of 2023
Turkey is going Moon before 2023
Turkey/TUA is gonna Soft land to Moon before 2028 with Local Rocket
Turkish Space port is gonna build in friendly country (Somalia)
Multiple Radio Telescope is be build in Turkey.
Can you provide credible sources to support these claims please?
 

Follow us on social media

Latest posts

Top Bottom