BMC made a remote controlled 4x4
Latest Thread
What kind of news do you mean?any news about aselsan korhan?
I guess you could say...they mbombed outEven though the S.Africans came up with the MRAP concept - they don't make decent vehicles it seems
While I have great respect for Tümosan on their contribution to Turkey and Farmers etc. And love them for the engine they developed to the defence industry. I wonder why they decided to go into the business of producing ACV.Tümosan Representative at IDEF about Pusat.
Pusat isn't just 1 type of Vehicle but rather a Family of Vehicles.
- Pusat 4x4
- Pusat 6x6
- Pusat 8x8
Concepts 2018.
View attachment 35394
View attachment 35395
Pusat 6x6 at IDEF 17 as Logistics Model.
View attachment 35397
Pusat 4x4 is almost 100% National.
- TMSN 310HP ( x5.2)
- TMSN Transmission (8+1 Synchromesh Automatic)
- TMSN Independent Suspension
- TMSN Differential (TÜMOSAN DIF-102)
- TMSN Transfer Box (TÜMOSAN TKU-102)
- TMSN MEKÜ (Engine Electronic Control Unit)
- TMSN TEKÜ (Transmission Electronic Control Unit)
- TMSN Wheel Hub (TÜMOSAN TEG-102)
Pusat 4x4 completed 5000KM road testing from 20000KM total.
Ballistic as well as IED Tests will be completed by early 2022, followed by initiation of Serial Production phase.
Change of Appearance
Concept 2017 vs Prototype 2019
View attachment 35393 View attachment 35396
Could it be related to the post about domestic engines being used in the vehicles to be delivered in 2022?Something seems to be going quite wrong with Land Vehicle Programs in the hands of FNSS.
Don't get me wrong, I am by no means an Expert but the given Dates cannot be achieved it seems.
- FNSS ACV-15 Modernization
The Infos on the Program are Sparse but no real Delivery in sight. with Changing Prototypes.
View attachment 36434
This is not that big of a Modernization effort as well.
- FNSS Pars IV
View attachment 36435
PARS IV 6×6 Özel Operasyonlar Aracının testleri devam ediyor
Türk Silahlı Kuvvetleri'nde Pars 6x6 Taktik Tekerlekli Zırhlı Araç dönemi başlıyor 6x6 Pars Taktik Tekerlekli Zırhlı Araç ile ilgili olarakwww.defenceturk.net
The first deliveries of Pars IV 6×6 Mine Protected Vehicles, which will be the first in the TAF inventory, will be made in 2021.
The initial 12 Deliveries were scheduled for 2021 but no Info as December approaches.
- FNSS Pars IZCI 6x6 and 8x8
View attachment 36436
PARS 6×6 İZCİ Seri Üretime Geçiyor
Toplam 36 aylık proje takvimine sahip olan ÖMTTZA projesinde 1 yıl içerisinde 100 aracın teslim edilmesi planlanıyor.www.defenceturkey.comIn the ÖMTTZA project, which has a 36-month project schedule, it is planned to deliver 100 vehicles within 1 year.
March 17, 2021
That means they have to deliver 100 Pars IZCI in 4 Months but no Info on that one as well.
- FNSS ZAHA
CEO Kurt says "These 3 ZAHA will be delivered in the first half of 2021" Yet nothing on that as well.
- FNSS KAPLAN MT
View attachment 36437
"According to the 2019 contract, FNSS and PT Pindad must jointly produce a batch of 18 tanks.
The first Kaplan is ready, and all of the remaining ones are at various stages of construction. It is reported that the two manufacturers will complete the assembly of the first batch of equipment by the end of this year.
During IDEF-2021, plans for the near future were announced.
So, a second order for 52 tanks should appear soon. They should be built and handed over during 2022."
Here we have no Information as well on the Current Status of the Kaplan for set delivered untile the end of 2021 and they are supposed to built 52 in 2022.
4 per Month!
FNSS STA Project
View attachment 36438
Silah Taşıyıcı Araçlar Projesinde İlk Teslimat Gerçekleştirdi
Cumhurbaşkanlığı Savunma Sanayii Başkanlığı (SSB) ile FNSS Savunma Sistemleri A.Ş. arasında imzalanan sözleşme kapsamında yürütülen Silah Taşıyıcı Araçlar Projesi kapsamında ilk Silah Taşıyıcı Araç Türk Silahlı Kuvvetleri (TSK)’ne teslim edildi.www.defenceturkey.com
Even here the Serial Production started quite late for my thinking.
FNSS General Manager and CEO K. Nail KURT said, “Our Weapons Carrier Vehicles contract, signed between the Presidency of Defense Industry and our Company in June 2016, for the KAPLAN STA vehicles offered to the use of the security forces after the qualification tests were completed in accordance with the project schedule. It includes a total of 260 vehicles
The Serial Production Deliveries Started in 04/2020.
Almost 4 Years after Contract signing. Isn't this a simple 2x ATGM Carrier or am I missing something.
I have no Idea if I am overthinking or if there is a problem here.
This is not related to FNSS."According to the 2019 contract, FNSS and PT Pindad must jointly produce a batch of 18 tanks.
The first Kaplan is ready, and all of the remaining ones are at various stages of construction. It is reported that the two manufacturers will complete the assembly of the first batch of equipment by the end of this year.
During IDEF-2021, plans for the near future were announced.
So, a second order for 52 tanks should appear soon. They should be built and handed over during 2022."
This one is likely delayed because the requirements have changed on the go, or Army has requested a review of certain things. 2 prototypes were different from each other.- FNSS ACV-15 Modernization
The Infos on the Program are Sparse but no real Delivery in sight. with Changing Prototypes.
This one, i am not sure if they have signed the final contract but there is definitely a delay on the completion of the qualification tests. TCG Anadolu was delayed as well so probably Navy was cool.- FNSS ZAHA
CEO Kurt says "These 3 ZAHA will be delivered in the first half of 2021" Yet nothing on that as well.