USVs wouldn't fill the role of the actual escorts, the frigates, as they lack the proper SAM systems or the range to act as escorts. USVs would only be a (worthwhile) addition in close defence and she could act as a mothership for USVs.
 

Anmdt

Experienced member
Naval Specialist
Professional
Messages
5,502
Solutions
2
Reactions
118 24,888
Nation of residence
Turkey
Nation of origin
Turkey
@Anıl Mert Taşkın has delivered the news in the article, TTHB (TTAB) continues as expected. SSB now allocates the fund for the first hull of the project. It will commence soon and STM will unveil the design.

It is simply MPAC + some sensors etc. Or better to call MPAC 'export version' of TTAB. Powered by 2 gas turbines, 2 diesel engines in CODAG form. 2 Diesels drive two separate maneauverable water jets, 2 gas turbines drive a single booster water jet.

Sensors;
X-DAR (Multi purpose X band AESA)*
AKREP CWI radar
IRST - unconfirmed
EO director (Ahtapot or Kuzgun, depends)
Compact EA/ED by Aselsan**

*Depends on operator, may also have Cenk-S or MAR-D

**Depends on operator, may also have light ESM or none.

Weapons;
8 Atmaca or 4 Atmaca + 12 Cakir
SAM (will be present under certain configuration, not present with PDMS)
Turkish PDMS or Gokdeniz CIWS.
76 mm MKEK
 

Afif

Experienced member
Moderator
Bangladesh Correspondent
DefenceHub Diplomat
Bangladesh Moderator
Messages
4,751
Reactions
94 9,073
Nation of residence
Bangladesh
Nation of origin
Bangladesh

Mehmed Ali

Contributor
Messages
496
Reactions
1 905
Nation of residence
England(UK)
Nation of origin
Bosnia & Herzegovina
I don't know much about the maritime affairs, so I might be talking nonsense, but couldn't it be better if TN worked more on the various subtypes of the missiles boats rather then OPVs?
 

Yasar_TR

Experienced member
Staff member
Administrator
Messages
3,248
Reactions
141 16,280
Nation of residence
United Kingdom
Nation of origin
Turkey
NAZAR Laser Electronic Attack System (LETS) has been integrated onto the TCG GÖKOVA frigate


Got a question: Is it gonna blind the oncoming missile (passive) or gonna totally destroy it (active)?
It is an ingenious weapon. It uses very little laser power and with more range than most CIWS, it will blind and render useless multiple targets it's tracking system has identified, one after the other in quick successions.
It may look like a passive system. But by blinding and rendering the targeting system of an incoming missile useless, it is in fact destroying it.
 

boredaf

Contributor
Messages
1,408
Solutions
1
Reactions
16 3,910
Nation of residence
United Kingdom
Nation of origin
Turkey
It is an ingenious weapon. It uses very little laser power and with more range than most CIWS, it will blind and render useless multiple targets it's tracking system has identified, one after the other in quick successions.
Oh yeah, please keep talking dirty to me :sneaky:

On a serious note, is there a video of it in action (like a demonstration) or a detailed article about it somewhere?
 

Yasar_TR

Experienced member
Staff member
Administrator
Messages
3,248
Reactions
141 16,280
Nation of residence
United Kingdom
Nation of origin
Turkey
Oh yeah, please keep talking dirty to me :sneaky:

On a serious note, is there a video of it in action (like a demonstration) or a detailed article about it somewhere?
Here is a good article on it.

 

Heartbang

Experienced member
Messages
2,556
Reactions
8 3,972
Nation of residence
Turkey
Nation of origin
Turkey
It is an ingenious weapon. It uses very little laser power and with more range than most CIWS, it will blind and render useless multiple targets it's tracking system has identified, one after the other in quick successions.
It may look like a passive system. But by blinding and rendering the targeting system of an incoming missile useless, it is in fact destroying it.
I know this is naval programs thread but, hear me out:
This, miniaturized, on Altay. Against Javelins.
 

boredaf

Contributor
Messages
1,408
Solutions
1
Reactions
16 3,910
Nation of residence
United Kingdom
Nation of origin
Turkey
Here is a good article on it.


This part really hits the nail on the head:

"It's part of a layered defense; each layer has tremendous value. As the threat approaches, every layer must step in to neutralize that threat. Using this system, we will have created a brand-new layer at the top to protect that valuable platform."

Not replacement but an additional layer of protection for our Navy, I love it. Also the fact that they are working on putting a smaller version on USV is amazing. Thanks for the article mate.
 

Oublious

Experienced member
The Netherlands Correspondent
Messages
2,164
Reactions
8 4,677
Nation of residence
Nethelands
Nation of origin
Turkey

Comparison between Turkish and Greece Meko ships, you can use translating.
 

AzeriTank

Contributor
Messages
711
Reactions
3 1,795
Nation of residence
Azerbaijan
Nation of origin
Azerbaijan
I know this is naval programs thread but, hear me out:
This, miniaturized, on Altay. Against Javelins.
Defence Turkey: Is this 1.5-year period for the production or the delivery of the naval version of the NAZAR System?

Özgür CANKARA:
In fact, it's like the Naval version is also completed after the development of the Land version is completed. But we will install the system to a naval platform and integrate it with the onboard Combat Management System (CMS). Then we will conduct sea trials with the system. Therefore, we consider the NAZAR Naval only as a production and integration activity. ;)
 

Anmdt

Experienced member
Naval Specialist
Professional
Messages
5,502
Solutions
2
Reactions
118 24,888
Nation of residence
Turkey
Nation of origin
Turkey
Isn't 5 years a long time? :(Can't it be 2-3 years?:);):whistle:
Lol, 5 years? Make it 10.
This information is "leaked" by T-rex, and off-the point as much as possible, merely based on what he reads here and there and how he interprets it (mainly this forum though).

TF-2000 goes through " contract design " stage, not " contract " stage. Anyone making a comment after reading this forum, particularly this thread and re-publishing it on twitter or back here on this thread first should know difference of two.

TF-2000 may get the steel cutting even within this year merely for a ceremony or the next year, and it doesn't matter. Contract design stage is expected to be completed by June 2024 with a possible foreseen 6 months delay, to be followed by Detail-Production design stage which is necessary for the construction (Construction may simultaneously go on for the sections which the detail design phase is completed, however).

And 2029 is not the expected commissioning but partial acceptance date, may as well end up being commencing sea trials if delays occur in the project (which it will occur). Add +3 years for such a ship to reach initial operational condition. And add+3 years as Navy foresees as a margin of error or unexpected delays.

Writing this as a person who so far has given the accurate information on several naval projects, including what goes on TF-2000 in details while none other insiders or experts in social media were mentioning of these.

The only credible people on social media are the ones who doesn't give exact dates out of their arses.

They will come in June to say " Tests of TF-2000 is completed". Man, been telling it since December here on this forum and they will not even tell it is towing tank scaled model experiments for resistance, self-propulsion, and sea-keeping and maneuvering (at this point they will not even know about the tests being conducted in cavitation tunnel, but hey how come a ship is tested in a cavitation tunnel right? What is the purpose there, it is for cavitation). They even refrain from giving a reference to this forum.

No further comments.
 
Last edited:

Baryshx

Contributor
Messages
969
Reactions
8 2,070
Website
www.twitter.com
Nation of residence
Turkey
Nation of origin
Turkey
Lol, 5 years? Make it 10.
This information is "leaked" by T-rex, and off-the point as much as possible, merely based on what he reads here and there and how he interprets it (mainly this forum though).

TF-2000 goes through " contract design " stage, not " contract " stage. Anyone making a comment after reading this forum, particularly this thread and re-publishing it on twitter or back here on this thread first should know difference of two.

TF-2000 may get the steel cutting even within this year merely for a ceremony or the next year, and it doesn't matter. Contract design stage is expected to be completed by June 2024 with a possible foreseen 6 months delay, to be followed by Detail-Production design stage which is necessary for the construction (Construction may simultaneously go on for the sections which the detail design phase is completed, however).

And 2029 is not the expected commissioning but partial acceptance date, may as well end up being commencing sea trials if delays occur in the project (which it will occur). Add +3 years for such a ship to reach initial operational condition. And add+3 years as Navy foresees as a margin of error or unexpected delays.

Writing this as a person who so far has given the accurate information on several naval projects, including what goes on TF-2000 in details while none other insiders or experts in social media were mentioning of these.

The only credible people on social media are the ones who doesn't give exact dates out of their arses.

They will come in June to say " Tests of TF-2000 is completed". Man, been telling it since December here on this forum and they will not even tell it is towing tank scaled model experiments for resistance, self-propulsion, and sea-keeping and maneuvering (at this point they will not even know about the tests being conducted in cavitation tunnel, but hey how come a ship is tested in a cavitation tunnel right? What is the purpose there, it is for cavitation). They even refrain from giving a reference to this forum.

No further comments.

I wrote it in jest. We've seen in previous projects that it can't be less than 5 years. I wrote it because my heart wanted it to be so, it was a wish.

China would have done it in 1 month.:LOL::p
 