Doesn't Turkish Type 214 boats also use ISUS 90-72 integrated sensors and CMS from Atlas? Or were they replaced by CMS Muren?
It is a little confusing but some parts of the CMS is provided by Havelsan (alongside with some other systems related or connected to the CMS). Müren and SEDA projects were commenced later, so likely Havelsan uses some part of these CMS with ISUS.

Does that mean that Turkey will soon have its own national engines to power their own submarines?
Already got one, though it is tiny, it is sufficient to power UUV, LUUVs, Midget submarines, SDV, etc.

my damaged brain, is wondering if this little baby can be deployed by TCG Anadolu :cool:
Technically yes, but not as is, it is primarily a test submarine likely not complying with all military certifications.
I really like what I'm seeing, though I'm curious about placement of torpedoes, it looks like it is right were crew is shown in the diagram. Can't wait to see the finished product.

Btw, you really think we're getting S80? Engine is great news and can be tied to S80, if we develop a bigger version I guess, but that would suggest there is a major problem somewhere either Reis project or something changed with MİLDEN, wouldn't it?
The torpedoes lie on top of the pressure hull (outside, between the fairing and pressure hull). I even think, with little modification and additional buoyancy it can be made to carry 2 HWT. (since torpedoes are nearly self buoyant).
it is an eventuality There is only one guy who can give an aswer to this question @Anmdt but Reis class is still an ongoing programme
What I mean by eventuality is;
logic dictates that integrating AKYA, sub ATMACA and GEZGIN to a foreign Combat management system should be not very desirable for the Navy anymore
I believe, not in short term but in near future TN would like to introduce Sub-Atmaca and AKYA in Reis Class.
Denizaltı itki sistemi should be the motor used in DATUM's mini submarine. Though it is depicted to be large (because of the 3D model preference in the video), it should be occupying little weight and volume (assuming this based on approximated installed power and torque requirement of the corresponding mini sub).
 

Anmdt

Experienced member
Naval Specialist
Professional
Messages
5,804
Solutions
2
Reactions
148 26,908
Nation of residence
Turkey
Nation of origin
Turkey
Well! If you check it out, the price of each S80 is near 1 billion Euros. That means 4billion Euros for four S80s. (It was estimated that in 2012 the cost of 4 subs to be around 2.2 billion Euros)
Our 6 Reis class ships’ total cost, at the time of contract, was to be 2.06 billion Euros. So there is a European product cost base saving, Navantia is thinking about. Yes! The S80 is bigger and may contain newer and more expensive technologies. But producing the subs in Turkey will prove to be a big cost saving exercise.
BAE Systems is also involved in manufacturing and supplying the pressure hull domes from its shipyard in Barrow UK adding to the cost.
As Turkish Reis Class AIP subs are being built entirely in Turkiye with most of it’s sub components being sourced locally; Probably apart from the Siemens BZM PEM unit (Proton Exchange Membrane) and the Austrian hull steel -soon to be of Turkish origin - , the submarines can be classed as of indigenous origin. This means we have means and an eco-system to build high tech submarines at a reasonable cost base to make them competitive in world markets. That is a big advantage for us and for a partner like Navantia!

The S80 Plus is as indigenous as it can get for the Spanish. Most of its critical systems are local. The electric motors and generators used in its propulsion system are made by Gamesa Electric of Spain. The diesel engines are MTU licensed production by Navantia in Cartagena Spain.


View attachment 62912
View attachment 62913
View attachment 62914

The partnership with Navantia on S80, could be a short track to Milden!
The only form that can go through is a partnership. It also fits to logic and feasibility.
 

Saithan

Experienced member
Moderator
Denmark Correspondent
DefenceHub Diplomat
Messages
9,857
Reactions
67 22,002
Nation of residence
Denmark
Nation of origin
Turkey
The only form that can go through is a partnership. It also fits to logic and feasibility.
How long will we have to wait for a submarine delivery if we go through with the partnership ?
 

dBSPL

Experienced member
Think Tank Analyst
DefenceHub Ambassador
Messages
2,871
Reactions
123 14,521
Nation of residence
Turkey
Nation of origin
Turkey
How long will we have to wait for a submarine delivery if we go through with the partnership ?
In addition to this, question 2: Can this (speculated) possible cooperation proceed as a parallel project with a private shipyard or public private partnership, independent of MILDEN? Lets say STM-TAIS-Navantia.
 

Anmdt

Experienced member
Naval Specialist
Professional
Messages
5,804
Solutions
2
Reactions
148 26,908
Nation of residence
Turkey
Nation of origin
Turkey
How long will we have to wait for a submarine delivery if we go through with the partnership ?
Just my humble opinion, it would differ by 2 years between each. But we would have a greater benefit following the path of MILDEN.

In addition to this, question 2: Can this (speculated) possible cooperation proceed as a parallel project with a private shipyard or public private partnership, independent of MILDEN? Lets say STM-TAIS-Navantia.
I would say lesslikely, unless SSB-MSB is desiring to kill Gölcük Shipyard and transfer entire know-how to private shipyards.
Gölcük shipyard has the only experience, and the best personnel to work on the submarines (for production, testing, assisting with direct feedback from the field, direct access to field personnel and ease of having no borders on subjects to exchange - no security restrictions between personnel).
Considering this experience was gained through decades, and a culture was adapted, it would be challenging similar one to be established in private shipyards. Also i shall emphasize this again, a submarine shipyard can not be focused on making profits, neither for repairs, nor for production. These vessels are strategical, and may not be exported or may not find a customer or this shipyard may not have been occupied to make a design to sell more, since its primary objective is to provide cutting edge submarines to TN flotilla. This is not feasible for private shipyards and this is why: A private shipyard would shut the submarine division or transfer personnel to another division once it stops profiting, since submarine business requires continuity and consistency, this would be devastating. That would be like we are going all in in roulette, playing on a single number.

However, this is not valid for submarines below certain dimensions with conventional capabilities, such as STM500, Dearsan's mini submarine or the as we have seen in the last example, DATUM. These kind of designs can be handled by private shipyards/companies. for both having an export potential and ease of design / construction / production / testing / necessity of facility / equipment / or personnel contiunity.
 

Yasar_TR

Experienced member
Staff member
Administrator
Messages
4,280
Reactions
263 22,349
Nation of residence
United Kingdom
Nation of origin
Turkey
Considering this experience was gained through decades, and a culture was adapted, it would be challenging similar one to be established in private shipyards. Also i shall emphasize this again, a submarine shipyard can not be focused on making profits, neither for repairs, nor for production. These vessels are strategical, and may not be exported or may not find a customer or this shipyard may not have been occupied to make a design to sell more, since its primary objective is to provide cutting edge submarines to TN flotilla.
Noted!
But in the coming years, if we want to sell submarines to other parties, we need to manufacture them somewhere. Especially if a partnership is realised with the Spanish.
We know that STM carried out Pakistani submarine modernisation programme. Again, STM, Aselsan, HAVELSAN and ASFAT carried out the Preveze modernisations. So they are capable to handle technical work on submarines.
Navantia is a state owned entity that manufactures submarines, LHDs and frigates for Spanish navy. HMAS Adelaide was manufactured by Navantia shipyard Ferrol. HMAS Canberra’s hull was manufactured in Span then towed to Australia for fitting.
Can a similar approach be adopted whereby the hull of the subs can be readied in modules and then moved to another site to be put together by STM etc. and know how and design input can be provided by Gölcük?
Just a thought!!
In such a partnership there are so many positives that we can acquire in terms of know how and new technologies that it would be absolutely priceless. Having come from a German School of submarine manufacturing and then marrying that with Spanish tech will be invaluable to us.

These vessels may be strategic assets. But we seem to be quite prepared to part with these strategic platforms whilst giving away their building know how as well; as seen in Milgem sales. Also to be noted is the fact that if this partnership is to be realised, the Spansh are too, prepared to part with their know how and tech. So it works both ways.
As they say; if there is a will, there is always a way.
 

Anmdt

Experienced member
Naval Specialist
Professional
Messages
5,804
Solutions
2
Reactions
148 26,908
Nation of residence
Turkey
Nation of origin
Turkey
Can a similar approach be adopted whereby the hull of the subs can be readied in modules and then moved to another site to be put together by STM etc. and know how and design input can be provided by Gölcük?
Just a thought!!
For this part, Section 50 of Reis is manufactured by STM-Gurdesan and transferred to Golcuk. This will likely happen so for Milden as well, and i expect propulsion deck to be produced as whole by a contractor and delivered to Golcuk. STM already involves in Reis and they will also do so in Milden, but when it comes to merging blocks, preparing the hull and equipping it and moreover managing it all, i believe it is Golcuk's expertise.
So in the end we might get some parts done outside (fiber glass hull, non critical steel parts, individual parts like sail) but critical parts (pressure hull) and assembly,equipping made in Golcuk.

Preveze upgrade was also done in Golcuk. What we as 'Asfat' is Golcuk for shipyards, Pendik for surface vessels. STM's agosta was remarkable, but again they worked with KSEW who has certain shipbuilding capabilities. Outsourcing hull production is common, but submarine is a niche business.
 

Sanchez

Experienced member
Moderator
Think Tank Analyst
DefenceHub Diplomat
Messages
4,195
Reactions
127 19,057
Nation of residence
Turkey
Nation of origin
Turkey
Developed within the framework of the Technology Acquisition Obligation of the DIMDEG project led by the SSB, the Multipurpose Mini Submarine (MMSS), which will be the first indigenous submarine to be classified by Türk Loydu, is being built by Sefine Shipyard and ITU subsidiary DATUM.


 

Sanchez

Experienced member
Moderator
Think Tank Analyst
DefenceHub Diplomat
Messages
4,195
Reactions
127 19,057
Nation of residence
Turkey
Nation of origin
Turkey
TCG Oruçreis underwent her first voyage after her MLU. Finally.

22AwJd7.jpeg

ZFutaf7.jpeg


 

cr33pt3d

Active member
Messages
78
Reactions
6 210
Nation of residence
Turkey
Nation of origin
Turkey
I'm wondering where is the CIWS in the front ? no phalanx or no Gokdeniz ? the update was supposed to have 2 CIWS, not sure if there will be enough space for 16 Atmaca between the two mast ? what you guys think, otherwise, she looks amazing !

barbaros_upgrade.png
 

boredaf

Experienced member
Messages
2,271
Solutions
1
Reactions
42 6,661
Nation of residence
United Kingdom
Nation of origin
Turkey
I'm wondering where is the CIWS in the front ? no phalanx or no Gokdeniz ? the update was supposed to have 2 CIWS, not sure if there will be enough space for 16 Atmaca between the two mast ? what you guys think, otherwise, she looks amazing !

View attachment 63010
Place where Gökdeniz is supposed to be is empty in the photos so it'll probably get installed later? And it looks like at least 1 rack for Atmaca has been installed. Everything else seems to be on it already.
 

Sanchez

Experienced member
Moderator
Think Tank Analyst
DefenceHub Diplomat
Messages
4,195
Reactions
127 19,057
Nation of residence
Turkey
Nation of origin
Turkey
I'm wondering where is the CIWS in the front ? no phalanx or no Gokdeniz ? the update was supposed to have 2 CIWS, not sure if there will be enough space for 16 Atmaca between the two mast ? what you guys think, otherwise, she looks amazing !

View attachment 63010
Its place is ready. Probably not yet fitted in.
 

BalkanTurk90

Contributor
Messages
921
Reactions
5 1,355
Nation of residence
Albania
Nation of origin
Turkey
Great upgrade , the mast looks like Istanbul class one but if they would aslo change the body to steath shape like S africa Valour class or Algerian, egytian ones would be super modernised warships to serve for another 20 years .
3b7516b5.jpg
 

TheInsider

Experienced member
Professional
Messages
4,894
Solutions
1
Reactions
51 17,040
Nation of residence
Turkey
Nation of origin
Turkey
Other than Smart-S it looks good. We should have installed the required power generation/delivery systems and done EMI/ECM tests for the CENK-S. The Navy should have made plans to switch CENK-S from the SMART-S in a few years and install Smart-S on other platforms like TCG Bayraktar and some of the Hisar Class OPVs which will have MAR-D.
 