Technically speaking they have no place to build AC. Drydock of İstanbul Naval Shipyard (İNS) does not allow the draft of AC, and it has to be dug up and rebuilt in place. They will build few blocks of AC to release a budget (use it as a propaganda tool) and continue with preliminary design phase.Ministry of National Defence Yaşar Güler: The first sheet metal cutting in the TF-2000 Air Defense Warfare Destroyer and Domestic Aircraft Carrier projects will be done in the first half of 2025.
TF-2000 was expected but the metal cutting of the AC in the next 6 months? Oh come on!
However, i won't be surprised to see if this turns out to be TCG Trakya. But again, it is not build in İNS, but Sedef Shipyard. He is referring to a ceremony in İNS.
And for TF2000 we may see a full speed ahead level construction in by end of 2026. Design has parts to be completed.