Intrinsically i have introduced a year delay and haven't assumed all three ships can be simultaneously outfitted. If all three shipyards are capable of carrying out simultaneous outfitting and organization of logistics and integration of components then the dates are achievable by maximum a year delay. As in, 2027 for first three, 2028-2029H1 for remaining 4 is safely achievable.![]()
STM - Cumhurbaşkanı Erdoğan MİLGEM Fırkateynlerinin İnşasını Başlattı
Cumhurbaşkanı Erdoğan, MİLGEM projesinin 6-7-8. fırkateynlerinin sac kesim törenini gerçekleştirdi. Haberin detaylarını incelemek için tıklayınız.www.stm.com.tr
April 2023, all three ships’ steel cutting was done at the same time. It was then stated by RTE that within 36 months all 3 ships would be delivered to the Navy. According to this statement the 1st, 2nd and 3rd ships on your list, all should be delivered to the navy before April 2026. (the attached X message actually states that the first 3 ships will be delivered in 2026. Remaining ship to be delivered in 2027)
I wonder if those pictures are old and dated. And in reality the production is far ahead of what is portrayed in the pictures!
View attachment 72766
We are highly benefiting from utilizing resources of three separate shipyards and STM's expertise in logistics management. But could they manage limited subcontractors on specialized fields, or could they find alternatives to certain ones? Could manufacturers of components catch up with the schedule and so on. Seeing Izmir / Izmit's progress will tell us about the rest, imo. I can't see it yet.