I wouldn't expect a lot of news from TF6000 while ground tests are running, which is probably a year or two at best. Last news was test were still going a couple months ago I think.
What about tf10000 though?
 

begturan

Active member
Messages
116
Reactions
1 197
Nation of residence
Turkey
Nation of origin
Turkey
I wouldn't expect a lot of news from TF6000 while ground tests are running, which is probably a year or two at best. Last news was test were still going a couple months ago I think.
Generally, there is no embargo on products in the prototype phase in Turkey, whenever they want to move on to the mass production phase, problems arise in the supply of subsystems, so it is normal for us to receive news a little late about the TF6000, the local subsystems are being prepared.

If we can get the TF6000 into mass production, it will be that much easier to get the TF35000 into mass production.
 

boredaf

Contributor
Messages
1,478
Solutions
1
Reactions
17 4,095
Nation of residence
United Kingdom
Nation of origin
Turkey
What about tf10000 though?
Probably still in design phase? I doubt they would freeze the design and start building a prototype before going through whole battery of tests with TF6000 since it'll be the basis for TF10K. That is just my guess though, because a jet engine is a very complicated challenge and as TEI president said in one interview, you can only do so much with simulations and analyses, you have to test, pick the engine apart, see what happens to this or that, put it together, test again, and again and again to be sure.
 

boredaf

Contributor
Messages
1,478
Solutions
1
Reactions
17 4,095
Nation of residence
United Kingdom
Nation of origin
Turkey
Generally, there is no embargo on products in the prototype phase in Turkey, whenever they want to move on to the mass production phase, problems arise in the supply of subsystems, so it is normal for us to receive news a little late about the TF6000, the local subsystems are being prepared.

If we can get the TF6000 into mass production, it will be that much easier to get the TF35000 into mass production.
That'll still be a several years before TF6000 ground and flying tests end and it enters into first LRIP and then serial production though.

And I doubt it'll be just as easy as turning on a CAD and increasing the diameter of TF6K, TF35K will be a whole another beast to tackle.
 

Shtr

Active member
Messages
107
Reactions
4 185
Nation of residence
Turkey
Nation of origin
Turkey
Time is passing so fast. One year almost passed after first fire of the engine. Despite of knowing the fact that such works takes at least 3-4 years to mature an engine, we are still hopeful and expecting some miracles.
 