TR Propulsion Systems

Zafer

Experienced member
Messages
4,873
Reactions
8 7,556
Nation of residence
Turkey
Nation of origin
Turkey
Mahmut Akşit said in IDEF2025 that TF-6000 turbofan tests are progressing. Tests reached 3700 lbf so far and expanding envelope as planned. Considering TS-1400 reached 1800 lbf emergency thrust. I believe they will surpass 6000 lbf. I just wish these things didn't take soooooooo much time. We may end up in a war at any moment to stop David corridor, division of Syria(same plan they had even before they destroyed Ottomans using WW1) and a PKK state and here these people are taking their sweet time even for a drone engine like TF-6000 as if nothing is happening.:mad:
Do you have a link to that statement video please. He never gave a thrust level number before, so this seems suspicious.
 

DBdev

Well-known member
Messages
302
Reactions
8 526
Nation of residence
Turkey
Nation of origin
Turkey
Do you have a link to that statement video please. He never gave a thrust level number before, so this seems suspicious.
I watched a video yesterday wanted to post here but couldn't find it today neither on Youtube nor on X. Sorry.

That is from memory if I am not mistaken that was the number. Asked ChatGpt about the progress yesterday says it is normal and this is a very great achievement even at this stage.
 

Zafer

Experienced member
Messages
4,873
Reactions
8 7,556
Nation of residence
Turkey
Nation of origin
Turkey
I watched a video yesterday wanted to post here but couldn't find it today neither on Youtube nor on X. Sorry.

That is from memory if I am not mistaken that was the number. Asked ChatGpt about the progress yesterday says it is normal and this is a very great achievement even at this stage.
The actual number should be way ahead of that number I gather from all the bits and pieces of information we have heard along the way so much so that it can be put to flight trials in a matter of a few months I would say. However if there is no pressure for them to do so they are already putting more effort into the TF10000 development as Kızılelma requires an afterburner engine than on the TF6000. This can all change if TAI would want to use the TF6000 rather than the existing Ukrainian engine they are using now because of evolving political matters.
 

Shtr

Active member
Messages
132
Reactions
6 232
Nation of residence
Turkey
Nation of origin
Turkey
They announced they surpassed the thrust level of the engine that was on KE's first prototype. So the number @DBdev posted should be true.

I think he was referring numbers with after burner. How is it possible to start TF10000 without getting right numbers at TF6000? I think they reached %10 better numbers.
 

Yasar_TR

Experienced member
Staff member
Administrator
Messages
3,582
Reactions
192 18,288
Nation of residence
United Kingdom
Nation of origin
Turkey
I think he was referring numbers with after burner. How is it possible to start TF10000 without getting right numbers at TF6000? I think they reached %10 better numbers.
I don’t remember Dr Aksit ever mentioning a 3700lbf being reached. I followed most of his interviews.
When they first got the TF6000 ready, he said that in the first firing tests they may not reach the 6000lbf target. But he said it should be 3500 or more. As the engine matures the thrust levels will increase. This was before first ignition though.
Then he said, as per @boredaf ’s post, it has surpassed the thrust levels of the engine KE prototype used.

He also mentioned that TF6000 and TF10000 are different engines.
Because TF6000 doesn’t have afterburners it would be built to a specific constructional standard.
TF10000 will have afterburner. You can’t put an afterburner on TF6000. Because with a sudden thrust increase the engine may collapse. Parts will have to be manufactured to a higher standard.
There is no need to manufacture TF6000 to that standard for cost reasons.

That is why Honeywell have F124 and F125. ( non AB and with AB comparable turbofans)
And, that is why we are calling ours with separate names.
 
Last edited:

Bogeyman 

Experienced member
Professional
Messages
9,514
Reactions
72 31,875
Website
twitter.com
Nation of residence
Turkey
Nation of origin
Turkey
TF35000 going well only thing Aksit do not give is date, lets wait and see.


1.png


Early tests of the TF35000, Türkiye's highest thrust domestic and national turbofan engine developed by TEI, are planned to be carried out in 2026 and its integration into KAAN is planned to begin in 2032.
Issue 141
 

hugh

Contributor
Messages
470
Reactions
13 1,212
Nation of residence
Turkey
Nation of origin
Turkey
View attachment 76726

Early tests of the TF35000, Türkiye's highest thrust domestic and national turbofan engine developed by TEI, are planned to be carried out in 2026 and its integration into KAAN is planned to begin in 2032.
Issue 141
since they specifically utter "early tests" for 2026, I assume it won't be a fully built engine but some modular tests to validate their assumptions before committing to a prototype.
 

Ripley

Contributor
USA Correspondent
DefenceHub Diplomat
Messages
948
Reactions
31 2,866
Nation of residence
United States of America
Nation of origin
Turkey
Integration to Kaan starting in 2032 means Kaan won't be delivered with TF35000 in 2032.
And let’s not forget that if we take his words literally, then by integration they mean just installing the engine, introducing the engine to the plane. In such case, a production line plane will be even beyond 2032.
 

Strong AI

Experienced member
Messages
2,204
Reactions
51 7,138
Nation of residence
Germany
Nation of origin
Turkey
And let’s not forget that if we take his words literally, then by integration they mean just installing the engine, introducing the engine to the plane. In such case, a production line plane will be even beyond 2032.

But then how come that Indonesia will get all 48 KAANs in 10 years with TF35000?
 

Sanchez

Experienced member
Moderator
Think Tank Analyst
DefenceHub Diplomat
Messages
3,287
Reactions
102 14,872
Nation of residence
Turkey
Nation of origin
Turkey
I think it gets lost in translation and he's not talking about 120 months starting. If he is, that means they accepted paying very heavy fines in the long term to get a partner now; that'd be dumb.

I think he's talking about solidifying the MoU to a contract in as little time as "1.5 months". But I believe delivery schedule will start with Indonesia paying the first installment and then it will go on for 120 months. We don't know when did Indonesia paid or will pay the first installment.
 
Last edited:

Strong AI

Experienced member
Messages
2,204
Reactions
51 7,138
Nation of residence
Germany
Nation of origin
Turkey
I think it gets lost in translation and he's not talking about 120 months starting. If he is, that means they accepted paying very heavy fines in the long term to get a partner now; that'd be dumb.

I think he's talking about solidifying the MoU to a contract in as little time as "1.5 months". But I believe delivery schedule will start with Indonesia paying the first installment and then it will go on for 120 months. We don't know when did Indonesia paid or will pay the first installment.

To me he literally talks about the export agreement and that it officially started with that signing. But it doesn't make sense to argue about that now.
The good ol' let's wait and see applies here.
 