Mahmut Akşit said in IDEF2025 that TF-6000 turbofan tests are progressing. Tests reached 3700 lbf so far and expanding envelope as planned. Considering TS-1400 reached 1800 lbf emergency thrust. I believe they will surpass 6000 lbf. I just wish these things didn't take soooooooo much time. We may end up in a war at any moment to stop David corridor, division of Syria(same plan they had even before they destroyed Ottomans using WW1) and a PKK state and here these people are taking their sweet time even for a drone engine like TF-6000 as if nothing is happening.