If we had the time and/or the fighter jet, we too would have been willing to wait years. But we have neither. The Kaan project must not face delays like the Altay or Hürkuş programs. We were fortunate with the Altay; the era of conventional tanks came to an end due to the FPV revolution. However, there is still no vehicle capable of replacing the fighter jet or surpassing its effectiveness.We talk about days, weeks or months. Others about years or decade of delays.
One example, the FCAS project of Germany. 9 years just for CDP with an ending of the whole project.
Wait a little longer and manned jets will already become obsolete. Kızılelma is starting its service life soon and within a few years it has the potential to make manned fighters look like liability rather than power.If we had the time and/or the fighter jet, we too would have been willing to wait years. But we have neither. The Kaan project must not face delays like the Altay or Hürkuş programs. We were fortunate with the Altay; the era of conventional tanks came to an end due to the FPV revolution. However, there is still no vehicle capable of replacing the fighter jet or surpassing its effectiveness.
In that case, let's cancel this very costly Kaan project! After all, the Kızılelma powered by the TF6000 engine is set to enter the inventory in early 2027. The TF10000 will undergo its first ignition sometime in 2027. Presumably, by 2032, we will have Kızılelma squadrons that are combat-ready in every respect.Wait a little longer and manned jets will already become obsolete. Kızılelma is starting its service life soon and within a few years it has the potential to make manned fighters look like liability rather than power.
Wait a little longer and manned jets will already become obsolete. Kızılelma is starting its service life soon and within a few years it has the potential to make manned fighters look like liability rather than power.
Massive copeWait a little longer and manned jets will already become obsolete. Kızılelma is starting its service life soon and within a few years it has the potential to make manned fighters look like liability rather than power.
Yes, I think it will drag on until 2027Tusas CEO Dr Demiroglu has been giving out new dates and at the same time trying to divert attention from delayed Kaan P1 first flight with small news about other stuff. .
“KAAN is an aircraft in which all major systems—with the exception of just two—have been developed domestically. Its landing gear and actuators—the components that drive the movement of control surfaces—are domestically produced. Its oxygen system, radar, and munitions are also domestic; in short, it is truly a domestic product. We are also continuing our efforts to ensure that its engine becomes domestically produced in the coming years. KAAN is our most challenging and technologically advanced platform, boasting a level of domestic content that rivals even our land vehicles. Ground operations are currently underway for the first test prototype, designated “DAP-1.” Whether in October or November, we hope to see KAAN take to the skies this year.”
“We have one gasoline-powered, propeller-driven vertical take-off platform called ‘Gölge’; all our other platforms are jet-powered. We are working across three different categories: one platform with a range of up to 300 kilometers, another in the 600-kilometer range, and a third in the 1,000-kilometer range. All of them have successfully passed tests for aerial launching, catapult and ramp launching, and RATO (Rocket-Assisted Take-Off) launching. We have now entered mass production—not in the sense of traditional aviation mass production, but with production volumes closer to those of the automotive industry. Our goal is to establish a system where a platform rolls off the production line every hour or every two hours.”
Are we going to believe this?
He is the harbinger of deadline-delay . Not a single word he has uttered about Kaan P1 first flight has come true.
Second part, especially the last sentence is the biggest BS there is if you take Tusas’s past performance as norm. Seeing is believing. Put your money where your mouth is.
In Turkish:
Ayinesi iştir kişinin lafa bakılmaz
In his first detailed broadcast updates following his appointment, he stated that the P1 and P2 prototypes were expected to take flight by the end of 2025.
later date Shifts: The expected first flight timeline for the P1 was later adjusted to April or May 2026, then to May or June 2026, and eventually pushed toward late 2026 after it began ground taxi trials on July 31, 2026
![]()
Mehmet Demiroğlu Açıkladı: KAAN, HÜRJET ve HÜRKUŞ'ta Son Durum Ne? | SavunmaSanayiST
Bakü'de düzenlenen ADEX 2026'da SavunmaSanayiST'ye konuşan TUSAŞ Genel Müdürü Dr. Mehmet Demiroğlu, HÜRKUŞ-2'nin ilk ihracatından HÜRJET ve KAAN'ın geleceğine kadar birçok konuda açıklamalarda bulundu.www.savunmasanayist.com
You know Kizilelma is a bomber,right?Wait a little longer and manned jets will already become obsolete. Kızılelma is starting its service life soon and within a few years it has the potential to make manned fighters look like liability rather than power.
KIzılelma can evolve into anything you want. With every iteration it can improve its capabilities like how smart phones evolved, it is a smart device.You know Kizilelma is a bomber,right?
A few years back in an event in Istanbul Selçuk Bayraktar talked about that but it is not easy to get people out of their comfort zone where they want to stick with the old school. There is a paradigm change happening, unless a big pitfall suddenly appears we will probably fly today's manned planes in unmanned configuration going forward. No need to invest in pilot training, no need to take decades to make a plane. You can roll out new planes every 18 months like you are making a consumer product.In that case, let's cancel this very costly Kaan project! After all, the Kızılelma powered by the TF6000 engine is set to enter the inventory in early 2027. The TF10000 will undergo its first ignition sometime in 2027. Presumably, by 2032, we will have Kızılelma squadrons that are combat-ready in every respect.
Right?
Kizilelma was designed and is predominantly for air combat. It is not going to be as stealthy as an Anka-3. It will be good for BVR engagements against 4th and 4.5 generation fighters with our F16s in the background. As a bomber it can be used only in less contested airspace and/or with stand off ammunition at its disposal. Of course it needs to utilise its IWBs efficiently and effectively for that.You know Kizilelma is a bomber,right?