• Forum restore complete (see latest announcement thread)

TR UAV/UCAV Programs | Anka - series | Kızılelma | TB - series

Yasar_TR

Experienced member
Staff member
Administrator
Messages
4,280
Reactions
263 22,349
Nation of residence
United Kingdom
Nation of origin
Turkey
As far as I understand, Mr Bayraktar has said “serial production”. Not mass production.
Serial production of a complex machine like a plane is never the same as producing prototypes. You need to get the eco system to feed the production line, ready. You need to straighten out the kinks in production.
There will be many obstacles and hurdles that need to be sorted before a fully fledged KE is in production. This bird is not a TB2 and not the same as Akinci. Akinci is a stable and slow flying machine. KE is an unstable jet engine powered fighter plane with a potentially supersonic airframe. It may be ready for Low Rate Initial Production run trials. But it will still need a lot of tweaking before it is fully combat ready.
Personally I can’t wait to see the engine with after burner fitted to this plane. Especially when the TF10000 is ready. It will be a monster and a game changer level aircraft.
 
Last edited:

Anmdt

Experienced member
Naval Specialist
Professional
Messages
5,804
Solutions
2
Reactions
148 26,908
Nation of residence
Turkey
Nation of origin
Turkey
As far as I understand, Mr Bayraktar has said “serial production”. Not mass production.
There is no difference in Turkish language, i have never seen mass production to be called "toplu üretim", it is always referred as "seri üretim/imalat".
What is going to happen perfectly fits to definition of LRIP as well, the platform has not been, yet, tested by TurAF or TN.
 

Yasar_TR

Experienced member
Staff member
Administrator
Messages
4,280
Reactions
263 22,349
Nation of residence
United Kingdom
Nation of origin
Turkey
There is no difference in Turkish language, i have never seen mass production to be called "toplu üretim", it is always referred as "seri üretim/imalat".
What is going to happen perfectly fits to definition of LRIP as well, the platform has not been, yet, tested by TurAF or TN.
100% correct.
In Turkish language there is no specific difference.
However, in mass production, the production of article in question is continuous.
In serial production, a specific batch of goods is produced, then there is a downtime. After the downtime, production system may be altered or upgraded and prepared to produce brand-new articles by restarting or stopping altogether until as and when the next order comes in.
As we are communicating in English we should be interpreting his speech within the context he is using, rather than translating it word by word.
 

B_A

Contributor
Messages
1,134
Reactions
4 1,282
Nation of residence
Turkey
Nation of origin
Turkey
The Americans have decades of experience with aerospace and aviation that qualify them to make a drone 100x better than KE in the same timespan of KE.

SpaceX did extensive testing that took them around 4 years for the first successful launch before their first mission in 2012 and it was mini NASA cargo mission.

Baykar with 0 experience in the Jet and stealth business announcing that 2024 will deliver KE is utterly ridiculous.
Newcomers defeat the old giant is very normal in the world.

1950-70s,The American and British have decades of experience with Automotive Industry then easily defeated by Japanese.

1990-2000s The Japanese household appliances makers which have decades of experience defeated by Chinese and Korean company.
 

Oublious

Experienced member
The Netherlands Correspondent
Messages
2,780
Reactions
15 6,101
Nation of residence
Nethelands
Nation of origin
Turkey
@YeşilVatan



On the other hand TAI can be trusted with Anka-3 to deliver the expected. TAI have an aerospace manufacturing experience and most importantly they will use what they have learned in KAAN project into the Anka-3.

If the government hold a competition between TAI and Baykar for a drone that fit the same KE capability, honestly who would win ?


Why is ANKA-3 still not flying? What if ANKA-3 never will fly? Or maybe 1 year later?
 

dBSPL

Experienced member
Think Tank Analyst
DefenceHub Ambassador
Messages
2,871
Reactions
123 14,521
Nation of residence
Turkey
Nation of origin
Turkey
A new sub-cloud VTOL system:


GÖKHUN is getting ready for duty:
- Positioned between tactical and mini UAVs, GÖKHUN Unmanned Aerial Vehicle System will be able to operate in ship and land-based operations with "the highest payload and endurance in its class".
- 110kg maximum take-off weight
- 18 kilograms payload capacity
- 16 hours in the air with 12 kilograms payload


I think one more system's images will be shared during the day. The experience and know-how accumulated in semi-military and military UAV systems in the tactical-to-mini range, as well as the interest in indigenisation and investment, show that the sector is now on its way to becoming a global supplier. Soon such things will become daily news, and I think it has already started to happen.

Edit:
 
Last edited:

Quasar 

Contributor
Moderator
Messages
920
Reactions
54 4,037
Nation of residence
Nethelands
Nation of origin
Turkey
A new sub-cloud VTOL system:


GÖKHUN is getting ready for duty:
- Positioned between tactical and mini UAVs, GÖKHUN Unmanned Aerial Vehicle System will be able to operate in ship and land-based operations with "the highest payload and endurance in its class".
- 110kg maximum take-off weight
- 18 kilograms payload capacity
- 16 hours in the air with 12 kilograms payload


I think one more system's images will be shared during the day. The experience and know-how accumulated in semi-military and military UAV systems in the tactical-to-mini range, as well as the interest in indigenisation and investment, show that the sector is now on its way to becoming a global supplier. Soon such things will become daily news, and I think it has already started to happen.

Edit:

F4pB5_iWgAE9smf

ESEN seems to be one of the hidden gems :devilish:

in addition to the unmanned aerial systems they have, they are also dealing with some important sub systems and products as well, For instance,
  • ESEN has confirmed that it has tested its GöRDES Vision-Based Navigation (VBN) system on a range of different UAS (unmanned aerial systems) at altitudes from 1000 to 15,000 feet AGL. The platforms used for the trials included the NATO Class III ANKA MALE (medium altitude long endurance) UAV, as well as Class I small UAS. Althought it is not new or unique the good new is the number of our companies dealing with similar systems or products are increasing and such systems are becaming a common feature.

GöRDES Vision-Based Navigation System provides accurate and real time position, velocity and attitude information for aerial vehicles under GNSS denied conditions via onboard imaging and image processing.​

However, GNSS signals are widely subject to jamming and spoofing under operational conditions. To mitigate this vulnerability, alternative ways of navigation are needed. Thanks to advances in image processing, photogrammetry, and computer vision, studies on image-based navigation systems have come to the fore as complementary systems.​

By using image processing and computer vision algorithms, GöRDES provides position, velocity, and attitude information by matching the previously captured onboard satellite/aerial images with the images taken from the GöRDES camera system of the aerial platform. GöRDES provides accurate positioning and attitude information for aerial vehicles to complete their mission and safely return home.​

1693253678399.png
 
Last edited:

Zafer

Experienced member
Messages
5,654
Reactions
15 8,712
Nation of residence
Turkey
Nation of origin
Turkey
Why? Eventually, TAI should move forward just with unmanned aircrafts as direction is on that way.
Eventually is in the future but not just yet. Complaining about lack of engineers but spreading your efforts over many projects while also duplicating similar efforts like Kızılelma is counterintuitive. TAI has lots of projects at hand which needs to be completed in due time.
 

Agha Sher

Experienced member
DefenceHub Diplomat
Messages
2,909
Reactions
14 9,764
Nation of residence
Denmark
Nation of origin
Afghanistan
Anka-3 has not flown yet, in contrast to statements being made about an imminent flight for almost a year.

T-625 has not been delivered yet, in contrast to statements being made about an imminent delivery for almost a year.

Hurkus has not been adopted by Turkiye, due to not meeting requirements.

TAI really needs to focus and stop overextending themselves. Way too many important projects are in their hands.
Forget Anka 4. Make TF-X, Hurjet, Anka-3, T-625 and Hurkus-2 successful products first.
 

Tornadoss

Experienced member
Messages
1,556
Reactions
7 3,092
Nation of residence
Czechia
Nation of origin
Turkey
Eventually is in the future but not just yet. Complaining about lack of engineers but spreading your efforts over many projects while also duplicating similar efforts like Kızılelma is counterintuitive. TAI has lots of projects at hand which needs to be completed in due time.
What do you think these engineers specialized with UAVS do after completion of Anka 3/4 ? They should continue with uav development. You just want monopoly.
 
Top Bottom