Pokemonte13
Contributor
its not easier to test and develop an engine for kizilelma its just that the risk of losing of an airframe is more acceptable because there is no pilot but no one is going to buy 50 million dollar drone with half baked subsytemsKızılelma is an unmanned fighter, it needs an engine that can be delivered in a short time like 4 years from the beginning of the project. The engine does not need to be 100% mature like the manned fighter engines do. When you want to use the engine on a manned plane you spend more time maturing it but in the case of Kızılelma you just need an engine that delivers the power and stays in the air, so an experimental engine is just fine for Kızılelma. They can even experiment with novel features and fly it once it proves to be durable in flight. So you don't need to be a top notch engine maker to make it. Baykar should keep the design in house but outsource parts making for many of its parts. Also TurAF will probably not be the majority user as there is the Euro market and the rest of the world. You just need to make it available when the customer is ready to buy.
Last edited by a moderator: