If everything inside is not burned, the damaged compartments can be cut out. The sub-block is built in a modular manner
Bingo
Another example of a heavily damaged submarine put back to life by removing and replacing the Block, the French SSN Perle.
12 June 2020:
Perle is damaged in a fire while in overhaul inside Toulon naval base:
12 June 2020:
Perle is damaged in a fire while in overhaul inside Toulon naval base.
10 December 2020:
Perle leaves Toulon aboard semi-submersible vessel
Rolldock Storm.
22 December 2020:
Perle reaches Naval Group’s submarine shipyard in Cherbourg.
February 2021:
Perle and
Saphir are both cut in half:
February 2021:
Perle and
Saphir are both cut in half.
March 2021: Preparation work for the junction of the two hulls sections:
March 2021: Preparation work for the junction of the two hulls sections.
April 2021: Wielding of the aft section of
Perle with the forward section of
Saphir.
Summer 2021: Undocking from the repair dry dock and start of overhaul work
Late 2021: Transit toward Toulon naval base to finish overhaul work
2023:
Perle back in operational service:
French shipbuilder Naval Group received Florence Parly, Minister of the Armed Forces, and Admiral Pierre Vandier, Chief of Staff of the French Navy, at its Cherbourg site. They visited the yard where the Rubis-class nuclear-powered attack submarine (SSN) Perle is currently being repaired. This...
www.navalnews.com