• Forum restore complete (see latest announcement thread)

TR Propulsion Systems

hugh

Contributor
Messages
567
Reactions
17 1,533
Nation of residence
Turkey
Nation of origin
Turkey
In that case not having a purchase order in place for Hürjet engines is even more mind boggling.
the engine order for Hürjet LCA should be made asap. that way we could have a better idea of the likelihood of them denying us KAAN's engines. But either way I don't think we have any alternatives to F110s other than our TF35K.
 

Spitfire9

Contributor
Think Tank Analyst
Messages
1,272
Reactions
17 1,665
Nation of residence
United Kingdom
Nation of origin
United Kingdom
the engine order for Hürjet LCA should be made asap. that way we could have a better idea of the likelihood of them denying us KAAN's engines. But either way I don't think we have any alternatives to F110s other than our TF35K.
What I read from official Turkish sources is that 20 KAAN will be delivered in 2028. For that to be possible, does Turkiye not have to organise engines for them soon? If F110 use in KAAN could be denied, the sooner that is revealed, the sooner that Turkiye can decide on its strategy for KAAN if F110 cannot be used

- carry on alone with TF35000 for as long as it takes (and buy an interim fighter)
- lower the spec of TF35000 to accelerate completion (derated V1, to be followed later by full spec V2)
- call in RR on a consultancy basis to accelerate completion using the current spec engine
- ??
 

2033

Committed member
Messages
204
Reactions
4 417
Nation of residence
Turkey
Nation of origin
Turkey
What I read from official Turkish sources is that 20 KAAN will be delivered in 2028. For that to be possible, does Turkiye not have to organise engines for them soon? If F110 use in KAAN could be denied, the sooner that is revealed, the sooner that Turkiye can decide on its strategy for KAAN if F110 cannot be used

- carry on alone with TF35000 for as long as it takes (and buy an interim fighter)
- lower the spec of TF35000 to accelerate completion (derated V1, to be followed later by full spec V2)
- call in RR on a consultancy basis to accelerate completion using the current spec engine
- ??
A company called TAEC was established with RR-Kale partnership, but I think there has been no progress on that. We have to build this engine completely ourselves.
 

Saithan

Experienced member
Moderator
Denmark Correspondent
DefenceHub Diplomat
Messages
9,856
Reactions
66 22,000
Nation of residence
Denmark
Nation of origin
Turkey
What I read from official Turkish sources is that 20 KAAN will be delivered in 2028. For that to be possible, does Turkiye not have to organise engines for them soon? If F110 use in KAAN could be denied, the sooner that is revealed, the sooner that Turkiye can decide on its strategy for KAAN if F110 cannot be used

- carry on alone with TF35000 for as long as it takes (and buy an interim fighter)
- lower the spec of TF35000 to accelerate completion (derated V1, to be followed later by full spec V2)
- call in RR on a consultancy basis to accelerate completion using the current spec engine
- ??
As I recall the 20 engines should already have been secured as the amounts acquisitioned were below a certain amount that could be completed without the Senates involvment. But I could be remembering wrongly...
 

Saithan

Experienced member
Moderator
Denmark Correspondent
DefenceHub Diplomat
Messages
9,856
Reactions
66 22,000
Nation of residence
Denmark
Nation of origin
Turkey
Already ordered 100 F404 engines in 2023.



Already ordered.

Sounds very fishy tbh, you don't order 100 engine without a planned production schedule.


While this is from July 2024, and as I see it it's collaboration. I doubt we've ordered 100 engine tbh. If it was the case I expect a non Turkish reliable source would announce it.

Found this

But I don'tt know if they've just looked at our defense news and continue the same narrative.

Here they say we've formally requested

September 2024
 
Last edited:

Nilgiri

Experienced member
Staff member
Administrator
Aviation Specialist
Messages
11,083
Reactions
153 22,638
Nation of residence
Canada
Nation of origin
India
As you guys have pointed out this is why I consider Hürjet trainer to be of utmost importance over KAAN atm. Because our so called allies would probably not mind selling us 90 engines for trainer jets.

So if we later on, after building them all, should have the need to convert them to LCA (light combat aircraft) and we can do that with minimal work, then we can still fly and wipe our arses, even if just barely.

But like I said earlier, making the LCA, and then asking for senate permission to buy trainer jet engine is going to be much more difficult.

Yes 3-4 years ago I mention that kind of thing many times, here's one instance:

It is why I personally follow Hurjet project lot closer. The timelines are sooner, more things matured/maturing quicker for it.... and it will illustrate the ecosystem maturity to take forward with TFX.

i.e we will see good proof one way or another (of everything you mention having to come together) in timeframe some are getting into (somewhat unnecessary tone) debate about.

There is no need to overly-praise or overly-diminish a solid project that is in the flow of things right now (that we cannot judge in some close-up microsystem way).

Results simply can be monitored and followed and compared with the debate preceding it....there should be no rush to produce judgement in this juncture from relatively casual observers + enthusiasts.

As you can sense and find all the issues lot quicker with smaller aircraft (both internally and with outside suppliers) that still ticks the important boxes (jet propulsion, avionics, LCA weapons capability)..... a more nimble project that can pump out a quicker production run ASAP too.

Any issues surfacing there gives early detection of same issues with TFX later and it buys you some time to think and develop solutions for that, rather than get shortchanged and stuck later.
 

Anmdt

Experienced member
Naval Specialist
Professional
Messages
5,804
Solutions
2
Reactions
148 26,908
Nation of residence
Turkey
Nation of origin
Turkey
Turbofans are jets too ;)
I am certain that Gezgin won't have a single version/block, Turbofan version will exist for Navy and BiGA should be the turbofan.

B i G A, what this could be ? Can't relate to anything but a small province in Marmara region. Should be something within the initials Bi and G + A. Or simply "Big Arat?"
 

TheInsider

Experienced member
Professional
Messages
4,894
Solutions
1
Reactions
51 17,040
Nation of residence
Turkey
Nation of origin
Turkey
Production plan/projection of Kale Jet engines.
Blue: Guided munitions(KGK kit, no engine)
White: Stand-off missiles (engine)
Beige: Anti-ship missiles (engine)

A production rate of over 9000 engines per year will be reached by 2032.
Kale plans to produce over 1000 engines(probably close to 1500) in 2025. (stand-off+anti-ship)
Note that Kale alone produced over 2000 KGK kits in 2023. Now we have other companies that produce guidance kits too. We have a huge production capacity.
GemX5_hWcAAm6Sf


Kale is developing Aratjet, Bigajet, and a variant of KTJ-1750 for drones. The KTJ-3200 variant for SOM is named KTJ-3200S, and the Atmaca variant is named KTJ-3200A there are also other variants for different projects.

You can read from page 65 unfortunately it is in Turkish.

 
Last edited:

Yasar_TR

Experienced member
Staff member
Administrator
Messages
4,277
Reactions
263 22,342
Nation of residence
United Kingdom
Nation of origin
Turkey
Can you explain what a 'continuous wave engine' is?
Essentially it is a CRDE. Continuously Rotating Detonation engine. As the fuel is injected in to the combustion chamber in a continuous manner, the detonations are formed in a wave motion creating a CDWRE .

1734195296202.jpeg

1734195362006.jpeg

 
Last edited:

dBSPL

Experienced member
Think Tank Analyst
DefenceHub Ambassador
Messages
2,871
Reactions
123 14,521
Nation of residence
Turkey
Nation of origin
Turkey
TUBITAK Marmara Research Center (MAM) Hydrogen and Fuel Cell Technologies Research Group has developed Turkiye's first domestic high capacity proton exchange membrane (PEM) type electrolyzer to obtain hydrogen with 99.9 percent purity. The green hydrogen to be obtained from the PEM electrolyzer system will be used to cool the turbine generators at the EnerjiSa Natural Gas Power Plant.

 

BalkanTurk90

Contributor
Messages
921
Reactions
5 1,355
Nation of residence
Albania
Nation of origin
Turkey

YeşilVatan

Contributor
Messages
802
Reactions
16 2,004
Nation of residence
Turkey
Nation of origin
Turkey
Can we build with this engine cheap drone just to hunt other drones without to much money spent like iranian doing that some of their small drones aslo downed tb2 or aksungur ??
Kozan Selçuk Erkan mentioned Iranians use an off the shelf small jet engine for 358. That kind of engine is more in Kale arge's roundhouse but I may be wrong about that.
 

Sanchez

Experienced member
Moderator
Think Tank Analyst
DefenceHub Diplomat
Messages
4,192
Reactions
127 19,052
Nation of residence
Turkey
Nation of origin
Turkey
Do you know that it is the world leader in its class with altitude?
If I had to guess, because noone else in the world has the need for such an engine. All of the competitors of Aksungur and even Anka use turboprop engines.

Can we build with this engine cheap drone just to hunt other drones without to much money spent like iranian doing that some of their small drones aslo downed tb2 or aksungur ??
358 uses a small jet engine. A killer drone with this engine would be too short of breathe.
 
Top Bottom