Dont we need the 4/5k ton frigates if we want to become a ''blue water'' navy?
Lets face it ,TF-2000 alone wont cut it.
AC,2 TF-2000,1/2 Milden,1 LSS and then what?
The old OHP's?
How to form a battle group?
Think of TF-2000 as a three-block program. Currently we are preparing for construction of 4 that will make the middle-tier AAW Destroyer functions. It will have a block with less weapon, sensors and multi-mission capabilities (through a multi-mission bay) version and an enlarged higher block version with more sensors, and better EW capability.
 

Anmdt

Experienced member
Naval Specialist
Professional
Messages
5,532
Solutions
2
Reactions
118 25,092
Nation of residence
Turkey
Nation of origin
Turkey
TCG Izmit (Third Ship)


TCG Izmir (Second Ship)


@Anmdt
With the speed these are being built could we see them being handed over to the Navy for tests next year?
The outfitting is the most difficult stage of all. Looking at these pictures, I can't figure out if they have used fitted out blocks like Istanbul Naval Shipyard is capable of. I would say towards the end of the year we can see them fully outfitted and delivered to Navy in H1, and H2 2026 (or more like not commissioned but manned by Navy) and H1 2027 for the third. 6 months off seems plausible to me. Add 6 to 12 months per ship for sea trials and testing. 6 months offset is considered necessary due to logistics and manning the process of equipment installation / outfitting, port acceptance tests and so on.

So approximately:
#HullSails at (Sea Trial)Commissioned
1stH1 2026H1 2027
2ndH2 2026H2 2027
3rdH1 2027H1 2028
4thH2 2027H2 2028
5thH1 2028H1 2029
6thH2 2028H2 2029
7thH1 2029H1 2030
 

Yasar_TR

Experienced member
Staff member
Administrator
Messages
3,272
Reactions
146 16,436
Nation of residence
United Kingdom
Nation of origin
Turkey
The outfitting is the most difficult stage of all. Looking at these pictures, I can't figure out if they have used fitted out blocks like Istanbul Naval Shipyard is capable of. I would say towards the end of the year we can see them fully outfitted and delivered to Navy in H1, and H2 2026 (or more like not commissioned but manned by Navy) and H1 2027 for the third. 6 months off seems plausible to me. Add 6 to 12 months per ship for sea trials and testing. 6 months offset is considered necessary due to logistics and manning the process of equipment installation / outfitting, port acceptance tests and so on.

So approximately:
#HullSails at (Sea Trial)Commissioned
1stH1 2026H1 2027
2ndH2 2026H2 2027
3rdH1 2027H1 2028
4thH2 2027H2 2028
5thH1 2028H1 2029
6thH2 2028H2 2029
7thH1 2029H1 2030

April 2023, all three ships’ steel cutting was done at the same time. It was then stated by RTE that within 36 months all 3 ships would be delivered to the Navy. According to this statement the 1st, 2nd and 3rd ships on your list, all should be delivered to the navy before April 2026. (the attached X message actually states that the first 3 ships will be delivered in 2026. Remaining ship to be delivered in 2027)

I wonder if those pictures are old and dated. And in reality the production is far ahead of what is portrayed in the pictures!

1734638032797.jpeg
 
Last edited:

Anmdt

Experienced member
Naval Specialist
Professional
Messages
5,532
Solutions
2
Reactions
118 25,092
Nation of residence
Turkey
Nation of origin
Turkey

April 2023, all three ships’ steel cutting was done at the same time. It was then stated by RTE that within 36 months all 3 ships would be delivered to the Navy. According to this statement the 1st, 2nd and 3rd ships on your list, all should be delivered to the navy before April 2026. (the attached X message actually states that the first 3 ships will be delivered in 2026. Remaining ship to be delivered in 2027)

I wonder if those pictures are old and dated. And in reality the production is far ahead of what is portrayed in the pictures!

View attachment 72766
Intrinsically i have introduced a year delay and haven't assumed all three ships can be simultaneously outfitted. If all three shipyards are capable of carrying out simultaneous outfitting and organization of logistics and integration of components then the dates are achievable by maximum a year delay. As in, 2027 for first three, 2028-2029H1 for remaining 4 is safely achievable.

We are highly benefiting from utilizing resources of three separate shipyards and STM's expertise in logistics management. But could they manage limited subcontractors on specialized fields, or could they find alternatives to certain ones? Could manufacturers of components catch up with the schedule and so on. Seeing Izmir / Izmit's progress will tell us about the rest, imo. I can't see it yet.
 