Another slide previously unseen showing the mission loadout of the MCMV. Multiple types of UUVs, ability to carry 2 USVs as well as 2 RHIBs.
View attachment 72906
Is TF-2000's first steel cut also ceremonial like the aircraft carrier? Why did they start "building" MİLDEN, MUGEM and TF-2000 at the same time? Is it just for the "wow effect"?
Because it makes sense?Is TF-2000's first steel cut also ceremonial like the aircraft carrier? Why did they start "building" MİLDEN, MUGEM and TF-2000 at the same time? Is it just for the "wow effect"?
Very good newsPer the weekly briefings, first steel cut and welding activities of TF-2000, MilDen and MUGEM were completed.
They started the design of the AC like yesterday. How does that make sense? I'm sure you know how much TF2000's design took? Does the suffix "2000" mean anything?Because it makes sense?
It happens in politics. Until the 2028 elections, they have to come up with something. At least this kind of political show is useful for our military needs.They started the design of the AC like yesterday. How does that make sense? I'm sure you know how much TF2000's design took? Does the suffix "2000" mean anything?
Did u know that when we buy Anadolu we aslo buy TOT with it , Perhaps they just took Anadolu design and modify it longer and heavier , its like how much time did take for Milgem 99 meter to milgem 114 meter change design ?? Perhaps few months .They started the design of the AC like yesterday. How does that make sense? I'm sure you know how much TF2000's design took? Does the suffix "2000" mean anything?
They started the design of the AC like yesterday. How does that make sense? I'm sure you know how much TF2000's design took? Does the suffix "2000" mean anything?
Few months.How long have we been designing (initial to production design) the MUGEM?
I have described it as far as i could in earlier posts,Maybe symbolic ceremonies to mark the concrete start of projects? Could they be test blocks? Or maybe the production of some blocks was started before the detailed design was completed? Or, more optimistically, the information given to the press about the stages of the projects was not synchronized with the progress actually made. I am sure ANMDT üstad will enlighten us in detail on these issues.
But What I would like to draw attention to is the fact that our Naval Forces Command has reached the infrastructure and technical conditions to start the construction of three strategic platforms at the same time with its own infrastructure, which all 3 vessels are flagships in their class with a total displacement of more than 75 thousand tons. Turkish naval industry promise a very different future. This will potentially shape the international image of the Turkish state, its political power, also the nation's view of maritime affairs and many other factors from the roots.
edit: A list of naval ships currently production activities for the Turkish Navy are ongoing simultaneously
Per Naval Insider claim, next 4 Hisar Class OPVs are to be named as followed: "Sultanhisar (P-1222/TBMC), Yarhisar (P-1223/TBMD), Demirhisar (P-1224/TBME), Sivrihisar (P-1225/TBMF)"We knew for some time Dearsan was awarded the next 4 Hisar Class OPVs
In the same vein, Aselsan signed a deal worth €210 million contract for "Electronic Warfare, Radar, Communication, Navigation, Weapon, Electro-Optic and Underwater Systems for naval platforms", with Dearsan-Desan-Özata shipyards, who I believe are responsible for this program. "Deliveries will be completed between 2025 and 2029."Per Naval Insider claim, next 4 Hisar Class OPVs are to be named as followed: "Sultanhisar (P-1222/TBMC), Yarhisar (P-1223/TBMD), Demirhisar (P-1224/TBME), Sivrihisar (P-1225/TBMF)"
All 6 names are 1/1 lifted from the 1960s Hisar Class patrol ships, and of course previous ships beforehand.
Is there a possibility that MCMV will also be included in the contract?In the same vein, Aselsan signed a deal worth €210 million contract for "Electronic Warfare, Radar, Communication, Navigation, Weapon, Electro-Optic and Underwater Systems for naval platforms", with Dearsan-Desan-Özata shipyards, who I believe are responsible for this program. "Deliveries will be completed between 2025 and 2029."
Pretty long lead time of 4 years which makes me think the 2+2 is not an option per se but there will be some years between the two deliveries. Aselsan takes the cake for most of the equipment on the ships, which comes down to 53 million dollars(52m €) per ship. Must be pretty cheap.
From what's put out I think Dearsan handles the MCMV by itself, unlike the Hisars with "Dearsan-Desan-Özata". Contract announcement would likely mention it separately.Is there a possibility that MCMV will also be included in the contract?
Akbaba claims Dearsan will build two while Desan and Özata will build one each. All in all, this brings the shipyards that have built/will build a Ada hull ship to I believe 10? TAIS, Istanbul, Istanbul Naval, RMK, Dearsan, Desan, Özata and KSEW in Pakistan. What a design.In the same vein, Aselsan signed a deal worth €210 million contract for "Electronic Warfare, Radar, Communication, Navigation, Weapon, Electro-Optic and Underwater Systems for naval platforms", with Dearsan-Desan-Özata shipyards, who I believe are responsible for this program. "Deliveries will be completed between 2025 and 2029."
Pretty long lead time of 4 years which makes me think the 2+2 is not an option per se but there will be some years between the two deliveries. Aselsan takes the cake for most of the equipment on the ships, which comes down to 53 million dollars(52m €) per ship. Must be pretty cheap.