Hopefully we start apply this package to tanks now.
I am not gonna get my hopes up until I see the upgraded tanks on the field.(I will not even bother with the test site footage as well)
The upgrade involves 280 tanks. Originally at the end of 2006 with a cost of 430 million dollars, 354 tanks were purchased from Germany. It seems the land forces sees 280 of them to be upgradeable.
There is extensive work to be done to the tanks. The armour is completely overhauled; both composite armour and new reactive explosive panels are fitted. Fire control computers and communication and security suites are added. Remote controlled auto gun and active protection Akkor, plus an electrical drive for the gun and turret are also fitted.
In other words, with all the new electronics included, short of the gun, power pack and carcass almost everything is renewed.
This is not going to be a cheap exercise. But even if it costs a third of a new Altay tank, it is still a viable endeavour.
These tanks have the 120mm L44 caliber guns like the 160 TM60 tanks. So their gun doesn‘t possess the punch, Altay’s L55 gun has. But nevertheless it is effective.
If the budgetary restraints don’t have much of an impact, the modernisation can be fast. Otherwise it can be a lengthy process. Already 40 of the 280 units had undergone the armour upgrades; and 80 more were due for the same. They all will have to undergo the complete upgrades as explained above.
These upgrades are vital. We only have 160 TM60 tanks that can be classified as modern and up to date. The rest are museum pieces.