Even if not 15, we can wait 10 years. In the meantime, I think 2033 is quite a reasonable timeframeFirst flight of Kaan was 2023, but it will not wait 15 years to become operational
Latest Thread
Even if not 15, we can wait 10 years. In the meantime, I think 2033 is quite a reasonable timeframeFirst flight of Kaan was 2023, but it will not wait 15 years to become operational
During War times like in WW2 for example.The YF22 made its first flight in 1990, was put in to service in 2003 and reached full operational readiness in 2007.
The (X)F35 made its first flight in 2000, was put in to service in 2015 and reached (full) operational readiness in 2019-2020.
The Eurofighter made its first flight in 1994, was put in to service in 2006 and reached operational readiness around the 2010 but still lagged air to ground capability.
Scaled inappropriately
It was never explicitly mentioned; but it'll be left as is tradition. 5 year old slide:Where will the gun be located.
Left/right?
Interestingly we see 2 side by side central bays here; which is interesting. Makes me think if they rejected the tandem or if it will have two huge ones; or 3 bays(2 front, one back) not counting the side ones.View attachment 79385
Are those empty spaces beneath the jet the weapon bays or something else?
And what method will be used for aerial refueling.It was never explicitly mentioned; but it'll be left as is tradition. 5 year old slide:
View attachment 79398
--
Interestingly we see 2 side by side central bays here; which is interesting. Makes me think if they rejected the tandem or if it will have two huge ones; or 3 bays(2 front, one back) not counting the side ones.
Most likely boom method like every other plane in service.And what method will be used for aerial refueling.
Boom of course. Kaan is huge, need that faster rate of transfer.And what method will be used for aerial refueling.
@Nilgiri
what is the minimum requirement an engine needs to satisfy before it's integrated with a platform? is hitting certain thrust targets enough to give the go?
Well, meeting thrust (dry and wet) alone is insufficient.
Even with raw "max" thrust met, there are operating conditions of interest (ramping A to B, sustaining at B etc.... at various ambient pressures from different altitudes/velocities etc) that have their own requirements...the ability to do this over and over etc....and the feedback design loop on the engine in end.
The engine has to have sufficient reliability from all of this impact (mean time between overhaul is just one measure, one can dry run the engine some X number of times, open it up and get an idea of working part damage accumulation etc). There may be a target here say between 1000 - 3000 flight hours. Below which the operating costs get pricey basically given the downtimes over life cycle.
Then of course things like total weight, volume etc have to be within original requirements too. These limit scope of workaround solutions that may arise etc given engines are integral in fuselage rather than mounted on wing etc.
It is very different to say commercial engines that have more forgiving + predictable operating parameters....that dont have to go supersonic in first place...after maximum efficiency through much larger bypass ratio fan etc, external mount design and so on.... and have the much longer MTBO times and economies of scale to harness as result but a new set of design pressures too (getting a corolla optimal vs a ferrari etc)
Much appreciated
can you also give us a perspective on military turbofan testing campaign? by that I mean, assume the company has designed and built the first prototype and we fired the engine the first time. Between the first firing and delivery into service, what percentage of engineering hours are spent on which phase of the testing? Is reaching the rated thrust take the bulk of the work? I asked some LLMs how much time do turbofan manufacturers take to reach the engine's thrust target and the answers were all over the place. Obviously, I ask these questions in context of TF6000 and TF35k and I know the technological readiness of TEI and the GE, RR etc. vastly different but i just wanna gain some perspective on the problem and not get lost in the never-ending speculations.