At this point, a new tank with a hybrid propulsion system, a 3-man crew, an autoloader, and an unmanned turret should be designed from scratch with an aim to start serial production in 2031. There is no need to produce Altay more than 250 units. We should upgrade every upgradable tank in our inventory, including M60s to improve quality and keep quantity at a good level. BMC can be funded with 250 Altay and tank upgrade jobs.