Hahahaha Our differencefastest fingers in the west
Latest Thread
Hahahaha Our differencefastest fingers in the west
Yok dostum Yapısal Modernizasyon sadece.AESA entegrasyonu mu yapılıyor abi?
You do not get it "AESA = Yapısal Modernizasyon".................AESA entegrasyonu mu yapılıyor abi?
This modernisation programme has been going on for months now.View attachment 42671
I swear he is onto something again
This modernisation programme has been going on for months now.
The Tusas official is especially stressing on the fact that this is a structural modernisation and not an avionic one. (Just watch the video)
Aesa and avionic upgrades necessary for the “Ozgur” modernisation will come at a later date.
Out of 35 block 30 planes, so far, they have delivered 6 . One more ready for delivery and 8 being worked on. So it is a slow process.
If this is anything to go by, to upgrade the avionics and Aesa to bring these to “Ozgur” status is going to take years.
In my eyes Aselsan has failed in two major projects; Akkor and Aesa radar.
Both projects have been ongoing for such a long time that it is embarrassing for them not have operational units ready to be fitted on to the respective platforms yet.
Making and AESA radar is not that easy.This modernisation programme has been going on for months now.
The Tusas official is especially stressing on the fact that this is a structural modernisation and not an avionic one. (Just watch the video)
Aesa and avionic upgrades necessary for the “Ozgur” modernisation will come at a later date.
Out of 35 block 30 planes, so far, they have delivered 6 . One more ready for delivery and 8 being worked on. So it is a slow process.
If this is anything to go by, to upgrade the avionics and Aesa to bring these to “Ozgur” status is going to take years.
In my eyes Aselsan has failed in two major projects; Akkor and Aesa radar.
Both projects have been ongoing for such a long time that it is embarrassing for them not have operational units ready to be fitted on to the respective platforms yet.
Making and AESA radar is not that easy.
This is not true F-16 Aesa radar phase 1 project protocol was signed on 4 December 2018 and according to protocol, it will take 48 months to deliver the first prototype so AESA integration on F-16s won't start before late 2022. Phase-2 covers the serial production of AESA radars. Also, the structural modernization rate is ~2 per month so it means it will be finished in 2023.This modernisation programme has been going on for months now.
The Tusas official is especially stressing on the fact that this is a structural modernisation and not an avionic one. (Just watch the video)
Aesa and avionic upgrades necessary for the “Ozgur” modernisation will come at a later date.
Out of 35 block 30 planes, so far, they have delivered 6 . One more ready for delivery and 8 being worked on. So it is a slow process.
If this is anything to go by, to upgrade the avionics and Aesa to bring these to “Ozgur” status is going to take years.
In my eyes Aselsan has failed in two major projects; Akkor and Aesa radar.
Both projects have been ongoing for such a long time that it is embarrassing for them not have operational units ready to be fitted on to the respective platforms yet.
Gelinen son durum itibariyle fabrika testlerine başlanması beklenen AESA radar projesi, 2018 yılı sonunda başlamış ve 48 aylık bir proje takvimi belirlenmişti. Fabrika test faaliyetlerinin 2022 yılı sonunda tamamlanması (F-16 AESA Radar) ve F-16 uçaklarına entegre edilerek kullanıma hazır hale gelmesi hedefleniyor.
It was well known even in 2011 that Turkey was planning to use home grown Aesa radar for the F16 planes. In fact I have posts by the members of this forum, published in other forums then, that by 2015 or latest by 2016, our F16 fighters would have Aselsan built Aesa radars. Then again I have just come across posts in Pakistan defence forum dated 2011 that Aselsan was working on GaN based radar modules at that date. (@Cabatli_53 ’s post in fact). Then there is this;This is not true F-16 Aesa radar phase 1 project protocol was signed on 4 December 2018 and according to protocol, it will take 48 months to deliver the first prototype so AESA integration on F-16s won't start before late 2022. Phase-2 covers the serial production of AESA radars. Also, the structural modernization rate is ~2 per month so it means it will be finished in 2023.
Milli AESA Radar Projesi'ndeki Son Gelişmeler
ASELSAN tarafından geliştirme çalışmaları süren Aktif Dizin Taramalı Radar (AESA) için geri sayım sürüyor. Milli AESA Radar, F-16 Blok 30'a entegre edilecek.www.savunmasanayist.com
For now it seems we are gonna miss the calendar by 2-3 years at leastThis is not true F-16 Aesa radar phase 1 project protocol was signed on 4 December 2018 and according to protocol, it will take 48 months to deliver the first prototype so AESA integration on F-16s won't start before late 2022. Phase-2 covers the serial production of AESA radars. Also, the structural modernization rate is ~2 per month so it means it will be finished in 2023.
Milli AESA Radar Projesi'ndeki Son Gelişmeler
ASELSAN tarafından geliştirme çalışmaları süren Aktif Dizin Taramalı Radar (AESA) için geri sayım sürüyor. Milli AESA Radar, F-16 Blok 30'a entegre edilecek.www.savunmasanayist.com
South Korea is conducting flight test for its AESA radar on Boeing 737 test aircraft operated by South Africa’s Aircraft Instrument and Electronics. So what is our plan concerning Flight tests for our AESA radar. I belive South Africa can also be a logical option for us as well.
It was sure corssing my mind, though hoping that Grumman S-2E Tracker is enouhg for testing our AESA.Perhaps such an aircraft is already being utilised.
Grumman S-2E Tracker, undenounced to anyone was one day seen with Aselsan SARPER payload. Long before anyone got wind of it.
View attachment 42994
It was sure corssing my mind, though hoping that Grumman S-2E Tracker is enouhg for testing our AESA. yet since we havent heard anything I am hoping that it should be. Ok better to be not pesimistic I guess.
Poor Hurkus Still flying in & out of TAI facilities. Only participating in certain airshows. I hope they deliver it ASAP.