Bulgaria's aid package:The question is, would Ukraine take those old IFVs?
(And the US pays for it.)
Even the rickety 6x6s in the ground forces or the gendarmerie are better than these.
Latest Thread
Bulgaria's aid package:The question is, would Ukraine take those old IFVs?
BMC, the only company within TR that redefines acquisition rules, amount or requirements of Turkish Armed Forces.Some news on KKK's own YNZMA NGAFV project.
I remember people asking why do we even modernize old ACV AFVs and APCs when YNZMA was just on the horizon. We now have our answer.
"The total requirement of the Turkish Armed Forces in the New Generation Armored Combat Vehicles project was around 1300 vehicles, but was later reduced to 360. The first batch, for which the SSİK decision is expected, is thought to be around 50. Within the scope of the YNZMA project, the tests that started in 2020 were completed around September 2023. FNSS delivered the BAFO (best and final offer) in December. There are approximately 19 vehicles in different configurations to meet the needs of the Turkish Armed Forces."
https://twitter.com/Saffet_Uyanik/status/1754141485505597895
YNZMA tests were completed on September 2023 and number of (wheeled?) vehicles were lowered from 1300 to 360. While the first batch will be 50 vehicles only. 19 different configurations are to be inducted into service. Not clear if SSİK decision is waiting for the engines or for BMC to get its shit together with Altuğ. If 360 is not the first general batch and total number, huge let down and would mean we will continue using even unmodernized ACVs well into 2030s.
My own thoughts: If tests started in 2020 and ended 5 months ago, and as BMC's engine is not yet even ready for these vehicles and cannot have been tested on Arma Pars and Altuğ, maybe first general batch will be made with foreign engines, while a bigger batch is postponed into future.
- How many do you need?
- 1000+ just get a production line ready.
- No i think you need 50.
- Ok 50.
- Also relax these requirements a little, i can not fit in.
- Ok done.
- But 50 in 5 years, don't expect soon, we got no factory nor CEO.
- Fine, whatever.
- Also T0 startes 12 months after the contract, you know we gotta take another look at this design and remake it. And imma need some incentives.
I think the vehicle represents the level of mastery that FNSS has reached in armored combat vehicles with its ongoing R&D and after-sales feedback.
Active protection system, high situational awareness, acoustic detection system, high cbrn protection and mine resistance, the highest level of mobility for an 8x8 vehicle, 800km range, auxiliary power unit, high payload capacity in the personnel compartment... FNSS had set the bar quite high with the PARS IV - 6x6 SPV, and ALPHA seems to have succeeded in becoming an 8x8 that put more on this. If FNSS adds the optional capability of crossing stagnant water and rivers, which FNSS is very experienced in, I think this vehicle could be a complete package from A to Z. Maybe a wired mini UAV option can also be added, which is not a big deal. Because this time, a full and complete product range has also emerged in the tower section:
YN-ZMA 30/40mm w/OMTAS+AKKOR turret
YN-ZMA 105/120mm turret
KORKUT low altitude air defense turret
Configuration capable of carrying medium-altitude air defense missiles
120mm double barrel Mortar turret
Combat engineering and command and control, fire control configurations.
All looks great.
We should think about giving the old APCs to Ukraine.
In addition, a mini unmanned ground vehicle that can be controlled from within this vehicle and that can disembark from the personnel ramp can also be considered as an option.If FNSS adds the optional capability of crossing stagnant water and rivers, which FNSS is very experienced in, I think this vehicle could be a complete package from A to Z. Maybe a wired mini UAV option can also be added, which is not a big deal.
He forgot adding Gürz/ Burç AD turrets.@UkroTurk I think you will see something familiar
If you're talking about the one on the right, second on from the top that is a 120mm double barrel mortar, I'm guessing that one because that is the only one with a different turret. There is no mention of a double barrel 40mm on FNSS's brochure, check the 5th page of the pdf I shared, all the configurations are also shown there.Am i seeing a twin-forty gun with a new turret there?
All of these flops sound more like sabotaging the land force on porpuse.We have been talking about this for half a decade now. There is clearly no drive by the Land Forces to aquire any of these vehicles and they seem to sulk like a child everytime they are forced to do so.
YNZMA is just the newest example. Slashing vehicles to be aquired from 2900 down to 1350 down to 360 and now 50 in the "first batch", lets be honest it will most likely stay at those numbers for the next decade, just shows this.
Modernizing the ACV-15 needed to be vetoed by the higher ups instead we wasted money on trash, yes trash, 40 year old vehicles that have no place on the modern battlefield, and whose job in COIN could easily be taken over by APCs (Kipri, Cobra, Yalcin, Vuran) with 25mm turrets and even 30mm turrets.
What are you gonna do with that 25mm peashooter against modern armored vehicles? Hell forget modern, in Ukraine both sides had difficulties penetraing decades old BTRs with their 30mm guns. Sitting ducks nothing else.
L2A4 modernization has been a total flop.
M60 modernization has been a total flop.
Altay's development has been a total flop. Really you gonna go and buy engines from the same Germans who in the first place vetoed the sale of the Leopard 2A6 to you, which you had chosen in the first place btw?
Firtina-2 production is almost non-existant because of the same problems, then they went and decided to go with american engines and then dropped that too for whatever reason.
Maybe it is time to accept that the Land Forces is just incompetent when it comes to procurement and development of projects. Maybe both the Navy and Air Force should teach them a couple things.
Because this isn't gonna get better, oh no it will only get worse.
After seeing what kamikaze drones&drones and Javelins did in Ukraine, I began to think that spending on ground vehicles, except for i) artillery rockets, ii) 155 mm howitzers and iii) armored personnel carriers, was unnecessary!
What are armored vehicles used for? They basically have 2 purposes:
1) To protect the infantry during transport and
2) To provide fire support.
What I have mentioned above is sufficient for these tasks, because drones also contribute to fire support. So, instead of spending that money on land vehicles other than the ones I mentioned above, let's spend the money on kamikaze drones&drones.
The two things are completely different. The dynamics of usage for these two things are completely different.After seeing what kamikaze drones&drones and Javelins did in Ukraine, I began to think that spending on ground vehicles, except for i) artillery rockets, ii) 155 mm howitzers and iii) armored personnel carriers, was unnecessary!
What are armored vehicles used for? They basically have 2 purposes:
1) To protect the infantry during transport and
2) To provide fire support.
What I have mentioned above is sufficient for these tasks, because drones also contribute to fire support. So, instead of spending that money on land vehicles other than the ones I mentioned above, let's spend the money on kamikaze drones&drones.
IMO, the systems you mentioned are mostly for disrupting the enemy's organization on the contested field. But in order to capture that field, you need to settle there with your personnel. You can't by just march infantry to do that.After seeing what kamikaze drones&drones and Javelins did in Ukraine, I began to think that spending on land vehicles, except for i) artillery rockets, ii) 155 mm howitzers and iii) armored personnel carriers, was unnecessary!
What are armored vehicles used for? They basically have 2 purposes:
1) To protect the infantry during transport and
2) To provide fire support.
What I have mentioned above is sufficient for these tasks, because drones also contribute to fire support. So, instead of spending that money on land vehicles other than the ones I mentioned above, let's spend the money on kamikaze drones&drones.
After seeing what kamikaze drones&drones and Javelins did in Ukraine, I began to think that spending on land vehicles, except for i) artillery rockets, ii) 155 mm howitzers and iii) armored personnel carriers, was unnecessary!
What are armored vehicles used for? They basically have 2 purposes:
1) To protect the infantry during transport and
2) To provide fire support.
What I have mentioned above is sufficient for these tasks, because drones also contribute to fire support. So, instead of spending that money on land vehicles other than the ones I mentioned above, let's spend the money on kamikaze drones&drones.
You're so wrong that it is incredible. If what you said was true, Ukraine wouldn't have been desperately seeking more tanks and IFVs, not to mention, you know, every other nation on the planet. Rock, paper, scissors of infantry, armour, anti-armour has been going on for a 100 years and it'll continue to do so but it doesn't mean it is obsolete or useless.After seeing what kamikaze drones&drones and Javelins did in Ukraine, I began to think that spending on land vehicles, except for i) artillery rockets, ii) 155 mm howitzers and iii) armored personnel carriers, was unnecessary!
What are armored vehicles used for? They basically have 2 purposes:
1) To protect the infantry during transport and
2) To provide fire support.
What I have mentioned above is sufficient for these tasks, because drones also contribute to fire support. So, instead of spending that money on land vehicles other than the ones I mentioned above, let's spend the money on kamikaze drones&drones.
Hear me out:Looks like Air Force and Navy have priority, no money left for Land Forces.
New motto of the Land Forces could be:
"Entrusted first to Allah, then again to Allah"
Where did u find those news ? the YNZMA project was to replace all Armored vihacles tracked and wheeled ones and was/is 4000+ vihacle . Perhaps u confused it with anti-tank vihacle that are some 300 produced . I think YNZMA that will replace m113 and acv 15 is waiting for national engine 600hp to 800hp power .Some news on KKK's own YNZMA NGAFV project.
I remember people asking why do we even modernize old ACV AFVs and APCs when YNZMA was just on the horizon. We now have our answer.
"The total requirement of the Turkish Armed Forces in the New Generation Armored Combat Vehicles project was around 1300 vehicles, but was later reduced to 360. The first batch, for which the SSİK decision is expected, is thought to be around 50. Within the scope of the YNZMA project, the tests that started in 2020 were completed around September 2023. FNSS delivered the BAFO (best and final offer) in December. There are approximately 19 vehicles in different configurations to meet the needs of the Turkish Armed Forces."
https://twitter.com/Saffet_Uyanik/status/1754141485505597895
YNZMA tests were completed on September 2023 and number of (wheeled?) vehicles were lowered from 1300 to 360. While the first batch will be 50 vehicles only. 19 different configurations are to be inducted into service. Not clear if SSİK decision is waiting for the engines or for BMC to get its shit together with Altuğ. If 360 is not the first general batch and total number, huge let down and would mean we will continue using even unmodernized ACVs well into 2030s.
My own thoughts: If tests started in 2020 and ended 5 months ago, and as BMC's engine is not yet even ready for these vehicles and cannot have been tested on Arma Pars and Altuğ, maybe first general batch will be made with foreign engines, while a bigger batch is postponed into future.
I don't confuse.. Saffet Uyanık twit I linked mentions it.Where did u find those news ? the YNZMA project was to replace all Armored vihacles tracked and wheeled ones and was/is 4000+ vihacle . Perhaps u confused it with anti-tank vihacle that are some 300 produced . I think YNZMA that will replace m113 and acv 15 is waiting for national engine 600hp to 800hp power .
Heavy artillery and howitzers and artillery rockets are still in the Ukrainian battlefield. Neither Ukraine nor Russia abondon these weapons.After seeing what kamikaze drones&drones and Javelins did in Ukraine, I began to think that spending on land vehicles, except for i) artillery rockets, ii) 155 mm howitzers and iii) armored personnel carriers, was unnecessary!
What are armored vehicles used for? They basically have 2 purposes:
1) To protect the infantry during transport and
2) To provide fire support.
What I have mentioned above is sufficient for these tasks, because drones also contribute to fire support. So, instead of spending that money on land vehicles other than the ones I mentioned above, let's spend the money on kamikaze drones&drones.
We have been talking about this for half a decade now. There is clearly no drive by the Land Forces to aquire any of these vehicles and they seem to sulk like a child everytime they are forced to do so.
YNZMA is just the newest example. Slashing vehicles to be aquired from 2900 down to 1350 down to 360 and now 50 in the "first batch", lets be honest it will most likely stay at those numbers for the next decade, just shows this.
Modernizing the ACV-15 needed to be vetoed by the higher ups instead we wasted money on trash, yes trash, 40 year old vehicles that have no place on the modern battlefield, and whose job in COIN could easily be taken over by APCs (Kipri, Cobra, Yalcin, Vuran) with 25mm turrets and even 30mm turrets.
What are you gonna do with that 25mm peashooter against modern armored vehicles? Hell forget modern, in Ukraine both sides had difficulties penetraing decades old BTRs with their 30mm guns. Sitting ducks nothing else.
L2A4 modernization has been a total flop.
M60 modernization has been a total flop.
Altay's development has been a total flop. Really you gonna go and buy engines from the same Germans who in the first place vetoed the sale of the Leopard 2A6 to you, which you had chosen in the first place btw?
Firtina-2 production is almost non-existant because of the same problems, then they went and decided to go with american engines and then dropped that too for whatever reason.
Maybe it is time to accept that the Land Forces is just incompetent when it comes to procurement and development of projects. Maybe both the Navy and Air Force should teach them a couple things.
Because this isn't gonna get better, oh no it will only get worse.
I wish army would just order a hundred of these in 40 mm remote controlled turret configuration to start with, while they make up their mind about what the fuck they want from an IFV, so that it can be upgraded into Alpha Mk2 later on and get it in other configurations as well. Just get something ffs.Notice the blast in the fifth second.