The source for OPV design.
see page 54-55. (In PDF 66-67)
Shouldn't bee too hard to add the source, (for the M5), people who writes these reports getting sad
Nothing has changed about the timeline either, it was planned both of the vessels to be in service by 2024, so first one logically would be delivered a little earlier.
Translation for second picture:
Ongoing projects
- I Class frigate temporary acceptance in 2023 September.
- Type 214 is going on at Gölcük Naval Shipyard
- Milden DPO is procuring software, setting up security protocols for dometic and international collaborations.
- PN Milgem Project is going on.
- OPV project's contract stage has been completed, first hull will be delivered in 2023.
- 3000 tonnes floating dry dock project contract was signed between TGM and Asfat, will be located in Gölcük Naval Shipard. (The picture on right-below in the first image)
see page 54-55. (In PDF 66-67)
Shouldn't bee too hard to add the source, (for the M5), people who writes these reports getting sad
Nothing has changed about the timeline either, it was planned both of the vessels to be in service by 2024, so first one logically would be delivered a little earlier.
Translation for second picture:
Ongoing projects
- I Class frigate temporary acceptance in 2023 September.
- Type 214 is going on at Gölcük Naval Shipyard
- Milden DPO is procuring software, setting up security protocols for dometic and international collaborations.
- PN Milgem Project is going on.
- OPV project's contract stage has been completed, first hull will be delivered in 2023.
- 3000 tonnes floating dry dock project contract was signed between TGM and Asfat, will be located in Gölcük Naval Shipard. (The picture on right-below in the first image)