Up to 36000 lb is achievable by lowering TAC from 6000h to 4300h to overhaul. If Turkey managed up to 1400 degrees Celsius by 2020, if not earlier, then 1500 degrees continuously is surely achievable by the first engine ignition.

Edit: I should say up to 34000lb with up to 36000lb with further engine enhancements
4300 hours is a respectable time, 6000 hrs is rather a novelty.
 

TheInsider

Experienced member
Professional
Messages
4,070
Solutions
1
Reactions
34 14,485
Nation of residence
Turkey
Nation of origin
Turkey
Good news KTJ-3200 turbojet engine passed the acceptance tests and gearing up for serial production. Serial production will start by the end of this year(I expect the official contract to be signed at IDEF). Integration of the KTJ-3200 to the SOM missile also goes on. Live fire tests from SOM/Atmaca missiles will be done by the end of this year and early 2022.

 

Oublious

Experienced member
The Netherlands Correspondent
Messages
2,168
Reactions
8 4,684
Nation of residence
Nethelands
Nation of origin
Turkey
So now we started with T-929, how is our enginge project doing for the T-929?:)
 

Saithan

Experienced member
Denmark Correspondent
Messages
8,643
Reactions
37 19,756
Nation of residence
Denmark
Nation of origin
Turkey
So now we started with T-929, how is our enginge project doing for the T-929?:)
I think we'll see the national engine on Gökbey and 629 projekt. I really hope we'll see it produced and used in domestic helicopters.
 

Yasar_TR

Experienced member
Staff member
Administrator
Messages
3,254
Reactions
142 16,328
Nation of residence
United Kingdom
Nation of origin
Turkey
MD of TEI, Professor Mahmut Aksit, has said that the TS1400 turbo shaft engine will be ready to fly Gokbey Helicopter in 2023.
In other words the engines they delivered are not going to be used to fly Gokbey as previously suggested. Either they are being used to evaluate the compatibility of the engines to the Gokbey or they were found to be not up to intended standards.
We seem to be amassing a lot of expectations for 2023. I hope this is not a political game.!
Also PD170 he said, will be completing it’s integration work to the Aksungur UAV. Does that mean, PD170 has been powering the Aksungur and going through integration work, or all this time Aksungur was actually flying with PD155?

So 2023 expectations:
Altay tank
TFX roll out & engine firing
I-Class frigate
TS1400 with Gokbey first flight

feel free to add !
I hope the Hurjet first flight and Piri Reis delivery to Navy scheduled for 2022 are not postponed to 2023 as well.
TCG Anadolu will probably be ready not before 2023 either. (Theoretically they must still be working on a launch and landing system for UAV’s)
 

TheInsider

Experienced member
Professional
Messages
4,070
Solutions
1
Reactions
34 14,485
Nation of residence
Turkey
Nation of origin
Turkey
It takes around 1 year of integration work when a new engine is delivered and TS-1400 has currently no certification. You cant officially fly with an engine before the engine completes its certification process. TEI delivered TS-1400 engines to the TUSAS so that TUSAS can start the integration work while TEI is busy with engine certification(takes a long time like aircraft certification). TUSAS will also do its own tests on TS-1400 similar to Baykar testing the AL-450T. Gokbey will probably fly(experimentally) with TS-1400 before 2023. In 2023 it will be fully integrated and certified to the Gokbey. TS-1400 will be mass-produced in 2024.

Aksungur project started with PD-155. In the second prototype, Tusas switched to the PD-170. A while ago the engine testing and integration works are done. Aksungur flew a lot of sorties with PD-170 for months. More than 20 PD-170 will be delivered this year. Some PD-170 will also be delivered to Baykar for some of their projects. I expect PD-170 to be used on TB3.
 

Ecderha

Experienced member
Messages
4,552
Reactions
4 7,822
Nation of residence
Bulgaria
Nation of origin
Turkey
It takes around 1 year of integration work when a new engine is delivered and TS-1400 has currently no certification. You cant officially fly with an engine before the engine completes its certification process. TEI delivered TS-1400 engines to the TUSAS so that TUSAS can start the integration work while TEI is busy with engine certification(takes a long time like aircraft certification). TUSAS will also do its own tests on TS-1400 similar to Baykar testing the AL-450T. Gokbey will probably fly(experimentally) with TS-1400 before 2023. In 2023 it will be fully integrated and certified to the Gokbey. TS-1400 will be mass-produced in 2024.

Aksungur project started with PD-155. In the second prototype, Tusas switched to the PD-170. A while ago the engine testing and integration works are done. Aksungur flew a lot of sorties with PD-170 for months. More than 20 PD-170 will be delivered this year. Some PD-170 will also be delivered to Baykar for some of their projects. I expect PD-170 to be used on TB3.

"Certification" in bref mean -> Document -> Sating that as a professional you've been prepared and meet a specific set of criteria.
As we talking about a product, then it is mean that process of building of product need to prove that it meet specific set of criteria when building it.

Example you want to SELL this product to EU or USA or JAPAN.
They want YOU to show to them that you have "Specific Certificate that they will accept" in order to sell this produt on their market ( this is one of many small tricks which west created decate ago, just make obstucales to competitors to sell products etc.).
So
This Certificate is awarded only after you've passed the proper assessments administered by a recognized third-party at moment it mean EU licensed company person/s which will have to check all process in producer place in order to sign and give certificate credential.
---------------------------------------------------------------------------------------------------------------------------------------------------------------
For Turkiye mean product is ready to be used/tested/updated. It is not idea, it is not on workship desk, it is not talking shit !

What I am trying to SAY is that TS-1400 engine WILL continue to be changed and main Customer is Turkish Army and They have own requiremets and acceptents for the product and this mean that "Certificate" we talking mean less even nothing for them at moment.

Important thing is TS-1400 as product is ready (prototype) to be integeted to Platform (helicopter) and test it.
 

TheInsider

Experienced member
Professional
Messages
4,070
Solutions
1
Reactions
34 14,485
Nation of residence
Turkey
Nation of origin
Turkey
You can't sell or fly a civilian helicopter(other than experimental purposes) without helicopter and engine certificates. EASA will assign experts and TUSAS and TEI will prove to them in live tests that their products meet certain criteria. For military uses things are easier. EASA certification process takes around 2 years so Gokbey can be delivered with LHTEC engines in 2022.
 

Yasar_TR

Experienced member
Staff member
Administrator
Messages
3,254
Reactions
142 16,328
Nation of residence
United Kingdom
Nation of origin
Turkey
These are the real Diesel engine Gurus. They specialise in Diesel engines. But mainly in Marine and railway locomotive engines. You may find that this particular engine too is for same type of end use.
But, interestingly Tulomsas has declared that they are subcontractors for the Altay Tank.
In an interview Prof. Akşit had said that there are two very accomplished Diesel engine manufacturers in Turkey that could manufacture engines from scratch: TEI and Tulomsas .
 

Test7

Experienced member
Staff member
Administrator
Messages
4,785
Reactions
19 19,937
Nation of residence
United States of America
Nation of origin
Turkey
TEI General Manager Aksit;

''51% of the T700-TEI-701D engine produced at TEI is produced locally''. All critical parts, including the combustion chamber, can be produced in the TEI. 47 (T700-TEI-701D) engines have been produced so far. We can produce 1 engine per week.

 

Bogeyman 

Experienced member
Professional
Messages
9,192
Reactions
67 31,256
Website
twitter.com
Nation of residence
Turkey
Nation of origin
Turkey

METU Machinery / METU Aeronautics / Koç University and Tei Alternative Liquid Fuels have launched the projecting of turbulent burning in the high pressure environment.

The project will probably be the first step of the Ramjet engine Gökhan Air-Air Missile.
 
Last edited:

Bogeyman 

Experienced member
Professional
Messages
9,192
Reactions
67 31,256
Website
twitter.com
Nation of residence
Turkey
Nation of origin
Turkey

METU Machinery / METU Aeronautics / Koç University and Tei Alternative Liquid Fuels have launched the projecting of turbulent burning in the high pressure environment.

The project will probably be the first step of the Ramjet Motor Gökhan Air-Air Missile.


Professor Dr. İskender Gokalp carried out the brain immigration from France to Turkey. In METU, it will establish a center of excellence related to combustion technologies. In METU, they were working on gas turbine technologies.

EkDtjQ1WAAEQFjb

EkDuEZLXcAYz4Mm
 

Stuka

Contributor
Think Tank Analyst
Messages
713
Reactions
5 4,540
Nation of residence
United Kingdom
Nation of origin
Turkey
TEI General Manager Mahmut Faruk Akşit.

> TEI has close to 3000 Employees.

> He Talks about Awards the Company has gotten.
- Best Employer in Turkey
- Best Place to work for Women in the World (According to Female Aviation Institution compared to 52 Countries)
- 29th most sought Company in Turkey for University Students (127 Universities have been polled)
- 5th Place in terms of R&D spending of Budget in Turkey (R%D 250)

> He Talks about The TEI Online School for Aircraft Engines, which they initiated this Spring for University Students.
- Over 5000 Students from 167 different Universities joined the Program.
- Awarded best in terms of Remote Education.

> Engine Development in the past 6 Months
- 5th December delivery of TS1400 is named TS3 and they finished the Twin of that Engine the TS4 and are in advanced Stage of Testing
- TJ300 World Record. 224mm Diameter 1342N (400HP) Power. Developed in 2.5 Years.
- Crystal Blades production in Collaboration with Tübitak MAM

> Future
- TEI felts the Pandemic due to Planes being on the Ground but The Orders are a great Indication that there will be a huge Increase.


 

Philips

Well-known member
Messages
359
Reactions
991
Nation of residence
Nethelands
Nation of origin
Netherlands
MoU was signed at IDEF 2019 with Caterpillar UK for the development of a powerpack made of a V12 1200hp diesel engine and Allison X1100-5A3 transmission for Firtina-II SPH. Turkey choose another company though (Ukraine?) and the new engine is to be completed this year and tested on the Firtina-II next year.
According to some sources, a contract with Ivchenko-Progress will soon be singed for cooperation in the development of the TF-X turbofan engine.

- Defence Turkey Magazine issue 108 p.56
 

Zafer

Experienced member
Messages
4,683
Reactions
7 7,389
Nation of residence
Turkey
Nation of origin
Turkey
MoU was signed at IDEF 2019 with Caterpillar UK for the development of a powerpack made of a V12 1200hp diesel engine and Allison X1100-5A3 transmission for Firtina-II SPH. Turkey choose another company though (Ukraine?) and the new engine is to be completed this year and tested on the Firtina-II next year.
According to some sources, a contract with Ivchenko-Progress will soon be singed for cooperation in the development of the TF-X turbofan engine.

- Defence Turkey Magazine issue 108 p.56
It was before the UTKU engine apparently.

Cooperation with Ivchenko-Progress means we do not want to depend on GE or RR.
 