Türkiye's first Turbofan engine being run for the very first time! One small engine, but hopefully it will pave the way for a giant leap in gas turbine technology. Congrats to SSB & TEI. Keep going. Don't stop!
Latest Thread
TF6000 was always touted as an engine for the UCAVs. Per Erdogan's remarks from last year, we know that TF6000 will be in production in 5 years. We managed the hard, now harder part starts.Also first official statement that Kızılelma will use the TF6000 made by the SSB Chief Prof Dr. Haluk Görgün.
Now officially we are a new member of another elite club Turbofan engine manufacturing nations
USA
UK
France
Russia
China
Ukraine
Turkiye
definitly Japan cannot be left out yet seems that they are infavour of a safer pathJapan cannot be left out.
Who is anyone to say anything about what a private company will do other than their sole owners. Baykar never said they will use the TF6000. It takes 5 years to make an engine but it already took several of those years.TF6000 was always touted as an engine for the UCAVs. Per Erdogan's remarks from last year, we know that TF6000 will be in production in 5 years. We managed the hard, now harder part starts.
"Mahmut Akşit said, "It takes 8-10 years to build such an engine. We started our work with the TJ300 and have now reached this level. The TF6000 was designed for Baykar's Combat Unmanned Aircraft System (MIUS). With its engine propulsion power, it has the capacity to fly the first model of MIUS at subsonic speed."Who is anyone to say anything about what a private company will do other than their sole owners. Baykar never said they will use the TF6000. It takes 5 years to make an engine but it already took several of those years.
Still no words from Baykar, like they are not involved, LOL. Baykar will be using Ukrainian engines for the foreseable future until they move on to some other engine. Not to be mistaken though I do want Baykar to use the TF6 but I will take their word over others'."Mahmut Akşit said, "It takes 8-10 years to build such an engine. We started our work with the TJ300 and have now reached this level. The TF6000 was designed for Baykar's Combat Unmanned Aircraft System (MIUS). With its engine propulsion power, it has the capacity to fly the first model of MIUS at subsonic speed."
From 2022.
TF6000 MİUS’u uçuracak – Tolga Özbek
tolgaozbek.com
Baykar can choose to use TF6000 or not, but TF6000 was made for KE and other KE sized aircraft.
May be they will be using other engines but definitely not Ukraine engine. Ukraine no longer has the ability to produce engines.Baykar will be using Ukrainian engines for the foreseable future until they move on to some other engine.
I don't think anything can come out of Bmc, and even if it does, I don't think it will be productive. I think people will be disappointed in that.I will more whining from now on. When Kaan did not fly in December, I whined, "At least you should have flown Anka-3", and he flew the next day. I whined, "Where is the TF-6000?", and 2 days later, the image of the first firing was served. So they can't stand my whining! My first target from now on is the Batu Power Pack, my friends! LOL
Still no words from Baykar, like they are not involved, LOL. Baykar will be using Ukrainian engines for the foreseable future until they move on to some other engine. Not to be mistaken though I do want Baykar to use the TF6 but I will take their word over others'.
TF6000 was always touted as an engine for the UCAVs. Per Erdogan's remarks from last year, we know that TF6000 will be in production in 5 years. We managed the hard, now harder part starts.