Shadow embargo. Delay deliveries, overprice, BS excuses, bureucracy. We've talked about it before.What is there to embargo?
Latest Thread
Shadow embargo. Delay deliveries, overprice, BS excuses, bureucracy. We've talked about it before.What is there to embargo?
Yes, but what components are foreign? We know that the ejector seat is British and the engine is American, but I thought that both the seat and the engine were already delivered already?Shadow embargo. Delay deliveries, overprice, BS excuses, bureucracy. We've talked about it before.
Yeah the trend seems to be that everyone is trying to bolster the number and readiness of existing equipment and delay long term commitments. Same is the case of NGAD and F/A - XX. Could be a bit of fear mongering from US to say hey we have F35 buy that quickly you won't have 6th gen in time etc. If an actual large scale war is seen as very likely could make sense. KAAN is something we needed yesterday and we are trying to make 20 by 2028 for a reason, but we are already in a war and anticipating at least 3 more wars.Is the UK Burying 6th Generation Fighter Jet Project Tempest?
Labour’s tough defence choice: submarines or next-generation fighter jet? https://www.thetimes.com/uk/defence/article/labours-tough-defence-choice-submarines-or-next-generation-fighter-s6kdmqht8 @TR_123456 @Kaan Azman @Kartal1 @OPTIMUS @TheInsider @Zafer @Anmdt @Merzifonlu @Nilgiri @Test7...defencehub.live
I see the cancellation of long-term and expensive 6th generation aircraft projects by the British and the US as preparations for World War III. Because the war budget is not unlimited and the balance-changing platforms, especially, require high-volume production.
So, shape your expectations about the project schedule accordingly, people. Because we do not have the luxury of canceling Kaan.
At the end of the day, Turkey will have to decide whether to assemble the F-16 from scratch with parts from the US or to add Kaan to the inventory as Block-10. If you are going to prepare for a world war, you cannot make plans and schedules targeting the 2035s.Yeah the trend seems to be that everyone is trying to bolster the number and readiness of existing equipment and delay long term commitments. Same is the case of NGAD and F/A - XX. Could be a bit of fear mongering from US to say hey we have F35 buy that quickly you won't have 6th gen in time etc. If an actual large scale war is seen as very likely could make sense. KAAN is something we needed yesterday and we are trying to make 20 by 2028 for a reason, but we are already in a war and anticipating at least 3 more wars.
I mean we are going for every possible thing, Özgür + Eurofighter + Block 70 + KAAN and if they give F35 we would take that as well, like, not either or, but all of them.At the end of the day, Turkey will have to decide whether to assemble the F-16 from scratch with parts from the US or to add Kaan to the inventory as Block-10. If you are going to prepare for a world war, you cannot make plans and schedules targeting the 2035s.
We urgently need to clarify our expectations regarding Kaan and see whether we will switch to a war economy.
On defence turkey latest edt İ.S. says 4 hürjet deliveries to TurAF first than they give back to tusaşAltay 2 loading…
Hurjet other prototypes non exist, this one is even worse
Slightly off topic, but the Tempest program is in limbo. The new UK government refuses to commit to it. Apparently they want the military to either select nuclear submarines or the Tempest.
Thanks very interesting and another delicate issue I guessIt's mentioned that the delays are due to supply chain disruptions regarding the titanium parts. Probably it's the same reason for Temel Kotil's departure concerning the falsified authenticity documentation that originated from a metals supplier in China which were used in Airbus and Boeing parts also. Still not clear though where the problem lies, with Italian firm Titanium International Group, with Spirit, TUSAŞ or with the Chinese Baoji Titanium Industry?!
The ejection seat and engine are subsystem level. There are a lot of foreign-sourced items at the component level.Yes, but what components are foreign? We know that the ejector seat is British and the engine is American, but I thought that both the seat and the engine were already delivered already?
Indigenous engine partnership will be formalized in weeks (TrMotor, TEI, IvchenkoP)
Who makes the problem, which company/county?
I think that the Tempest project is still in definition phase. A decision on going ahead with Tempest is not due until 2025.Is the UK Burying 6th Generation Fighter Jet Project Tempest?
Labour’s tough defence choice: submarines or next-generation fighter jet? https://www.thetimes.com/uk/defence/article/labours-tough-defence-choice-submarines-or-next-generation-fighter-s6kdmqht8 @TR_123456 @Kaan Azman @Kartal1 @OPTIMUS @TheInsider @Zafer @Anmdt @Merzifonlu @Nilgiri @Test7...defencehub.live
I see the cancellation of long-term and expensive 6th generation aircraft projects by the British and the US as preparations for World War III. Because the war budget is not unlimited and the balance-changing platforms, especially, require high-volume production.
So, shape your expectations about the project schedule accordingly, people. Because we do not have the luxury of canceling Kaan.