The day Türkiye has Nukes with ICBMs and their own fighter jets should be the day that america gets kicked out of Türkiye. These bastards are anything but allies.
Latest Thread
If enough time and energy is spent on conversion they can be used.Here in this interview on Kaner’s channel, around 11:45 mark, Özgür Ekşi says that he once asked military technicians in Eskisehir if the F-110 engines in F-16s can be used in dual engine mode for Kaan and they answered they can easily make it work. It was sometimes said here this is not technically possible due to FADEC software and turning direction of the engines but it seems to be technically very feasible. Other obvious problems like legal licensing and F-16 availability notwithstanding of course.
What the guys at TUSAS meant is that serial production of KAAN with the national engine will begin in 2032/2033 which is something all of us knew from the beginning of the yearit feels weird to share the words of opposition leader as a source but he says he was told at TUSAŞ that KAAN will fly with indigenous engines in 2032-2033.
Give it a watch. he pretty much nailed it. some factions of CHP are pretty dumb and have an inferiority complex that runs deep when it comes to national projects. This perspective was a breath of fresh air which I hope could cure some of his followers.
To my recollection, i have never seen any info on TF35000's first firing or the start of a prototype building. What we were told is that some early tests will be conducted in 2026. That doesn't mean a prototype. It will be a test article for early testing before committing to a prototype. So it's a part of the engine that will be tested on a specialized rig. It could belong to the compressor, combustion chamber, turbine section and what not.What the guys at TUSAS meant is that serial production of KAAN with the national engine will begin in 2032/2033 which is something all of us knew from the beginning of the year
From what I remember, KAAN's first engine firing by TEI/TR Motor will be in 2026 and after 2-3 years of testing (depending on results), the engine will be incorporated into KAAN during the end of 2028/2029 for more testing till 2032/2033 (depending on test results) followed by serial production
The timeline remains unchanged.
If things work out IMO KAAN will have very good sales prospects when it becomes available with TF35000. Su-75 looks like it will never progress past being a dream. If KF-21 is still stuck with GE F414 in ten years' time, the US will have a veto on who buys it. Same for AMCA, which is unlikely to have a non-US engine until around 2040 IMO.To my recollection, i have never seen any info on TF35000's first firing or the start of a prototype building. What we were told is that some early tests will be conducted in 2026. That doesn't mean a prototype. It will be a test article for early testing before committing to a prototype. So it's a part of the engine that will be tested on a specialized rig. It could belong to the compressor, combustion chamber, turbine section and what not.
When they start to build the prototype, it will take 1.5-2 years before it's completed and perform its first firing. We will be shown its full-scale mock-up before the prototype. But that requires an advanced stage in development. The program is still in preliminary-design phase. I for one would feel ecstatic if they could fire the engine first time by 2028.
How tho.The day Türkiye has Nukes with ICBMs
As we can see around us in the world, intentional agreements and contracts means a fack! Worthless like the paper on they were written.How tho.
There will lots of pressure and sanctions in the process and currently Turkiye is a member of NPT.
Yeah they work only if they benefit us and Israel. Since Türkiye getting nukes will work for Israel and us treaties, sanctions will be put onto effect including the last letter.As we can see around us in the world, intentional agreements and contracts means a fack! Worthless like the paper on they were written.
Kaan may fly with indigenous engines in 2032-2033 for test purpose, similar to other countries' tests, 1 f110 + f1 tf35k, but that does not mean those engines will be ready at 2032-2033.it feels weird to share the words of opposition leader as a source but he says he was told at TUSAŞ that KAAN will fly with indigenous engines in 2032-2033.
Give it a watch. he pretty much nailed it. some factions of CHP are pretty dumb and have an inferiority complex that runs deep when it comes to national projects. This perspective was a breath of fresh air which I hope could cure some of his followers.
Yes, some people act like the 2028/29 date is the date of full maturation and incorporation into a block of Kaans. 2028/29 is the date for incorporation into a Kaan for further testing and maturation, which is still an ambitious timeline for such a project but it has been hinted at that the engine itself will also be a work in progress in terms of technologies and generational capacity, hence the first iteration will probably be more akin to a F110 than to a F135, a factor which would make the timeline more plausible. Even then I think it will be delayed to 2031, with full maturation coming sometime in the second half of 2030s.What the guys at TUSAS meant is that serial production of KAAN with the national engine will begin in 2032/2033 which is something all of us knew from the beginning of the year
From what I remember, KAAN's first engine firing by TEI/TR Motor will be in 2026 and after 2-3 years of testing (depending on results), the engine will be incorporated into KAAN during the end of 2028/2029 for more testing till 2032/2033 (depending on test results) followed by serial production
The timeline remains unchanged.
I'm not an expert, but I would suggest the same.Is it feasible to use the Tf35000 engine in the initial blocks of Kaan before it’s fully matured? Some Twitter experts(!) suggest that once the engine reaches 2/3 of its power, it could already fly the Kaan.
The deal/license for f404 is already approved(at least for unarmed versions of Hurjet)All of u are talking about KAAN engine which we are developing it , it can take 10 years from now to fully mature (2035) but i want answers about what will happen wşth f404 of hurjets & Lm 2500 of warships ?
I think the Chinese might be doing something like this with WS-15, for all we know. It's funny though that they announced the engine is ready back in 2006 and it still hasn't been fully integrated.I'm not an expert, but I would suggest the same.
My reference for this is Prof. Akşit's statement about the TF-6000: "Our TF-6000 engine has already achieved 3800 lbf of thrust. It is even capable of being used in its current state during an emergency." This means that engines like the TF-6000 can quickly reach two-thirds of their targeted thrust level and can even be used in this state in an emergency.
If this can happen with the TF-6000 engine, why not with the TF35000 engine?
In this case, there are two possibilities: Either the WS-15 wasn't ready in 2006 and they lied to everyone, or they're so incompetent that they haven't yet been able to get the engine to the thrust level they're aiming for.I think the Chinese might be doing something like this with WS-15, for all we know. It's funny though that they announced the engine is ready back in 2006 and it still hasn't been fully integrated.
Ah, i don't know from where to start to explain, let's start.I'm not an expert, but I would suggest the same.
My reference for this is Prof. Akşit's statement about the TF-6000: "Our TF-6000 engine has already achieved 3800 lbf of thrust. It is even capable of being used in its current state during an emergency." This means that engines like the TF-6000 can quickly reach two-thirds of their targeted thrust level and can even be used in this state in an emergency.
If this can happen with the TF-6000 engine, why not with the TF35000 engine?