I don’t like the ffbnw concept. OPV should come with NLOS armament and short range air defense systems as long as TN is commanding the vessels.View attachment 50644
ADKG , Turkish OPVs Hisar Class ships being built by ASFAT are going to have Hisar -O air defence missiles. These are derived from Ada Class corvettes. Due to modular construction of the ship all sensors and weapons that are meant for these ships will be easily added if and when the need arise. Under normal conditions these ships will have a contingent of limited weapon load.
ASFAT'ın ADKG'lerini HİSAR-O hava savunma füzeleri koruyacak!
ASFAT tarafından inşa edilen Açık Deniz Karakol Gemilerine HİSAR-O hava savunma füzeleri entegre edilecek.www.defenceturk.net
Does that mean the project timeline is revised from 2025 to 2023 ?Mr Akar: "Within the scope of the National Submarine (MILDEN) Project, the first welding of our first national submarine will be made in 2023."
Wow thats faster than i expected , before Tf2000 ! Does this mean STM 500 , and Milden both will be under construction in 2023?Mr Akar: "Within the scope of the National Submarine (MILDEN) Project, the first welding of our first national submarine will be made in 2023."
Isnt Milden and STM 500 the same product or are they different?Mr Akar: "Within the scope of the National Submarine (MILDEN) Project, the first welding of our first national submarine will be made in 2023."
We should make it clear to audience that Milden still hasn't passed to contract design that will be followed by production design stage. Also tunnel tests of Milden and its propeller are not conducted yet (also to be followed by several other tests on scaled model). This is more of a ceremonial steel-cut likely related to budgetary measures or some other issue that we have also seen with I-Class and AKDG.Mr Akar: "Within the scope of the National Submarine (MILDEN) Project, the first welding of our first national submarine will be made in 2023."
They are different. Milden is a 3 000 tonnes class aip submarine.Isnt Milden and STM 500 the same product or are they different?
2700 Tones precisely.They are different. Milden is a 3 000 tonnes class aip submarine.
To be evolved into 3000 or even more in the following batch(es)2700 Tones precisely.
Don't let it go unnoticed, AKDG is using "megablock" approach. The blocks are built as a whole and equipped with pipes etc in a warehouse in 3 x 85 tonnes, merged in warehouse and placed on dock - slipway at once. Another step achieved for TF2000.Watch 282's launching ceremony closely, you might see a wild MKEK 76 on F-515.
Has the contract for building 3x I-class simultaneously been signed?Don't let it go unnoticed, AKDG is using "megablock" approach. The blocks are built as a whole and equipped with pipes etc in a warehouse in 3 x 85 tonnes. and placed on dock at once. Another step achieved for TF2000.
Deliver is at July 2023, the ship's construction has gained full speed in May-June, which takes AKDGs construction time, in plain configuration, down to 13-15 months.
Waiting for SSIK.Has the contract for building 3x I-class simultaneously been signed?