TR Naval Programs

zio

Well-known member
Messages
392
Reactions
7 540
Nation of residence
Turkey
Nation of origin
Turkey
The place of hisar missiles is not good in terms of safety,we have learned about ukranian war,safety is more important than the teeth of the ship
 

Saithan

Experienced member
Denmark Correspondent
Messages
8,634
Reactions
37 19,746
Nation of residence
Denmark
Nation of origin
Turkey
View attachment 50644
ADKG , Turkish OPVs Hisar Class ships being built by ASFAT are going to have Hisar -O air defence missiles. These are derived from Ada Class corvettes. Due to modular construction of the ship all sensors and weapons that are meant for these ships will be easily added if and when the need arise. Under normal conditions these ships will have a contingent of limited weapon load.
I don’t like the ffbnw concept. OPV should come with NLOS armament and short range air defense systems as long as TN is commanding the vessels.
 

Cabatli_TR

Experienced member
Staff member
Administrator
Messages
5,360
Reactions
81 45,455
Nation of residence
Turkey
Nation of origin
Turkey
Mr Akar: "Within the scope of the National Submarine (MILDEN) Project, the first welding of our first national submarine will be made in 2023."
 

Cabatli_TR

Experienced member
Staff member
Administrator
Messages
5,360
Reactions
81 45,455
Nation of residence
Turkey
Nation of origin
Turkey
Mr Hulusi Akar: "The 5th Ship of the MİLGEM Project is expected to be delivered to TN in September 2023, the Offshore Patrol Ships AKHİSAR in June 2024 and KOÇHİSAR in October 2024"
 

Afif

Experienced member
Moderator
Bangladesh Correspondent
DefenceHub Diplomat
Bangladesh Moderator
Messages
4,754
Reactions
94 9,092
Nation of residence
Bangladesh
Nation of origin
Bangladesh
Mr Akar: "Within the scope of the National Submarine (MILDEN) Project, the first welding of our first national submarine will be made in 2023."
Does that mean the project timeline is revised from 2025 to 2023 ?
Because iirc, Mr. Erdogan previously announced that, the MILDEN contraction will begin in 2025.
 

BalkanTurk90

Contributor
Messages
658
Reactions
5 1,028
Nation of residence
Albania
Nation of origin
Turkey
Mr Akar: "Within the scope of the National Submarine (MILDEN) Project, the first welding of our first national submarine will be made in 2023."
Wow thats faster than i expected , before Tf2000 ! Does this mean STM 500 , and Milden both will be under construction in 2023?
 

Lool

Experienced member
DefenceHub Diplomat
Messages
2,920
Reactions
14 5,032
Nation of residence
Albania
Nation of origin
Albania
Mr Akar: "Within the scope of the National Submarine (MILDEN) Project, the first welding of our first national submarine will be made in 2023."
Isnt Milden and STM 500 the same product or are they different?
 

Anmdt

Experienced member
Naval Specialist
Professional
Messages
5,503
Solutions
2
Reactions
118 24,896
Nation of residence
Turkey
Nation of origin
Turkey
Mr Akar: "Within the scope of the National Submarine (MILDEN) Project, the first welding of our first national submarine will be made in 2023."
We should make it clear to audience that Milden still hasn't passed to contract design that will be followed by production design stage. Also tunnel tests of Milden and its propeller are not conducted yet (also to be followed by several other tests on scaled model). This is more of a ceremonial steel-cut likely related to budgetary measures or some other issue that we have also seen with I-Class and AKDG.
 

TheInsider

Experienced member
Professional
Messages
4,066
Solutions
1
Reactions
34 14,482
Nation of residence
Turkey
Nation of origin
Turkey
He said 2023. It might be December 2023, don't expect anything soon. Normally the first boat of a submarine class usually takes at least 5 years also take that into consideration. In two years TN will add 1 frigate, 2 corvettes, and 2 submarines to its inventory.
 

Anmdt

Experienced member
Naval Specialist
Professional
Messages
5,503
Solutions
2
Reactions
118 24,896
Nation of residence
Turkey
Nation of origin
Turkey
Watch 282's launching ceremony closely, you might see a wild MKEK 76 on F-515.
 

zio

Well-known member
Messages
392
Reactions
7 540
Nation of residence
Turkey
Nation of origin
Turkey
i class
 

Attachments

  • 3D378AA5-C4CD-46CE-9271-8CA993BF929C.jpeg
    3D378AA5-C4CD-46CE-9271-8CA993BF929C.jpeg
    367.5 KB · Views: 174

Anmdt

Experienced member
Naval Specialist
Professional
Messages
5,503
Solutions
2
Reactions
118 24,896
Nation of residence
Turkey
Nation of origin
Turkey
Watch 282's launching ceremony closely, you might see a wild MKEK 76 on F-515.
Don't let it go unnoticed, AKDG is using "megablock" approach. The blocks are built as a whole and equipped with pipes etc in a warehouse in 3 x 85 tonnes, merged in warehouse and placed on dock - slipway at once. Another step achieved for TF2000.

Deliver is at July 2023, the ship's construction has gained full speed in May-June, which takes AKDGs construction time, in plain configuration, down to 13-15 months*

*This also means, remaining 8 will be available sooner than we expected.
 
Last edited:

Agha Sher

Experienced member
DefenceHub Diplomat
Messages
2,755
Reactions
11 9,303
Nation of residence
Denmark
Nation of origin
Afghanistan
Don't let it go unnoticed, AKDG is using "megablock" approach. The blocks are built as a whole and equipped with pipes etc in a warehouse in 3 x 85 tonnes. and placed on dock at once. Another step achieved for TF2000.

Deliver is at July 2023, the ship's construction has gained full speed in May-June, which takes AKDGs construction time, in plain configuration, down to 13-15 months.
Has the contract for building 3x I-class simultaneously been signed?
 

Follow us on social media

Top Bottom