Latest Thread
So and now somebody tell me again why do we need the Eurofighter???
If Kaan is to be delivered in 2028, than Why the f. do we need Eurofighter? Are we extreme rich and masochists?
Because we need the fighter jets today and not tomorrow.So and now somebody tell me again why do we need the Eurofighter???
If Kaan is to be delivered in 2028, than Why the f. do we need Eurofighter? Are we extreme rich and masochists?
Either they tell us a lot of BS, expecting big delays in the Kaan project or something. Having Kaan delivered in 2028 and purchasing Eurofighter is non sensical
We talk about Kaan delivery in 3 years, Eurofighter is unlikely to be delivered earlier
Its also called not putting all your eggs in one basket.Because we need the fighter jets today and not tomorrow.
The Turkish air force is currently alarming. While there used to be 200+ F4 phantoms and 200+ F-16s, now this number is:So and now somebody tell me again why do we need the Eurofighter???
If Kaan is to be delivered in 2028, than Why the f. do we need Eurofighter? Are we extreme rich and masochists?
Either they tell us a lot of BS, expecting big delays in the Kaan project or something. Having Kaan delivered in 2028 and purchasing Eurofighter is non sensical
We talk about Kaan delivery in 3 years, Eurofighter is unlikely to be delivered earlier
Maybe you are right, but sometimes you need to burn some money in order to get what you really want, so if we end up buying 40 EF in order to get the license production of F110, then that is what we need to do. At least we'll end up with a platform that can be used until 2045-2050 in case our other plans don't deliver on time.Thank you all for the answers. These are your answers:
1) Kaan will replace F16s. Eurofighter will replace F4s.
2) what is the earliest KAAN could reach FOC with the Turkish air force?
3) Because we need the fighter jets today and not tomorrow.
4) Its also called not putting all your eggs in one basket.
5) The Turkish air force is currently alarming. While there used to be 200+ F4 phantoms and 200+ F-16s, now this number is: 235 F-16s, 30+ became F-4
5 different opinions and I can add also my own opinion: The Eurofighter purchase is not definitive yet, nothing signed yet. So if I try to make sense out of it (my own opinion) Turkiye is probably trying to get a deal / license to build F110 engines. If the US does not guarantee the sale of F110 than the spare option is to buy Eurofighter and deliveries of Kaan with indigenous engine will become beyond 2030. This is how I read the situation.
As we can see, none of us know the real situation why we need the Eurofighter, everyone is trying to formulate a logical sense out of it. All viable reasonings, yet again all of them our own interpretations.
I wished SSB and our air force provided their reason. It is so flimsy when they say we need them without reasoning why, while we work hard on our own 5th generation fighter jet. I see this as sabotaging our own program .
I use the hard verdict of sabotage, cos this is the reality for or situation. We already buy 40 new F16's, add also 40 Eurofighters it makes 80 foreign aircraft which means 80 Kaan fighters less.
We do not have unlimited petro dolars like S. Arabia, if we purchase foreign jets that will translate into sacrificing in the numbers of Kaan that we will purchase. There needs to be a damn good reason to explain why we go for foreign jets instead our own product.
I hope I did not bother you too much, my aim is to provoke a real deep thought on purchasing foreign jets and the consequences of it for our own fighter program
We were first contemplating eurofighter as an alternative, but UK and other didn't like being the backup and told us to make up our minds basically. And force saw a risk so they decided the urgency for more fighters justifies the eurofighter purchase. The timeline for when kaan will be operational and available in large numbers is still not known and not before 2030s by best estimate. We arent getting 20 kaan by 2028 like previously said, we could get 40 eurofighters before 2030 though very likelyThank you all for the answers. These are your answers:
1) Kaan will replace F16s. Eurofighter will replace F4s.
2) what is the earliest KAAN could reach FOC with the Turkish air force?
3) Because we need the fighter jets today and not tomorrow.
4) Its also called not putting all your eggs in one basket.
5) The Turkish air force is currently alarming. While there used to be 200+ F4 phantoms and 200+ F-16s, now this number is: 235 F-16s, 30+ became F-4
5 different opinions and I can add also my own opinion: The Eurofighter purchase is not definitive yet, nothing signed yet. So if I try to make sense out of it (my own opinion) Turkiye is probably trying to get a deal / license to build F110 engines. If the US does not guarantee the sale of F110 than the spare option is to buy Eurofighter and deliveries of Kaan with indigenous engine will become beyond 2030. This is how I read the situation.
As we can see, none of us know the real situation why we need the Eurofighter, everyone is trying to formulate a logical sense out of it. All viable reasonings, yet again all of them our own interpretations.
I wished SSB and our air force provided their reason. It is so flimsy when they say we need them without reasoning why, while we work hard on our own 5th generation fighter jet. I see this as sabotaging our own program .
I use the hard verdict of sabotage, cos this is the reality for or situation. We already buy 40 new F16's, add also 40 Eurofighters it makes 80 foreign aircraft which means 80 Kaan fighters less.
We do not have unlimited petro dolars like S. Arabia, if we purchase foreign jets that will translate into sacrificing in the numbers of Kaan that we will purchase. There needs to be a damn good reason to explain why we go for foreign jets instead our own product.
I hope I did not bother you too much, my aim is to provoke a real deep thought on purchasing foreign jets and the consequences of it for our own fighter program
4) Its also called not putting all your eggs in one basket.
5) The Turkish air force is currently alarming. While there used to be 200+ F4 phantoms and 200+ F-16s, now this number is: 235 F-16s, 30+ became F-4
Only countries on the planet that are strictly switching 5th gen jets are the ones that have smaller air forces that do not need workhorses because someone else will do the dirty work for them. US, China and Russia all still buying 4th gen jets and upgrading the already existing ones. France, Germany, UK, Italy, Spain, Israel are all buying 4th gen planes as well.
5th gen planes are expensive and resource intensive to produce, expensive to maintain and expensive to fly. It makes absolutely 0 sense to unnecessarily use them in missions where a 5th gen wouldn't be required to participate. Hence, we are still upgrading our F-16s and hoping to buy more F-16s and EFs.
If Turkiye does order Eurofighter, can F-110 KAAN orders be lowered so that more TF35000 KAAN can be produced at a later date?... it's highly unlikely that we will procure 250 Kaans like stated multiple times here, simply because it will be too expensive to buy and maintain. My prediction is that when Kaan finaly enters LRIP, they will drastically reduce the procurement number. For most of our sorties, the armed forces will rely on drones and 4.5th gen fighters.
IMHO, the production rate of KAAN will be nowhere near that number in this decade. It would actually be a huge surprise for me if we managed to produce 20 KAANs a year, before 2032.While I appreciate that steps may have been taken for production of 20 a year from 2028/2029, reducing that number should reduce pressure on TAI and suppliers.
Pulling up the production rate is quite possible. Tomtas factory can take over a lot of production like helicopter and Hurkus / Hurjet prodcution and free up capacity at TAIIMHO, the production rate of KAAN will be nowhere near that number in this decade. It would actually be a huge surprise for me if we managed to produce 20 KAANs a year before 2032.
Factory floor is not what I'm concerned about. KAAN has shitload of locally-designed and manufactured parts. Serially producing the aircraft will equate to serially producing all the subsystems as well. The production can only move as fast as the slowest part of the supply chain. Unfortunately these subsystems are in development stage themselves. Their design will have to mature and then a production system has to be designed and implemented. There is bound to be issues in producing some parts. It will be a bumpy road and certainly won't be as easy as it was planned in the first place.Pulling up the production rate is quite possible. Tomtas factory can take over a lot of production like helicopter and Hurkus / Hurjet prodcution and free up capacity at TAI
If Turkiye does order Eurofighter, can F-110 KAAN orders be lowered so that more TF35000 KAAN can be produced at a later date?
While I appreciate that steps may have been taken for production of 20 a year from 2028/2029, reducing that number should reduce pressure on TAI and suppliers.