KhanOfEurasia
Contributor
- Messages
- 552
- Nation of residence
-
- Nation of origin
-
I think later Variants of the Engine will get TVC.
Latest Thread
We do not know that Baykar is working on the Turbofan Engine, the only information we know is that it has purchased the furnace used in engine production.If baykar is already making their own KE engine maybe it was wiser to prioritize 6000 for ANKA 3 instead? Baykar doesn't seem too enthusiastic about using Tf 10000 or cooperating with TEI honestly
If baykar is already making their own KE engine maybe it was wiser to prioritize 6000 for ANKA 3 instead? Baykar doesn't seem too enthusiastic about using Tf 10000 or cooperating with TEI honestly
I think Baykar could be developing their own Turbofan engines for the following reasons:We do not know that Baykar is working on the Turbofan Engine, the only information we know is that it has purchased the furnace used in engine production.
TF6000 has to be ready for TF10000. In a play on words, he said that our priority is the KIZILELMA engine.
What Baykar wants is to deliver the engine quickly and respond to orders with mass production.
If baykar is already making their own KE engine maybe it was wiser to prioritize 6000 for ANKA 3 instead? Baykar doesn't seem too enthusiastic about using Tf 10000 or cooperating with TEI honestly
We do not know that Baykar is working on the Turbofan Engine, the only information we know is that it has purchased the furnace used in engine production.
TF6000 has to be ready for TF10000. In a play on words, he said that our priority is the KIZILELMA engine.
What Baykar wants is to deliver the engine quickly and respond to orders with mass production.
Interesting information indeed, afaik he is the first and only one who mentions it.
"Well, from now on, Baykar will continue its investments in engines, and the next target is the design of an engine with high thrust power, capable of providing around 20,000 pounds of thrust, as used in Hürjet. Baykar is continuing its investments in this area. The aim here is to ensure that this engine can be used in the new versions of Kızılelma. Baykar is truly ambitious in this regard."
This doesn't mean that, but it could be a possibility in far future.so Hurjet will also get a domestic engine if need be.
"if need be"This doesn't mean that, but it could be a possibility in far future.
Depends, Baykar was planning a twin engine version of KE, they may changed their minds to single engine KE with 20k lbf thrustPerhaps once the f16 get out of service in 2040 we will have twin engine Hürjet kinda like Turkish f18 as the low cost option aside from kaan Eurofighter and perhaps f35
Also wouldn’t 20 000 pounds be overkill for Kizilelma
Triggered much?TF6000 is not even made yet we have been trying to get TS1400 into production for years but somehow we are going make bigger TF6000 and It will be better than the US or European engines
We are not "trying" to put TS1400 into production. If anything, production and testing schedule is going pretty nicely.TF6000 is not even made yet we have been trying to get TS1400 into production for years but somehow we are going make bigger TF6000 and It will be better than the US or European engines
You are missing the TF35000 engine which is supposed to be the pinnacle of Turkish engineering, only two years or so to first ignition.TF6000 is not even made yet we have been trying to get TS1400 into production for years but somehow we are going make bigger TF6000 and It will be better than the US or European engines
TF6000 is not even made yet we have been trying to get TS1400 into production for years but somehow we are going make bigger TF6000 and It will be better than the US or European engines
You are both missing important points.You are missing the TF35000 engine which is supposed to be the pinnacle of Turkish engineering, only two years or so to first ignition.
Mr. Akşit said some detail design work and some detail calculations are still ongoing. However the parts that design works have been completed for should be in the process of manufacturing already. How long the manufacturing will take is guesswork at best. My guess is we can hear some roaring in 18 months.You are both missing important points.
@Bilge adam reis ,
1. TF6000 has already been fired. It has been tested over 100 times. It has been pulled apart and reassembled and fired again.
2. An engine like TF6000, at it’s first firing, would probably give a thrust of 55-65% of aimed final thrust. But having done the tests and corrected the engine, Prof Aksit said they have attained a thrust level of more than the aimed figure.
3. So your claim of TF6000 not being “made” is not correct. It is almost there to be used. But needs maturing a bit more. Same goes for the TS1400. Infact this engine is ready to use if it can be certified.
4. No one from TEI is claiming that the 35000lbf thrust engine would be better than a US or European engine. What is said is that this engine is going to be one of the most technologically advanced engines in the world.
5. If you questioned the timeline involved in KAAN’s engine, that would be a valid argument. When we haven’t even got a fully working turbofan in hand, to expect such an advanced engine to be in working condition so soon. That needs some doing.
@Zafer ,
Point 5 applies to you too.
According to the information released, the engine for KAAN is ready in digital domain. But it needs to be physically built as a prototype. From what Prof Aksit was saying, they are at the prototype building stage now.
That means within a year we should have the first firing if no predicaments are encountered ; like the West blocking sale of some simple pump.
But then it needs a lot of time to mature.
If our memory serves, we should remember that Prof Aksit was quite verbal about being able to manufacture an engine like F119 which is off the sale list of US built engines.
So that is the engine performance levels we are aiming for. To achieve that with the addition of more modern technologies incorporated, will be a real feat of achievement for TEI.
Also let us not forget that Prof Aksit had pointed out that we need a good 10+ years and more like 13-14 years to have an engine like F119.
Unfortunately we have no other option but to produce this engine like yesterday. Even if it means it is underpowered or underperforming to start with. But it has to be built.