Semper Supra
Well-known member
It is a highly speculative assumption because the project is still in early stages and saying that we will mount 105/120mm turrets is unconfirmed
Latest Thread
It is a highly speculative assumption because the project is still in early stages and saying that we will mount 105/120mm turrets is unconfirmed
This has to do with their personal profit now the general benefit which reduces their credibility , the only air defense we're contracting is the SPYDER according to DefensaThere is no doubt that more strategic agreements will be concluded, as stated by the Moroccan ambassador to India. However, I do not post information in this thread that is not confirmed or has any backing without strong sources. Lately, a lot of Moroccan media channels have been publishing a lot of "confusing" news that has no basis.