Few months.How long have we been designing (initial to production design) the MUGEM?
I have described it as far as i could in earlier posts,Maybe symbolic ceremonies to mark the concrete start of projects? Could they be test blocks? Or maybe the production of some blocks was started before the detailed design was completed? Or, more optimistically, the information given to the press about the stages of the projects was not synchronized with the progress actually made. I am sure ANMDT üstad will enlighten us in detail on these issues.
But What I would like to draw attention to is the fact that our Naval Forces Command has reached the infrastructure and technical conditions to start the construction of three strategic platforms at the same time with its own infrastructure, which all 3 vessels are flagships in their class with a total displacement of more than 75 thousand tons. Turkish naval industry promise a very different future. This will potentially shape the international image of the Turkish state, its political power, also the nation's view of maritime affairs and many other factors from the roots.
edit: A list of naval ships currently production activities for the Turkish Navy are ongoing simultaneously
Milden has a long way ahead with a core team working on it, consider first Milden as a research and capability gain project, a long but necessary road for us all. It needs improvements in research infrastructure, a lot of pressure on Aselsan, Roketsan and other Small enterprises who will be working on refined systems and components relating to the submarine. Steel cutting and welding means that the government finally shares enthusiasm of the team (Milden DPO) and taking it to next level in procurement, budget allocation and project management.
Same applies for TF-2000.
While MUGEM is merely a political tool as of now.