TR Naval Programs

dBSPL

Experienced member
Think Tank Analyst
DefenceHub Ambassador
Messages
2,296
Reactions
96 11,840
Nation of residence
Turkey
Nation of origin
Turkey
According to savunmasanayist names of the 3 i class frigates are
F516 TCG İZMİR
F517 TCG İZMİT
F518 TCG İÇEL
In the corner of trivia today:

Izmit is actually the name of the central district of Kocaeli. Kocaeli provincial borders include the districts that are extensions of Istanbul, but it is the industrial zones and factories that make the province whole. Kocaeli actually means Izmit, but the provincial borders also include administrative units that are satellite districts of different provinces such as Istanbul.

İçel is not actually the name of a province. In 2002, a law changed the name of the province of İçel to "Mersin" and the name "İçel" has been completely out of use since then. With a 2008 law, the first tier municipalities in metropolitan cities were abolished and transformed into district municipalities. Until the Republic, there were two separate provinces in the region: İçel, centered in Silifke, and Mersin, centered in Mersin, including Tarsus. During the Atatürk period, these two provinces were merged. The name İçel originally means İç-il 'sheltered area' and dates back to the Karamanid-Ottoman wars.

In other words, except for Istanbul and Izmir, the other two names are not the official names of our provinces, but unofficial names.

In this case, I would like to start a campaign so that the rights of Iğdır and Isparta will not be defeated due to an omission. I would like to ask the authorities to revise the tender as 5 ships. :)

F516 TCG İZMİR
F517 TCG İZMİT
F518 TCG İÇEL
F519 TCG ISPARTA
F520 TCG IĞDIR
 

Quasar

Contributor
The Post Deleter
Messages
734
Reactions
51 3,280
Nation of residence
Turkey
Nation of origin
Turkey
In the corner of trivia today:

Izmit is actually the name of the central district of Kocaeli. Kocaeli provincial borders include the districts that are extensions of Istanbul, but it is the industrial zones and factories that make the province whole. Kocaeli actually means Izmit, but the provincial borders also include administrative units that are satellite districts of different provinces such as Istanbul.

İçel is not actually the name of a province. In 2002, a law changed the name of the province of İçel to "Mersin" and the name "İçel" has been completely out of use since then. With a 2008 law, the first tier municipalities in metropolitan cities were abolished and transformed into district municipalities. Until the Republic, there were two separate provinces in the region: İçel, centered in Silifke, and Mersin, centered in Mersin, including Tarsus. During the Atatürk period, these two provinces were merged. The name İçel originally means İç-il 'sheltered area' and dates back to the Karamanid-Ottoman wars.

In other words, except for Istanbul and Izmir, the other two names are not the official names of our provinces, but unofficial names.

In this case, I would like to start a campaign so that the rights of Iğdır and Isparta will not be defeated due to an omission. I would like to ask the authorities to revise the tender as 5 ships. :)

F516 TCG İZMİR
F517 TCG İZMİT
F518 TCG İÇEL
F519 TCG ISPARTA
F520 TCG IĞDIR
And for compensation Iğdır and Isparta should have an additional 16 VLS cells :devilish:
 
Last edited:

Afif

Experienced member
Moderator
Bangladesh Correspondent
DefenceHub Diplomat
Bangladesh Moderator
Messages
4,754
Reactions
94 9,090
Nation of residence
Bangladesh
Nation of origin
Bangladesh
Does anyone know how much the Istanbul class frigate would cost after the introduction of Hisar RF, Mildas VLS, as well as another weapon system/Electronics? Still in the same price range of 350-400 million per I-class?
It should be.
 

Test7

Experienced member
Staff member
Administrator
Messages
4,785
Reactions
19 19,937
Nation of residence
United States of America
Nation of origin
Turkey
Turkish Navy AH-1W Super Cobra

IMG_20221223_184056.jpg
 

Anmdt

Experienced member
Naval Specialist
Professional
Messages
5,503
Solutions
2
Reactions
118 24,893
Nation of residence
Turkey
Nation of origin
Turkey
Finally!
And of course at the moment we don’t know which yard and when, right?
Y'all don't know it yet?

It is known since weeks ago, even prior to the SSIK. There are people who knows it, yet it is not secret even after SSIK wonder why some are not able to reach to this information.

Hint, they have gone for the most unexpected yet the most logical.
 

Anmdt

Experienced member
Naval Specialist
Professional
Messages
5,503
Solutions
2
Reactions
118 24,893
Nation of residence
Turkey
Nation of origin
Turkey
And additional information with respect to last SSIK,
I-Class was not the only project that went through, not every single decision is shared to public. We will see some RFI / RFPs within next year, likely in first half if it is done, regarding to those projects. (Or simply watching the signature ceremony if they have decided to skip proposal stage and assigned it to a company).
 

Radonsider

Contributor
Messages
1,467
Reactions
14 2,802
Nation of residence
Turkey
Nation of origin
Bosnia & Herzegovina
For example? TF-2000?
And additional information with respect to last SSIK,
I-Class was not the only project that went through, not every single decision is shared to public. We will see some RFI / RFPs within next year, likely in first half if it is done, regarding to those projects. (Or simply watching the signature ceremony if they have decided to skip proposal stage and assigned it to a company).
 

Anmdt

Experienced member
Naval Specialist
Professional
Messages
5,503
Solutions
2
Reactions
118 24,893
Nation of residence
Turkey
Nation of origin
Turkey
TF2000 is a done deal, it needs no SSIK to commence. In fact, going on at preliminary design stage since last (2022) June.

The company that will conduct "main contractor" duties for detail design ( production design) and prototype construction (first hull) is also selected (through a rumored, however, not existing tender process). Since there is a time until preliminary design stage is concluded, it needs no SSIK at the moment.
For example? TF-2000?
 

Anmdt

Experienced member
Naval Specialist
Professional
Messages
5,503
Solutions
2
Reactions
118 24,893
Nation of residence
Turkey
Nation of origin
Turkey
Gonna guess possibly TF-2000 „Prototype“, TTFAC, MCM and unlikely but maybe even two more Bayraktar-Class LST for which there was talk a couple years back.

MILDEN feels early.
Yes, it is pretty early for MILDEN, it is yet to mature in preliminary design stage and go through tunnel tests (also maneuver tests at model scale). And MILDEN DPO is conducting these duties on their own and they have started to assign subsystem contracts for R&D.

TTFAC is a complicated matter but it is also concluded at last SSIK that how it is going to be realized.

MCM is also concluded but still waiting for conceptual design to mature by Pendik Shipyard DPO. It is unclear whether they will go with "here is our concept make it real" and then RFP, or "show us your solution based on these requirements" with an RFI then RFP. It is discussed at SSIK with no conclusion since the requirements are not finalized.

LST, is no-go for next 2 years, at least.
 

BalkanTurk90

Contributor
Messages
658
Reactions
5 1,028
Nation of residence
Albania
Nation of origin
Turkey
And additional information with respect to last SSIK,
I-Class was not the only project that went through, not every single decision is shared to public. We will see some RFI / RFPs within next year, likely in first half if it is done, regarding to those projects. (Or simply watching the signature ceremony if they have decided to skip proposal stage and assigned it to a company).
We just want to know if 3 other Istanbul frigates have start to be build or not?
I dont got a clear answer yet , only words that dont understand .... 😡
 

Anmdt

Experienced member
Naval Specialist
Professional
Messages
5,503
Solutions
2
Reactions
118 24,893
Nation of residence
Turkey
Nation of origin
Turkey
We just want to know if 3 other Istanbul frigates have start to be build or not?
I dont got a clear answer yet , only words that dont understand .... 😡
Told you, it is already awarded. All three hull will be constructed simultaneously, however a slight phase shift (4-7 months) is expected to allow system integration to be carried out sequentially.
 

Radonsider

Contributor
Messages
1,467
Reactions
14 2,802
Nation of residence
Turkey
Nation of origin
Bosnia & Herzegovina
TF2000 is a done deal, it needs no SSIK to commence. In fact, going on at preliminary design stage since last (2022) June.

The company that will conduct "main contractor" duties for detail design ( production design) and prototype construction (first hull) is also selected (through a rumored, however, not existing tender process). Since there is a time until preliminary design stage is concluded, it needs no SSIK at the moment.
But why is it still in designing phase? What kind changes happened to the mod we have seen at fairs etc?


it is really mind boggling for me
 

Anmdt

Experienced member
Naval Specialist
Professional
Messages
5,503
Solutions
2
Reactions
118 24,893
Nation of residence
Turkey
Nation of origin
Turkey
But why is it still in designing phase? What kind changes happened to the mod we have seen at fairs etc?


it is really mind boggling for me
Preliminary design stage is continuation of conceptual design stage, where in the latter only general decision is made, design is made coarsely and in the prior the detailing took up to a certain degree to check applicability.

The changes will be invisible to eye, and i don't think scaled models will vary much in the following fairs.
 

Anmdt

Experienced member
Naval Specialist
Professional
Messages
5,503
Solutions
2
Reactions
118 24,893
Nation of residence
Turkey
Nation of origin
Turkey
Preliminary design stage is continuation of conceptual design stage, where in the latter only general decision is made, design is made coarsely and in the prior the detailing took up to a certain degree to check applicability.

The changes will be invisible to eye, and i don't think scaled models will vary much in the following fairs.
Give or take, roughly these stages are shown in the following image
Initial design + Basic design is "preliminary design"
some portion of detail design is "contract design, functional design" where true cost estimates can be made
some portion of detail design + manufacturing is "detail design" or also known as "production design"

1672066265187.png
 

Brave Janissary

Well-known member
Messages
325
Reactions
5 666
We can make a sub, design a sub etc...
Without Atılay Class Our most older subs can be operational +12 year easily.

There is a any possibilty about vls and aip module upgrade for Preveze or Gür Class ?

Yes Greeks seek a high costs and problems in Okeanos program but we can class him more effectivelly.
 

Follow us on social media

Top Bottom