TR Propulsion Systems

comolokko

Committed member
Messages
156
Reactions
313
Nation of residence
Turkey
Nation of origin
Turkey
That means Kale was not fit for the job but TEI was.
they had to make rd and produce up to the screw of the engine. they have set up adequate infrastructure. production times for new engines will be very short in future projects.
 

NitricAcid

Active member
Messages
97
Reactions
2 751
Nation of residence
India
Nation of origin
India

Kale R&D and National Turbojet Engine Solutions​

The 'Turbojet Engines Development Project Agreement' signed on February 22, 2012 is considered an important milestone in the development of the Turkish Defense and Aviation Industry. While the Turbojet Engines Development Project, carried out by Kale Arge under the administration of the SSB, was planned to be completed in 4 years, since the ecosystem required for the development of gas turbine engines in our country did not exist at that time, the Company created a gas turbine engine from scratch as well as turbomachinery design, Electronic Control Unit, Control Software, Fuel. It could only be completed in 10 years since it had to be developed with all sub-systems and test infrastructure including the Control System, Alternator and Igniters.​

April 22, 2022

İbrahim SÜNNETCI & Saffet UYANIK

Although the development of the KTJ-3200, which is the first national turbojet engine optimized for use on unmanned platforms, has turned into a very tiring and challenging process for Kale R&D Company, the Company today, with its know-how, competent manpower and technical infrastructure, gained from this project both in Turkey and abroad. KTJ Series can carry out 4 different turbojet engine development projects at the same time, for domestic and foreign customers.

WhatsApp%20Image%202022-04-22%20at%2009_27_53.jpeg


Speaking at the 1st Aviation and Space Propulsion Systems Congress held at Gebze Technical University on April 20, 2022, Kale Group Vice Chairman of the Board of Directors and Head of Technical Department Osman OKYAY said, “The Turbojet Engines Development Project of Kale Arge, one of the 9 companies within the Kale Group. He conveyed to the audience the difficulties he experienced while developing the KTJ-3200 Turbojet Engine, the lessons learned, the capabilities gained, and the new turbojet engine projects that could be implemented in a short time as a result of these capabilities, with striking information.

WhatsApp%20Image%202022-04-22%20at%2009_27_56(1).jpeg


Turbojet Engines Development Project and KTJ-3200 Development Process
Kale Arge Company was established in 2013 to conduct research and development studies on subjects falling within the vision fields of Kale Group Technical Group Companies. Under the 'Turbojet Engines Development Project Contract', Kale Arge assumed the responsibility of developing the KTJ-3200 Turbojet Engine, which will be completely domestic and national, including all its controls and accessories. Turkey had to develop all the technology and critical sub-systems needed, as there is a serious deficit in terms of the technological infrastructure and the ecosystem in Turkey. For example, At that time, there was no company in Turkey that had previous studies and experience on the Electronic Control Unit, Fuel Pump, Pyrotechnic Igniters, Alternator and Bearing, which are the critical sub-systems of the KTJ-3200 Turbojet Engine. Therefore, Kale Arge had to develop and produce not only the core and main system of the engine, but also its sub-systems within the Kale Group, that is, it also carried out R&D during the product development process. However, the most ideal product development process starts after the development of the technologies to be used in the product. When we look at the world, we see that engine manufacturers first develop the sub-critical technologies that will enter that engine and then develop the engine. In his speech, OKYAY defined attempting to build an engine without critical technology as “the biggest mistake that can be made”.



Therefore, Kale Arge carried out both P&D and R&D activities under the Turbojet Engines Development Project. pioneered the formation of the ecosystem. In this process, for example, more than two years were spent for the acquisition and production of pyrotechnic igniter technology (it is not easy to start the engine in a missile flying at about 1 Mach sound speed at an altitude of 5,000 meters, it is like trying to light a cigarette in a 150km/h wind). . While the bearings used in the engine were previously available from abroad, there was a problem in the supply of bearings on the grounds that the KTJ-3200 Engine would be used in missiles. Currently, bearings of different structures and types can be produced according to the needs of the turbojet engine.

Within the scope of the Turbojet Engines Development Project, Kale Arge also achieved many important technological achievements, primarily mechanical design analysis, aerodynamic design analysis, system engineering on turbo machines and engine control algorithms. As a result, at the end of a very tiring and challenging process, critical sub-systems such as Electronic Control Unit, Fuel Pump/Fuel Control System, Pyrotechnic Igniters, Alternator and Bearing, which are critical sub-systems to be used in small turbojet engines, have now turned into off-the-shelf products. the way for new engine development projects has been opened.

WhatsApp%20Image%202022-04-22%20at%2009_27_56%20(1)(1).jpeg


Undoubtedly, one of Kale Arge's most important achievements during the development of the KTJ-3200 Engine is the Altitude Test System, which is the product of nearly two years of effort. All control software, test control system software and software running on computers that collect engine data, used in the Altitude Test System located in the Kale Arge Tuzla Development and Test Center campus, were developed by Kale Arge, where the engine was tested at an altitude of 5,000 meters (15,000ft) and speeds up to 0.95 Mach. can be achieved. Emphasizing that the Altitude Test System, whose infrastructure work took about 2 years, is of vital importance for the turbojet engine development process, OKYAY said, “It is not possible to develop an engine by testing it only in the bremze. You can never be sure of how the engine will behave at altitude.

Kale Arge also continues its studies to increase the working/test altitude conditions of the Altitude Test Arrangement/System to 10,000 meters for the tests of both the ARAT Project and the KTJ-3700 Turbojet Engine. In this way, the weather conditions 10,000m above the ground will be simulated and it will be possible to observe how the engine behaves in those conditions with the tests.



OKYAY shared the following information about the working characteristics of the Altitude Test Rig/System: “Here, you produce 10kg of air per second in your compressors, then you dry that air because the air is dry above and you cool it down to -50°C. Take these values between 0°C, -50°C and 0m, 5.000m, of course. After that, you feed this air into the mouth of the engine, because such air enters the mouth of the engine when it flies. Then you take this engine into a chamber and vacuum it up to 0.3 bar because the pressure is low at high altitude. Thanks to this infrastructure, you can test at any altitude (between 0 and 5,000 meters), at any air temperature (between 0°C, -50°C) and at any flight speed. You enter these data, the system adjusts accordingly and performs the altitude test. You collect the data obtained from here with the engine data on another computer working simultaneously with the Test Control Computer, so that you can make a one-to-one match. To see how the engine behaves at what altitude, temperature, speed. Those two computers have to work very well with each other.”
In
addition to the Altitude Test System, Kale Arge Tuzla Development and Test Center also has a Field Type Test Rig (Bremze) and Combustion Chamber Test System, as well as Control and Accessory Test Rigs for sub-systems such as Alternator, Fuel Pump, Pyrotechnic Igniter and Electronic Control Unit. Field type tests are very important especially for strength tests, and special engine tests such as water intake, sand intake and air disturbance are performed here.

WhatsApp%20Image%202022-04-22%20at%2009_27_54%20(2).jpeg


KTJ-3200

Kale Arge's first engine, KTJ-3200, was developed for SOM (SAGE) and ATMACA (ROKETSAN) Missiles. KTJ-3200 Turbojet Engine, consisting of a 4-stage axial compressor, annular combustion chamber and a single-stage turbine, with a thrust power of 3,200N (Newton), is 63cm in length, approximately 30cm in diameter and 50kg in weight. KTJ-3200, which has low fuel consumption and can be launched at different altitude/speed conditions, is designed to operate at 5,000m altitude and Mach 0.95 speed in accordance with the duty envelope of SOM ALCM and ATMACA Anti-Ship Cruise Missile. The Altitude Test System in the Kale Arge Tuzla Development and Test Center campus played an important role in the development and testing process of the KTJ-3200, which has a pyrotechnic igniter and windmilling feature. Developed completely domestically and nationally, the engine is exempt from all export restrictions and all its components are produced in Turkey. The qualification process of the KTJ-3200 Engine has been successfully completed and mass production has begun. In the first phase, 50 units are expected to be delivered this year.

WhatsApp%20Image%202022-04-22%20at%2009_27_54%20(3).jpeg


KTJ-3700
Producing more thrust than KTJ-3200, KTJ-3700 is a project of Kale Arge with its own resources. It is aimed to weigh 50kg, have an altitude of 10,000 meters and a flight speed of 0.95 Mach. Kale Arge continues its studies to increase the parallel test setup to 10,000 meters. It is planned to start tests with the KTJ-3700 in the second quarter of 2022, following the completion of the work on the test setup.

WhatsApp%20Image%202022-04-22%20at%2009_27_55.jpeg


KTJ-1750

The smaller engine, the KTJ-1750, is expected to have a power of 1,750N, a weight of 17kg and a speed of Mach 0.95. It is planned to complete the tests and start mass production in the third quarter of 2022.

WhatsApp%20Image%202022-04-22%20at%2009_27_55%20(1).jpeg


ARAT Engine

It is a turbojet engine to be developed locally and nationally by Kale Arge. Very low fuel consumption and high thrust capacity are expected. Aiming to be an advanced engine, ARAT will be exempt from all kinds of export restrictions as in other engines. The ARAT Project was started as of November 2021, after the approval of SSİK. Although the date given for the development process is 40 months, Kale Arge aims to complete the project in 30 months.

Editor's Note:

Kale Arge carries out the Serial Production of the KTJ-3200, a completely domestic and national turbojet engine, including all its controls and accessories, critical components such as bearings (made of steel material), entirely with domestic resources and especially with the maximum use of Kale Group's technical capabilities. The year 2022 will pass with both the integration and serial production of the KTJ-3200 and the qualification of new engines. Kale Arge will further enlarge and develop its production and test infrastructure in this process. Kale Arge General Manager Cüneyt KENGER shared the following information about Kale Arge's current production and testing infrastructure and annual production capacity in the interview we held in our 110th issue: “Kale Arge acts as an "integrator" in terms of mass production. In other words, we carry out the management of the supply chain, assemblies and testing/evaluation. Our current production plan has been determined as 150 engines per year based on the needs. Our production capacity is well above these numbers...”
Due to their small size and low weight, there is a misconception among the public that small turbojet engines are products that are easy to develop and produce. In fact, the production of an aviation-quality small turbojet engine for aircraft represents a more challenging process in terms of engineering compared to the production of large turbojet engines. On the other hand, although the Altitude Test Assembly/System represents an important test infrastructure in the small turbojet engine development process, it is possible to develop a turbojet engine without having such a test infrastructure. For example, PBS Velka Bites Company, which is one of the world's leading turbojet engine manufacturers and has an important place in the market, does not have an Altitude Test System as far as I know.

The KTJ-3700 engine is a new engine developed for different conditions with the dimensions of the KTJ-3200 but with its renewed aerodynamic design. It has higher thrust and lower specific fuel consumption thanks to its renewed aerodynamic design (with only aerodynamic improvement in the TR40 TJ Engine, an approximately 8% improvement in fuel consumption was achieved). Fuel lubrication technique is used in both engines. However, Kale Arge also worked on closed circuit oil lubricated versions of engines. Additional weight in engines (such as oil tank, oil hose and pump addition)

Developed under the Improved Turbojet Engine Project, ARAT is a separate engine from the KTJ-3700 and a domestic and unique turbojet engine to be used under the Mass Production Phase of the new cruise missile, which has superior features and longer range than both SOM and ATMACA Cruise Missiles. ARAT is still expected to have similar features to the turbojet engine supplied from abroad for the new cruise missile in question.

Yaz%C4%B1%20alt%C4%B1.jpg


KTJ-3200 TJ Engine and accessories used (from right to left): Electronic Control Unit, Fuel Pump and Fuel Control System, Pyrotechnic Ignitor and Alternator.
 
Last edited:

TheInsider

Experienced member
Professional
Messages
3,811
Solutions
1
Reactions
27 13,686
Nation of residence
Turkey
Nation of origin
Turkey
Kale has zero problems with production capacity. Kale can easily deliver 3-5 times the current amount and can deliver 1000 engines per year with a small expansion. The real limiting factor is how many missiles we are planning to produce per year and how much budget we have.
 

Cabatli_TR

Experienced member
Staff member
Administrator
Messages
5,369
Reactions
80 45,485
Nation of residence
Turkey
Nation of origin
Turkey
Mr. Akşit:
"We made a more powerful engine than the engine in the ATAK helicopter. It reached 1400 horsepower. It passed the tests. We are testing the more powerful ones. Our nation will hear them soon"
 

Mustafa27

Committed member
Messages
216
Reactions
2 589
Nation of residence
United Kingdom
Nation of origin
Turkey
Mr. Akşit:
"We made a more powerful engine than the engine in the ATAK helicopter. It reached 1400 horsepower. It passed the tests. We are testing the more powerful ones. Our nation will hear them soon"
I wonder if one of them is the ts-3000 considering they have been working on it for a while.
 

Lool

Experienced member
DefenceHub Diplomat
Messages
2,726
Reactions
11 4,731
Nation of residence
Albania
Nation of origin
Albania
TEI General Manager and Chairman of the Board Prof. Dr. Mahmut Faruk Aksit:
- Some European companies are hooking our employees on the spot to disband the team!
- They offer abnormal wages, wages that are not available in world markets!

Did they specify whether such workers actually left TEI to work in such companies or not?
Hope such engineers are patriotic enough to continue investing in Turkey since such EU companies are doing so to prevent Turkey from obtaining a strong defemce industry
 

Lool

Experienced member
DefenceHub Diplomat
Messages
2,726
Reactions
11 4,731
Nation of residence
Albania
Nation of origin
Albania
Mr. Akşit:
"We made a more powerful engine than the engine in the ATAK helicopter. It reached 1400 horsepower. It passed the tests. We are testing the more powerful ones. Our nation will hear them soon"
Does he mean that the new powerful engine produces 1400 hp or surpasses that level since tei ts-1400 is producing around the range of 1400 hp already
 

comolokko

Committed member
Messages
156
Reactions
313
Nation of residence
Turkey
Nation of origin
Turkey
TEI General Manager and Chairman of the Board Prof. Dr. Mahmut Faruk Aksit:
- Some European companies are hooking our employees on the spot to disband the team!
- They offer abnormal wages, wages that are not available in world markets!

foreign powers or outposts are everywhere. this is a trade. competition is everywhere.. don't make excuses, do the job.
 
Last edited:

Saithan

Experienced member
Denmark Correspondent
Messages
8,147
Reactions
21 18,742
Nation of residence
Denmark
Nation of origin
Turkey
Well, Even if foreign countries offer better salaries that won’t be enough to leave unless the work culture is bad. So I am with @Anmdt on this.
 

Timur

Well-known member
Chilli Specialist
Messages
311
Reactions
4 677
Nation of residence
Germany
Nation of origin
Turkey
Did they specify whether such workers actually left TEI to work in such companies or not?
Hope such engineers are patriotic enough to continue investing in Turkey since such EU companies are doing so to prevent Turkey from obtaining a strong defemce industry
I think offer them houses maybe like 4 apartments with land if they stay 20 years would be good we should be creative..

Also free coffee, soft drinks, food, 39 hours work.. 40 days free off time..
Paying for further education.. Are good to keep them

Top people should have top conditions
 

Saithan

Experienced member
Denmark Correspondent
Messages
8,147
Reactions
21 18,742
Nation of residence
Denmark
Nation of origin
Turkey
I think offer them houses maybe like 4 apartments with land if they stay 20 years would be good we should be creative..

Also free coffee, soft drinks, food, 39 hours work.. 40 days free off time..
Paying for further education.. Are good to keep them

Top people should have top conditions
Don’t forget salary in any currency they wish. Euro, USD and such.

TBH the housing is not attractive. Not with how it’s done in Turkey. Unless they’re built and supervised and QC by Japanese. That’s how bad construction is in Turkey.
But I’ve always wondered if they have statistics on how many researcher are leaving compared to those who are coning back.
 

what

Experienced member
Moderator
Messages
2,045
Reactions
9 6,054
Nation of residence
Germany
Nation of origin
Turkey
Well if you cant pay as much, you can always give stock options to your employees as part of their pay package. That way they will profit from the products they develop and the success of the company they work for. But TAI is not a public traded company.
 

comolokko

Committed member
Messages
156
Reactions
313
Nation of residence
Turkey
Nation of origin
Turkey
:D he is saying it like TEI is a huge superpower engine manufacturer. Yeah blame it on foreign powers. What about making better workplaces for your staff? What about stopping mobbings, political discrimination ?
the world class salary of this type of engineer is at least $10,000. + social rights and security facilities. if tai's average salary is $3,000, I'd say very good.
tai browse
lockheed martin browse
rolls-royce browse
 

Yasar_TR

Experienced member
Staff member
Administrator
Messages
3,031
Reactions
112 14,723
Nation of residence
United Kingdom
Nation of origin
Turkey
Mr. Akşit:
"We made a more powerful engine than the engine in the ATAK helicopter. It reached 1400 horsepower. It passed the tests. We are testing the more powerful ones. Our nation will hear them soon"
This is the news he gave us all. But there is more important information lying there between the lines.
Current Atak-T129 CT-800 engine develops 1298HP continuous power. Our TS-1400 engine has a continuous power output of 1400HP.
CT-800 develops 1375HP at take off. But TS-1400 develops 1475HP at take off.
So the engine in hand has a lot more brawn and raw power available than the current engine.
He says they are trying for even attaining more from this engine and we will be notified in due course.
 

Merzifonlu

Contributor
Think Tank Analyst
DefenceHub Diplomat
Messages
691
Reactions
24 2,053
Nation of residence
Turkey
Nation of origin
Turkey
"We will build the MMU engine in 10-12 years, but it will be a little bigger in diameter, that's what was discussed." said Prof. Akşit. He also said that the TFX body was designed before the engine, which is a flawed approach.

I think that they have turned to RR origin engine because both the development time of the TEI engine is longer and the engine diameter is larger than expected.

I think they are taking a huge risk. It seems that they have not learned a lesson from the Altay disgrace...
 

Follow us on social media

Top Bottom