SAAB guy basically says passive sensors are way more important than previously thought, especially combined with sensor fusion. He also throws away the idea that stealth is the end-all-be-all solution. Especially western defence enthusiasts would hate this take.
 

UkroTurk

Experienced member
Land Warfare Specialist
Professional
Messages
2,451
Reactions
30 4,295
Nation of residence
Turkey
Nation of origin
Turkey
Ground radar might detect a stealth fighter at close distance however active radar seeker of missiles can not detect.
 

Umigami

Experienced member
Moderator
Indonesia Moderator
Messages
6,099
Reactions
5 4,929
Nation of residence
Indonesia
Nation of origin
Indonesia
Can I ask a bit?
When is 2nd prototype roll out?
Is it the same design (shape) as the first?
 

Spitfire9

Well-known member
Messages
393
Reactions
8 509
Nation of residence
United Kingdom
Nation of origin
United Kingdom
I wonder when the claim that TuAF will receive KAAN in 2028 will be shelved and a revised schedule will be announced. I don't see how the necessary testing can be completed, production started, aircraft built and delivered with no flight testing of production-representative aircraft until 2025 at the earliest. Several flying airframes will be needed to compress the time required for flight testing. Zero (I discount the first prototype) exist today.
 

uçuyorum

Contributor
Messages
818
Reactions
10 1,337
Nation of residence
Turkey
Nation of origin
Turkey
I wonder when the claim that TuAF will receive KAAN in 2028 will be shelved and a revised schedule will be announced. I don't see how the necessary testing can be completed, production started, aircraft built and delivered with no flight testing of production-representative aircraft until 2025 at the earliest. Several flying airframes will be needed to compress the time required for flight testing. Zero (I discount the first prototype) exist today.
Well it could be a pre acceptance
 

Yasar_TR

Experienced member
Staff member
Administrator
Messages
3,101
Reactions
126 15,214
Nation of residence
United Kingdom
Nation of origin
Turkey
Can I ask a bit?
When is 2nd prototype roll out?
Is it the same design (shape) as the first?
As far as I can recall, this current KAAN will probably make another flight before the end of the year. The second prototype is being built. It should be ready to fly early next year with all the necessary alterations made with the information and data gathered from the initial flights of the current prototype.
According to media reports:
Turkish Aerospace Industries (TAI) is nearing completion of the second prototype of its fifth-generation fighter jet, KAAN, which it is developing to commence flight testing.

According to Avionot.com, assembly of the second KAAN prototype and engine integration are expected to be finalized in June and July.

Subsequently, this prototype will begin comprehensive flight tests followed by the other KAAN prototypes.


According to TAI, there will be 14 prototypes of KAAN. Last two that will be built in 2028, will have indigenous engines powering them.
So there will be 11 more prototypes from which TAI will receive data to build the serial production units of block 10.
 

Umigami

Experienced member
Moderator
Indonesia Moderator
Messages
6,099
Reactions
5 4,929
Nation of residence
Indonesia
Nation of origin
Indonesia
As far as I can recall, this current KAAN will probably make another flight before the end of the year. The second prototype is being built. It should be ready early next year with all the necessary alterations made with the information and data gathered from the initial flights of the current prototype.
According to media reports:
Turkish Aerospace Industries (TAI) is nearing completion of the second prototype of its fifth-generation fighter jet, KAAN, which it is developing to commence flight testing.

According to Avionot.com, assembly of the second KAAN prototype and engine integration are expected to be finalized in June and July.

Subsequently, this prototype will begin comprehensive flight tests followed by the other KAAN prototypes.


According to TAI, there will be 14 prototypes of KAAN. Last two that will be built in 2028, will have indigenous engines powering them.
So there will be 11 more prototypes from which TAI will receive data to build the serial production units of block 10.
If I remember correctly, the second and so on will have different canopy and radome design than the first prototype.

But I can't find the source anymore
 

Spitfire9

Well-known member
Messages
393
Reactions
8 509
Nation of residence
United Kingdom
Nation of origin
United Kingdom
As far as I can recall, this current KAAN will probably make another flight before the end of the year. The second prototype is being built. It should be ready to fly early next year with all the necessary alterations made with the information and data gathered from the initial flights of the current prototype.
According to media reports:
Turkish Aerospace Industries (TAI) is nearing completion of the second prototype of its fifth-generation fighter jet, KAAN, which it is developing to commence flight testing.

According to Avionot.com, assembly of the second KAAN prototype and engine integration are expected to be finalized in June and July.

Subsequently, this prototype will begin comprehensive flight tests followed by the other KAAN prototypes.


According to TAI, there will be 14 prototypes of KAAN. Last two that will be built in 2028, will have indigenous engines powering them.
So there will be 11 more prototypes from which TAI will receive data to build the serial production units of block 10.
So, first near production-representative prototype will start test flights 2025. In 2026 3/4(?) aircraft will be conducting test flights?

Will TAI start production before testing is complete?
 

uçuyorum

Contributor
Messages
818
Reactions
10 1,337
Nation of residence
Turkey
Nation of origin
Turkey
So, first near production-representative prototype will start test flights 2025. In 2026 3/4(?) aircraft will be conducting test flights?

Will TAI start production before testing is complete?
Well as you saw hürjet prototype is doing whatever it wants at such early stage, i'd imagine they could do a sort of lrip of the prototype before tests are done
 

Yasar_TR

Experienced member
Staff member
Administrator
Messages
3,101
Reactions
126 15,214
Nation of residence
United Kingdom
Nation of origin
Turkey
So, first near production-representative prototype will start test flights 2025. In 2026 3/4(?) aircraft will be conducting test flights?

Will TAI start production before testing is complete?
As you probably know a jet fighter like this being produced from scratch is an ever evolving project. Every single prototype produced will serve the purpose to improve upon the previous one; until it is decided it is mature “enough” to be applied to serial production. Whilst serial production is being realised, the plane’s design and evolution doesn’t stop. It is carried on and new ideas and parts are added to the next block.

Here the important point is, when TAI will say the block 10 is ready for serial production. We have nearly 3.5 to 4 years for this to happen according to the last timeline given to us. Once BURFIS and air to air missiles with major avionics are integrated to the plane it can start it’s interceptor role. Then other missiles and munitions can be integrated in time until block 20 comes along.
There is no completion of testing. This plane will evolve during testing and manufacturing towards being 6th generation , or at least 5.5 generation.
Once it can pass through the basic requirements it could start serving the airforce in one form or another as a 4.5 generation aircraft.
 