Could it be that Aselsan and some other companies working for KAAN are ahead of schedule?
The target date was always 2026.
Last edited by a moderator:
Latest Thread
Could it be that Aselsan and some other companies working for KAAN are ahead of schedule?
It is a mock-up.KAAN's radar, MURAD 600
![]()
i wonder if this is representative of the latest design or an old mock-up they, conveniently, bring from fair to fair.
yes that's obvious but is it updated? Is it worth to count the T/R modules of this mockup is what I'm trying to ask.It is a mock-up.
To me that mockup looks smaller than MURAD-100.
No, it is intentionally distorted. Details of Murad-600A are classified.yes that's obvious but is it updated? Is it worth to count the T/R modules of this mockup is what I'm trying to ask.
KAAN's but is already sticking out.they could have used the sticking out part.Maybe limits of power generation for the AESA radars or maybe because it's not useful to have a AESA radar sticking out of KAAN's butt![]()
You can’t stick that butt out too much. With afterburners on, it gets too hot there.KAAN's but is already sticking out.they could have used the sticking out part.
View attachment 76659
@Yasar_TR abi,could they have used the ''butt'?
There's no reason for APU exhaust to be that large.
If the radar is only 270 degrees then the middle between the engines is either for drag chute or apu . Or they changed design.
The F-35 has no das component in the rear . How do you know this?They will have an array there.
Also IRIS-300 is the Turkish DAS
My guess is that they will be close to F-16s AESAhow powerful are side arrays compared to the nose mounted radar? the modules on the wings have to conform to the shape of the wing, no? so I assume they will be less powerful than MURAD-600? and will they also be X-band?
do we know if they will be on the wings or on the cheeks?My guess is that they will be close to F-16s AESA
Cheeksdo we know if they will be on the wings or on the cheeks?
P1 was supposed to fly this year according to the statement he gave July last year when he took over from Kotil.New Statements from Demiroğlu About KAAN!
TUSAŞ General Manager Dr. Mehmet Demiroğlu:
"In the upcoming April, we will see the first flying prototype 1, and three months after that, the second prototype will also take flight. Currently, we are working on 3 prototypes being prepared for flight."
"In addition to those, we are working on one static aircraft, making a total of 4 aircraft in development. Later, we will build 3 more. Hopefully, we will begin our first deliveries to the Turkish Air Force around 2028–2029."
www.defenceturk.net
www.savunmasanayist.com
It is not that bad. Delivery at the end of 2028 was never a realistic date anyway. A delay in the delivery of a simple component can cause several weeks of delay. They were like pushing crazy counting days and weeks to arrive at the end of 2028. I don't know why, maybe because SSB is against buying Eurofighter and F-16/F-35 while MSB want to buy Eurofighter and F-16/F-35. It is to say, look, you will get the first fighter 3,5 years from now. The first half of 2029 is a realistic target.P1 was supposed to fly this year according to the statement he gave July last year when he took over from Kotil.
![]()
KAAN'ın diğer prototipleri daha fazla uçacak
TUSAŞ Genel Müdürü Mehmet Fatih Demiroğlu, milli muharip uçak KAAN'ın test sürecine ilişkin açıklamalarda bulundu.www.defenceturk.net
Now it is second quarter of next year.
One thing he is good at; each time he opens his mouth to give a date he postpones something as if it is the first time he is saying it. And nobody seems to question him.
Just this year in Technofest he said 2 KAANs will fly this year. Then in the same speech he changed it to one will fly this year the other early next year.
![]()
TUSAŞ'tan KAAN için çifte uçuş müjdesi | SavunmaSanayiST
TUSAŞ Genel Müdürü Mehmet Demiroğlu, TEKNOFEST KKTC’de SavunmaSanayiST'ye KAAN ve HÜRJET projelerine dair açıklamalarda bulundu.www.savunmasanayist.com
Who will believe him now???