Something seems to be going quite wrong with Land Vehicle Programs in the hands of FNSS.
Don't get me wrong, I am by no means an Expert but the given Dates cannot be achieved it seems.
- FNSS ACV-15 Modernization
The Infos on the Program are Sparse but no real Delivery in sight. with Changing Prototypes.
View attachment 36434
This is not that big of a Modernization effort as well.
- FNSS Pars IV
View attachment 36435
Türk Silahlı Kuvvetleri'nde Pars 6x6 Taktik Tekerlekli Zırhlı Araç dönemi başlıyor 6x6 Pars Taktik Tekerlekli Zırhlı Araç ile ilgili olarak
www.defenceturk.net
The first deliveries of Pars IV 6×6 Mine Protected Vehicles, which will be the first in the TAF inventory, will be made in 2021.
The initial 12 Deliveries were scheduled for 2021 but no Info as December approaches.
- FNSS Pars IZCI 6x6 and 8x8
View attachment 36436
Toplam 36 aylık proje takvimine sahip olan ÖMTTZA projesinde 1 yıl içerisinde 100 aracın teslim edilmesi planlanıyor.
www.defenceturkey.com
In the ÖMTTZA project, which has a 36-month project schedule, it is planned to deliver 100 vehicles within 1 year.
March 17, 2021
That means they have to deliver 100 Pars IZCI in 4 Months but no Info on that one as well.
- FNSS ZAHA
CEO Kurt says "These 3 ZAHA will be delivered in the first half of 2021" Yet nothing on that as well.
- FNSS KAPLAN MT
View attachment 36437
"According to the 2019 contract, FNSS and PT Pindad must jointly produce a batch of 18 tanks.
The first Kaplan is ready, and all of the remaining ones are at various stages of construction. It is reported that the two manufacturers will complete the assembly of the first batch of equipment by the end of this year.
During IDEF-2021, plans for the near future were announced.
So, a second order for 52 tanks should appear soon. They should be built and handed over during 2022."
Here we have no Information as well on the Current Status of the Kaplan for set delivered untile the end of 2021 and they are supposed to built 52 in 2022.
4 per Month!
FNSS STA Project
View attachment 36438
Cumhurbaşkanlığı Savunma Sanayii Başkanlığı (SSB) ile FNSS Savunma Sistemleri A.Ş. arasında imzalanan sözleşme kapsamında yürütülen Silah Taşıyıcı Araçlar Projesi kapsamında ilk Silah Taşıyıcı Araç Türk Silahlı Kuvvetleri (TSK)’ne teslim edildi.
www.defenceturkey.com
Even here the Serial Production started quite late for my thinking.
FNSS General Manager and CEO K. Nail KURT said, “Our Weapons Carrier Vehicles contract, signed between the Presidency of Defense Industry and our Company in June 2016, for the KAPLAN STA vehicles offered to the use of the security forces after the qualification tests were completed in accordance with the project schedule. It includes a total of 260 vehicles
The Serial Production Deliveries Started in 04/2020.
Almost 4 Years after Contract signing. Isn't this a simple 2x ATGM Carrier or am I missing something.
I have no Idea if I am overthinking or if there is a problem here.